| TEST REPORTS 2024-25 | |||||
| Sl. No. | Report No. | Test Description | Customer | Date of issue | Download |
| 472 | CM460/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | CM 460/24-25 |
| 471 | CM456/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | CM 456/24-25 |
| 470 | CM455/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | CM 455/24-25 |
| 469 | CM454/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | CM 454/24-25 |
| 468 | CM453/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | CM 453/24-25 |
| 467 | CM425/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | CM 425/24-25 |
| 466 | CM416/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 416/24-25 |
| 465 | CM415/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 415/24-25 |
| 464 | CM409/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 409/24-25 |
| 463 | CM408/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 408/24-25 |
| 462 | CM407/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 407/24-25 |
| 461 | CM339/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 339/24-25 |
| 460 | CM338/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 338/24-25 |
| 459 | CM337/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 337/24-25 |
| 458 | CM336/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 336/24-25 |
| 457 | CM319/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 319/24-25 |
| 456 | CM318/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 318/24-25 |
| 455 | CM317/24-25 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.06.2025 | CM 317/24-25 |
| 454 | CM387/24-25 | Test on Rock Core Samples: Soil Investigation of Manivayal distributory located at chainage 1/540 m of Kolliyil Branch Canal of Karapuzha Irrigation Project. |
Deputy Director, Instrumentation Division, KERI, Peechi, Thrissur |
03.06.2025 | CM 387/24-25 |
| 453 | CM437/24-25 | Mix Design – Report of the Concrete Mix Design -M35 (Dalmia DSP PPC) Carried out for the Assistant Engineer, Irrigation Section, Koottayi. |
Assistant Engineer, Irrigation Section, Koottayi. |
24.05.2025 | CM437/24-25 |
| 452 | CM436/24-25 | Mix Design – Report of the Concrete Mix Design -M30 (Dalmia DSP PPC) Carried out for the Assistant Engineer, Irrigation Section, Koottayi. |
Assistant Engineer, Irrigation Section, Koottayi. |
24.05.2025 | CM436/24-25 |
| 451 | CM435/24-25 | Mix Design – Report of the Concrete Mix Design -M20 (Dalmia DSP PPC) Carried out for the Assistant Engineer, Irrigation Section, Koottayi. |
Assistant Engineer, Irrigation Section, Koottayi. |
24.05.2025 | CM435/24-25 |
| 450 | CM445/24-25 | Mix Design – Report of the Concrete Mix Design -M30 (Dalmia DSP PPC) Carried out for the Assistant Engineer, Irrigation Section, Ollukkara.-Construction of new Boat Jetty at Thriprayar East kadavu. |
Assistant Engineer, Irrigation Section, Ollukkara. |
22.05.2025 | CM445/24-25 |
| 449 | CM341/24-25 | Test on Steel : Report of the Test on Steel supplied by L.N.Malviya Infra Projects Pvt.Ltd, Bhopal. |
The Project Director, National Highway Authority of India, Project Implementation Unit – Cochin, Mavelipuram, Kakkanad. |
09.05.2025 | CM 341/24-25 |
| 448 | CM340/24-25 | Test on Cements : Report of the Test on Chettinad Cement (OPC 53 Grade & Bharathi Cements (OPC 53 Grade) supplied by L.N.Malviya Infra Projects Pvt.Ltd, Bhopal. |
The Project Director, National Highway Authority of India, Project Implementation Unit – Cochin, Mavelipuram, Kakkanad. |
09.05.2025 | CM 340/24-25 |
| 447 | CM 461/24-25 | Test on Steel:Construction of Check Dam cum Bridge at Karichalkadvu at Kattakambal Grama Panchayath |
Assistant Engineer, M. I Section, Kunnamkulam
|
24.04.2025 | CM 461/24-25 |
| 446 | CM446/24-25 | Sheet pile:Report of the Tests on Z Sheet Pile Supplied by the Assistant Engineer ,Minor Irrigation Section,Kumbala. |
Assistant Engineer, MI Section ,Kumbala. |
16.04.2025 | CM 446/24-25 |
| 445 | CM470/24-25 | Pile Echo Test :“CSIND – Construction of Lock cum bridge in CH: 316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dis |
Assistant Engineer, Irrigation Section No.2, Ponnani |
15.04.2025 | CM 470/24-25 |
| 444 | CM477/24-25 | Compressive strength of Hardened:General- construction of boat jetty at Enamavu in Thrissur District-Irrigation Section Kunnamkulam |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
09.04.2025 | CM 477/24-25 |
| 443 | CM476/24-25 | Compressive strength of Hardened:IND-Construction of sluice D/S of Chettuva bridge to prevent the entry of salt water through PC canal in Kadappuram Gramapanchayath. – Irrigation Section, Kunnamkulam |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
09.04.2025 | CM 476_24-25 |
| 442 | CM475/24-25 | Compressive strength of Hardened: General-Road work- Renovation works to the Karuvannur south bund road connecting between karuvannur valiyapalam & karalam panchayath.- Irrigation Section Irinjalakuda |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
09.04.2025 | CM 475_24-25 |
| 441 | CM474/24-25 | Compressive strength of Hardened: General-Construction of Boat Jetty at Eanamavu in Thrissur District. – Irrigation Section, Kunnamkulam |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
09.04.2025 | CM 474_24-25 |
| 440 | CM473/24-25 | Test on Steel: Extension of Moolathara Right Bank Canal from Korayar to Varattayar (Civil Works) in Eruthenpathy Panchayath,Palakkad District. |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
09.04.2025 | CM473/24-25 |
| 439 | CM472/24-25 | Compressive strength of Hardened: Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District. – Embankment superstructure wall. |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
09.04.2025 | CM 472/24-25 |
| 438 | CM471/24-25 | Compressive strength of Hardened: Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District. – Pier Lift (P46) |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
09.04.2025 | CM 471/24-25 |
| 437 | CM467/24-25 | Compressive strength of Paving Blocks:DTP TSR 2023-24 Clean Kadappuram Green K adappuram. |
Assistant Engineer, LSGD ,Kadappuaram Grama Panchayath. |
07.04.2025 | CM 467/24-25 |
| 436 | CM466/24-25 | Compressive strength of Paving Blocks:Proj no 36/24 Maintenance of Panchayath Office |
Assistant Engineer, LSGD ,Kadappuaram Grama Panchayath. |
07.04.2025 | CM 466/24-25 |
| 435 | CM465/24-25 | Compressive strength of Hardened Concrete:Project Villa at Kaloor -M20 Grade concrete of Plinth Beam Phase 1 |
M/s Olivia projects, Gayathri Apartment, Punkunnam |
07.04.2025 | CM 465/24-25 |
| 434 | CM464/24-25 | Compressive strength of Hardened Concrete:Construction of Project Villa at Kaloor-M20 Grade concrete of Raft Foundation Phase 1. |
M/s Olivia projects, Gayathri Apartment, Punkunnam |
0.7.04.2025 | CM 464/24-25 |
| 433 | CM463/24-25 | Compressive strength of Hardened Concrete:Construction of Feeding chal from Adampu Thodu to Thachampilly kulam in Arimpur Panchayath .Floor slab of Pump house no 2. |
M/s Olivia projects, Gayathri Apartment, Punkunnam |
07.04.2025 | CM 463/24-25 |
| 432 | CM469/24-25 | Test on Fencing Materials : Assessing the quality of materials in the materials to be used in Solar Hanging Fencing Paliyakkudy top to Mannakkudi top area. |
Range Forest Officer , Thekkady Range. |
07.04.2025 | CM 469/24-25 |
| 431 | CM468/24-25 | Test on Fencing Materials : Assessing the quality of materials in the materials to be used in Solar Hanging Fencing in Ponnar Colony to Randam Point in Erumely Range during 2024-25. |
Range Forest Officer ,Erumely Range. |
07.04.2025 | CM 468/24-25 |
| 430 | CM462/24-25 | Test on Fencing Materials : Assessing the quality of materials in the materials to be used in Solar Hanging Fencing in Karathodu zone ,Charpa Range. |
Range Forest Officer ,Charppa Range. |
03.04.2025 | CM 462/24-25 |
| 429 | CM438/24-25 | Compressive strength of Hardened Concrete:Anthikkad BP/2024-25-186/25-Buds School Skill Training Centre. |
Assistant Engineer, LSGD Subdivision, Anthikkad Block Panchayath |
03.04.2025 | CM 449/24-25 |
| 428 | CM437/24-25 | Concrete Mix Design (Interim Report):Construction of a Lock cum Brigde at Ch.329.756km of West Coast Canal near Koottayi RCB in Tirur-Ponnanipuzha in Mangalam Grama Panchayath,Maaalappuram District |
Assistant Engineer, Irrigation Section, Koottayi |
03.04.2025 | CM 437/24-25 |
| 427 | CM478/24-25 | Compressive strength of Hardened Concrete: Construction of Pandarachira checkdam across Manali river at Mulayam in Nadathara Grama Panchayath -Irrigation Section,Ollukkara. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
01.04.2025 | CM 478/24-25 |
| 426 | CM400/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 400/24-25 |
| 425 | CM399/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 399/24-25 |
| 424 | CM398/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, ThrissuR. |
29.03.2025 | CM 398/24-25 |
| 423 | CM395/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 395/24-25 |
| 422 | CM394/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 394/24-25 |
| 421 | CM393/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 393/24-25 |
| 420 | CM392/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 392/24-25 |
| 419 | CM388/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 388/24-25 |
| 418 | CM383/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 383/24-25 |
| 417 | CM439/24-25 | Test Results for Wawter Absorption : Hydrobloc additive admixed plastering mortar |
Izo Green, Sri Lakshmi Nagar, Bommanapalayam, Vadavalli. |
29.03.2025 | CM 439/24-25 |
| 416 | CM352/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 352/24-25 |
| 415 | CM351/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 351/24-25 |
| 414 | CM350/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 350/24-25 |
| 413 | CM349/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 349/24-25 |
| 412 | CM348/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 348/24-25 |
| 411 | CM369/24-25 | Compressive strength of Hardened Concrete:Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 369/24-25 |
| 410 | CM368/24-25 | Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.032.2025 | CM 368/24-25 |
| 409 | CM 367/24-25 | Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 367/24-25 |
| 408 | CM 366/24-25 | Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
29.03.2025 | CM 366/24-25 |
| 407 | CM 434/24-25 | Test on Paving Blocks:Testing of samples from outlet Azeez Salam Resitement, Kottekkad. |
Manager(Engineering), HPCL, Kozhikode |
29.03.2025 | |
| 406 | CM 448/24-25 | Test on Fencing Materials : Assessing the quality of materials in the materials to be used in Solar Hanging Fencing Anchuruli Gate to Mannakkudi top area,Thekkady Range. |
Range Forest Officer, Thekkady Range |
28.03.2025 | CM 448/24-25 |
| 405 | CM450/24-25 | Compressive strength of Hardened Concrete: Side protection works to the left bank of Manali river on the down stream of new bridge at Myladumpara in Pananchery Grama Panchayath.- Irrigation Section, Ollukkara |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
28.03.2025 | CM 450/24-25 |
| 404 | CM457/24-25 | Test on Fencing Materials : Report of the Tests on Corner Post, 12 Gauge HT Wire and G.I. Wire rope Supplied by Range Forest Officer, Research Range, Kodanad. |
Range Forset Officer, Research Range, Kodanad. |
28.03.2025 | CM457/24-25 |
| 403 | CM447/24-25 | Compressive strength of Hardened Concrete: Reconstruction of Pulikkalachira Bridge in Padiyoor Grama Panchayath in Irinjalakuda LAC in Thrissur Dt. – Pile (A2P2) |
Assistant Engineer, PWD Bridges Section, Chalakudy |
26.03.2025 | CM 447/24-25 |
| 402 | CM459/24-25 | Test on Fencing Materials : Report of the Tests on Corner Post, Supporting Post, T-angle, 12 Gauge Wire and 14 Gauge Wire Supplied by Range Forest Officer, Wadakkanchery Range, Thrissur Dt. |
Range Forset Officer, Wadakkanchery Range, Thrissur Dt. |
26.03.2025 | CM 459/24-25 |
| 401 | CM458/24-25 | Test on Fencing Materials : Report of the Tests on Corner Post, Supporting Post, T-angle, 12 Gauge Wire and 14 Gauge Wire Supplied by Range Forest Officer, Wadakkanchery Range, Thrissur Dt. |
Range Forset Officer, Wadakkanchery Range, Thrissur Dt. |
26.03.2025 | |
| 400 | CM443/24-25 | Compressive strength of Hardened Concrete: Renovation of Chirayanchal kulam in Annamanada Panchayath – Phase II – M.I. Section, Mala. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
24.03.2025 | |
| 399 | CN442/24-25 | Compressive strength of Hardened Concrete: RMF-Protecting the right bank of Periyar river in the north west portion at VP Thuruth in Kodungallur Muncipality. – Irrigation Section Kodungallur. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
24.03.2025 | |
| 398 | CM441/24-25 | Compressive strength of Hardened Concrete: Rejuvenation of Kachithodu dam in Madakkathara Grama Panchayath. –Minor Irrigation Section, Thrissur |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
24.03.2025 | |
| 397 | CM440/24-25 | Compressive strength of Hardened Concrete: General-Construction of Boat Jetty at Eanamavu in Thrissur District. – Irrigation Section Kunnamkulam. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
24.03.2025 | |
| 396 | CM444/24-25 | Compressive strength of Hardened Concrete:146/24-25 Cheerakkundu Olakayam Kuttu Kadachal,Puthur GP ,Ollukkara BP. |
Assistant Engineer, LSGD Subdivision, Ollukara Block Panchayath |
24.03.2025 | |
| 395 | CM411/24-25 | Compressive strength of Hardened Concrete:Construction of building for Microwin Steri Solutions Pvt Lted. |
Mr. A.R. Sunilkumar, Microwin Steri Solutions Pvt. Ltd, Kinfra Mega Food Park, Kanjikode, Kozhipara P.O, Palakkad |
22.03.2025 | |
| 394 | CM423/24-25 | Compressive strength of Hardened Concrete:Salt water Extrusion sluice at branch thodu Blangachal thodu-Construction of salt water extrusion sluice at branch of Blangachal thodu in ward No.21 Eriyad Panchayath.-MI Section Kodungallur |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
22.03.2025 | |
| 393 | CM421/24-25 | Compressive strength of Hardened Concrete:148/24-25 Murukkumkundu water tank concrete road,Nadathar GP ,Ollukara BP |
Assistant Executive Engineer, LSGD Subdivision, Ollukkara Block Panchayath |
21.03.2025 | |
| 392 | CM420/24-25 | Compressive strength of Hardened Concrete:Pro.No.278/24-25 Mannam Nagar Street1 Concreting Ward 7 |
Assistant Engineer, LSGD Section, Nadathara G P, Thrissur. |
21.03.2025 | |
| 391 | CM419/24-25 | Compressive strength of Hardened Concrete:Pro.No.153/24-25 Punchiripadam Royal Avenue Bylane Road Concreting. |
Assistant Engineer, LSGD Section, Nadathara G P, Thrissur. |
21.03.2025 | |
| 390 | CM413/24-25 | Compressive strength of Paving Blocks:General- Road work-Renovation works to the Karuvannur south bund road connecting between Karuvannur valiyapalam and Karalam Panchayath |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
21.03.2025 | CM 413/24-25 |
| 389 | CM418/24-25 | Test on Fencing Materials :Report of the Tests on 50×50 mm Square pipe ,75×75 mm Square pipe ,25×25 mm Cross Angle, GI fence wire 14 SWG ,Fence wire SWG 12 ACSR Supplied by Range Forest Officer,Vallakkadavu range,Idukki. |
Range Forset Officer,Vallakadavu Range |
21.03.2025 | CM 418/24-25 |
| 388 | CM438/24-25 | Test on Fencing Materials :Report of the Tests on Corner Post,12 Guage HT Wire , 14 Guage Binding Wire & GI Wire Rope Supplied by Range Forest Officer ,Machad Forest Range ,Thrissur. |
Deputy Range Forset Officer,Erumugham Forest Station ,Kodanadu Range. |
20-03-2025 | CM 4.38/24-25 |
| 388 | CM433/24-25 | Test on Fencing Materials :Report of the Tests on 2 inch GI Corner Post,1 inch GI Supporting Post,T-angle,12 Guage Wire and 14 Guage Binding Wire Supplied by Range Forest Officer ,Machad Forest Range ,Thrissur. |
Range Forset Officer,Machad Forest Range,Enakkad P O -680 589 |
20-03-2025 | CM 433/24-25 |
| 387 | CM424/24-25 | Compressive strength of Hardened Concrete:Construction of check dam cum bridge at Karichalkadavu in Kattakambal Gramapanchayath. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
20.03.2025 | CM 424/24-25 |
| 386 | CM422/24-25 | Compressive strength of Hardened Concrete:Renovation of Chattukulam in Kunnamkulam Munciplaity,Thrissur District |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
20.03.2025 | CM 422/24-25 |
| 385 | CM432/24-25 | Compressive strength of Hardened Concrete: Chimoni Dam-DSO works 2024-25- Rectification works to the toe drain of earthen dam- Balance work.- CDP Section No.1, Echippara. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
20.03.2025 | CM 432/24-25 |
| 384 | CM431/24-25 | Compressive strength of Hardened Concrete: MI/TSR/MI Priority- leading chal of Ayyanthole LIS-Extension work for side protection of leading chal of Ayyanthole LIS.- M.I. Section, Thrissur |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
20.03.2025 | CM 431/24-25 |
| 383 | CM430/24-25 | Compressive strength of Hardened Concrete: Salt water Extrusion sluice at branch thodu Blangachal thodu-Construction of salt water extrusion sluice at branch of Blangachal thodu in ward No.21 of Eriyad Panchayath.- M.I.Section, Kodungallur |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
20.03.2025 | CM 430/24-25 |
| 382 | CM429/24-25 | Compressive strength of Hardened Concrete: GENERAL-Thottumugham LIS-Phase 3- Pipe line extension.- M.I.Section, Kodakara |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
20.03.2025 | CM 429/24-25 |
| 381 | CM428/24-25 | Compressive strength of Hardened Concrete: GENERAL-Budget 2021-22-Improvements to Kidayichira in Velur Gramapanchayath. M.I.Section, Wadakkanchery |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
20.03.2025 | CM 428/24-25 |
| 380 | CM427/24-25 | Compressive strength of Hardened Concrete: GENERAL-Budget 2021-22-Improvements to Kidayichira in Velur Gramapanchayath. M.I.Section, Wadakkanchery |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
20.03.2025 | CM 427/24-25 |
| 379 | CM426/24-25 | Compressive strength of Hardened Concrete: GENERAL-Budget 2021-22-Improvements to Kidayichira in Velur Gramapanchayath. M.I.Section, Wadakkanchery |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
20.03.2025 | CM 426/24-25 |
| 378 | CM 417/24-25 | Compressive strength of Paving Blocks:Testing of samples from Annual Plan-Pananchery GP-Proj-152/2024-25 Sekhar Road Maintenance in Ward 22-General Civil work and Proj-151/2024-25 |
Assistant Engineer,LID & EW pananchery GP ,Pattikkad |
17.03.2025 | CM 417/24-25 |
| 377 | CM 390/24-25 | Compressive strength of Hardened Concrete:Construction of Elroi Building-First floor and Ramp. |
Smt.Tessa Kevin, Managing Director, Elroi Builders & Developers, Chalakkudy
|
15.03.2025 | CM 390_24-25. |
| 376 | CM 231/24-25 | Test on Steel:Reconstruction of Pattisserry Dam & canal system under Chengalar Scheme &Appurtenant works. |
M/s Paulose George Construction Co.Pvt.Ltd. Aishwarya Towers,Puthencruz Road, Karimugal,Kochi . |
08.05.2025 | CM 231/24-25 |
| 375 | CM 414/24-25 | Test on Fencing Materials :Report of the Tests on 2 inch GI Corner Post,1 inch GI Supporting Post,T-angle,12 Guage Wire and 14 Guage Binding Wire Supplied by Range Forest Officer ,Machad Forest Range ,Thrissur. |
Range Forset Officer,Machad Forest Range,Enakkad P O -680 589 |
12-03-2025 | CM 414/24-25 |
| 374 | CM 406/24-25 | Test on Steel:Extension of Moolathara Right Bank Canal from Korayar to Varattayar (Civil Works) in Eruthenpathy Panchayath,Palakkad District. |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
11.03.2025 | CM 406/24-25 |
| 373 | CM 405/24-25 | Compressive strength of Hardened:Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District- Foundation (P109) |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
11.03.2025 | CM 405/24-25 |
| 372 | CM 404/24-25 | Compressive strength of Hardened:Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District- Pier Lift ( P91& P96 ) |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
11.03.2025 | CM 404/24-25 |
| 371 | CM 403/24-25 | Compressive strength of Hardened:Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District- Pier Cap ( P82 &P83 ) |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
11.03.2025 | CM 403/24-25 |
| 370 | CM 412/24-25 | Test on Steel:For Pro No 239/25 Nellani Souhruda Road Ward 6. |
81.Tilak Nagar, Aurangabad, Maharashtra |
11.03.2025 | CM 412/24-25 |
| 369 | CM 410/24-25 | Test on Steel:Scheme for Special Assistance to State for Capital Investment 2023-2024:Construction of LSQ 8 Nos .for Thrissur East ,Thrissur City. |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd,Thrissur. |
10.03.2025 | CM 410/24-25 |
| 368 | CM 361/24-25 | Mix Design – General Education Department -Annual plan 2023-24-Construction of school building for Govt fisheries L P School Vekkode,Kodungallur. |
Babu Antony,Pallippat House ,Vallakkunnu P O ,Kallettumkara. |
10.03.2025 | CM 361/24-25 |
| 367 | CM 360/24-25 | Mix Design – Construction of School Building of Govt .UP school Vellikulangara,Thrissur. |
Babu Antony,Pallippat House ,Vallakkunnu P O ,Kallettumkara. |
10.03.2025 | CM 360/24-25 |
| 366 | CM 402/24-25 | Compressive strength of Hardened Concrete:Pro.no:124/24-25 Avoid Waterlogging in Nambidikundu |
Assistant Engineer, LSGD Section,Nadathara GP,Thrissur |
06.03.2025 | |
| 365 | CM 401/24-25 | Compressive strength of Hardened Concrete: Pro.no:141/24-25 Green line road concreting ward 10 |
Assistant Engineer, LSGD Section,Nadathara GP,Thrissur |
06.03.2025 |
|
| 364 | CM 382/24-25 | Compressive strength of Hardened Concrete:GENERAL-PSM Improvements to Ollukkara Branch canal between Ch.3/700 km and 3/900 km for the year 2023-24 |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
28-02-2025 | CM 382/24-25 |
| 363 | CM 385/24-25 | Test on Steel:Deposit Work of Malappuram Regulator at Nambranikadavu across Kadalundi River in Malappuram Muncipality |
Assistant Engineer,Quality Control Section |
25-02-2025 | CM 385/24-25 |
| 362 | CM 391/24-25 | Compressive strength of Hardened Concrete:Construction of Pandarachira Check Dam across Manali river at Mulayam in Nadathara Grama Panchayath- Irrigation Section Ollukkara |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
25-02-2025 | CM 391/24-25 |
| 361 | CM 389/24-25 | Compressive strength of Hardened Concrete:PSM 2024-25 -Improvement work Kozhukully branch canal between CH.3/600 km to 3/700 km and CH.4/200 km to 4/300 km |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
25-02-2025 | CM 389/24-2 |
| 360 | CM 386/24-25 | Test on Fencing Materials :Report of the Tests on Post ,Stainless Wire Rope,GI wire Rope,Bullets (Connectors) ,Bottom Fixture GP Square Tube Supplied by Range Forest Officer ,Kalady Range, Neeleshwaram. |
Range Forest Officer,Neeleshwaram P O , Kaladi |
24-02-2025 | CM 386/24-25 |
| 359 | CM 379/24-25 | Test on Coarse Aggregates : GENERAL -Road work -Renovation works to the Karuvannur South bund Road Connecting between Karuvannur Valiya Palam & Karalam Panchayath. |
Assistant Engineer,Quality Control Section ,Thrissur. |
21.02.2025 | CM 379/2024-25 |
| 358 | CM 377/24-25 |
Tests on ACSR WOLF Conductor:Conducting Mechanical Testing of ACSR WOLF Conductor |
Deputy Cheif Engineer,KSEB LTD, Vydhyuthibhavanam,Kottappuram,Thrissur. |
21.02.2025 | CM 377/24-25 |
| 357 | CM 363A/24-25 |
Test on Steel:Annual plan 2023-24-Construction of School Buliding forGovt.UP school-17 |
Babu Antony,Pallippat house Vallakkunnu.PO ,Kallettumkara. | 22.02.2025 | CM 363A/24-25 |
| 356 | CM 359A/2024-2 |
Test on Solid Block: Govt.Fisheries LPschool, Vekkode, Kodungallur, Thrissur. |
Assistant Engineer,PWD Building Section,Kodungallur. |
20.02.2025 | |
| 355 | CM 376/24-25 |
Test on Steel:NABARD-Micro Irrigation-Kozha phase II – Providing irrigation water from Kuruvilangadu Distributory to District Agriculture farm and state seed farm at Kozha in Kottayam District- Phase II |
Assistant Engineer, Quality Control Section No.2, Koothattukulam |
18.02.2025 | |
| 354 | CM 286/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 353 | CM 285/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 352 | CM 284/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 351 | CM 283/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 350 | CM 330/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 349 | CM 329/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 348 | CM 328/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 347 | CM 327/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 346 | CM 302/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 345 | CM 301/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 344 | CM 300/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
18.02.2025 | |
| 343 | CM 384/24-25 |
Compressive strength of Hardened Concrete:GENERAL-Thottumugham LIS- Phase 3 Pipeline extension-Minor Irrigation Section.Kodakara |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
15.02.2025 | |
| 342 | CM 381/24-25 |
Compressive strength of Hardened Concrete:Harithakeralam- Construction of salt water extrusion sluice in Chemmappilly Thodu of ward no. 8 at Nattika GP-Minor Irrigation Section, Kodungallur |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
15.02.2025 | |
| 341 | CM 380/24-25 |
Compressive strength of Hardened Concrete:Urgent reconstruction of the collapsed down stream right side river training wall and retaining wall of Cheerakuzhi weir-Head Works Section Cheerakuzhy |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
15.02.2025 | |
| 340 | CM 378/24-25 |
Compressive strength of Hardened Concrete:Harithakeralam- Construction of salt water extrusion sluice in Chemmappilly Thodu of ward no. 8 at Nattika GP-Minor Irrigation Section, Kodungallur |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
15.02.2025 | |
| 339 | CM365/24-25 |
Test on Paving Blocks:DRIP-Phase II Rehabilitation & Improvement of Basic facilities of Kanhirapuzha Dam-Providing Additional facilities to existing control room ,Turfing on D/S of dam, construction of horizontal and vertical chute drain ,Providing stilling pool ,Surveying periphery of water spread area ,Investigation works for bridge and watch tower -Appendix iii-Construction of approach road to gallery -500 m Testing of Cement concrete paver blocks |
Assistant Engineer KPIP Section 4/3,Kanhirapuzha |
14.02.2025 | |
| 338 | CM374/24-25 |
Test on Fencing Materials :Assessing the quality of materials in the work for Construction of Hanging Solar power fencing in Vazhachal Division in Thrissur (60 km) |
Project Engineer,Kerala Police Housing and Construction Corporation Ltd. Thrissur |
14.02.2025 | CM 374/24-25 |
| 337 | CM373/24-25 |
Test on Fencing Materials :Assessing the quality of materials in the work for Solar Hanging Fencing 8 km at Poochakuthu –Cheramala and Kalappara to Veliyalchal in Kothamanagalam Range Ernakulam Dist. |
Project Engineer,Kerala Police Housing and Construction Corporation Ltd. Central Police Quarters , Ernakulam |
14.02.2025 | CM 373/24-25 |
| 336 | CM372/24-25 |
Test on Fencing Materials :Assessing the quality of materials in the work for Solar Hanging Fencing 30km at Paniyeli to Ayaichal around Kottapara & River side upto old Bhoothakettu in Malayatoor Division-Ernakulam Dist. |
Project Engineer,Kerala Police Housing and Construction Corporation Ltd. Central Police Quarters , Ernakulam |
14.02.2025 | CM 372/24-25 |
| 335 | CM361/24-25 |
Mix Design Interim Report:Interim Report of the Concrete Mix Design -M25 (Dalmia Composite Cement ) Carried out for the Assistant Engineer,PWD Buildings Section,Kodungallur. |
Assistant Engineer,PWD Building Section,Kodungallur |
13.02.2025 | CM 361/24-25 |
| 334 | CM360/24-25 |
Mix Design Interim Report:Interim Report of the Concrete Mix Design -M25 (Dalmia Composite Cement ) Carried out for the Assistant Engineer,PWD Buildings Section,Chalakkudy. |
Assistant Engineer,PWD Building Section,Chalakkudy. |
13.02.2025 | CM 360/24-25 |
| 333 | CM359/24-25 |
Test on Solid Concrete Blocks:Annual plan 2023-24-Construction of School Buliding of Govt.UP School Vellikulangara , Thrissur |
Assistant Engineer,PWD Building Section,Chalakudy |
10.02.2025 | CM 359/24-25 |
| 332 | CM363/24-25 |
Test on Steel:General Education Department-Annual plan 2023-24-Construction of School building for Govt.Fisheries LP School,Vekkode,Kodungallur,Thrissur |
Assistant Engineer,PWD Building Section,Kodungallur |
10.02.2025 | CM 363/24-25 |
| 331 | CM297/24-25 |
Test on Cement:Construction of Pandarachira checkdam across Manali river at Mulayam in Nadathara Gramapanchayath.Thrissur |
Assistant Engineer, Irrigation Section, Ollukkara,Thrissur |
10.02.2025 | CM 297/24-25 |
| 330 | CM 364/24-25 |
Test on Laterite Stone Blocks: DRIP-Phase-II Rehabilitation & Improvement of basic facilities Kanhirapuzha Dam- Providing additional facilities to existing control room. Turfing on D/s of dam, Construction of horizontal and vertical chute drain, Providing Stilling pool- surveying periphery of water spread area, Investigation works for bridge and watch tower |
Assistant Engineer, Irrigation Quality Control Section, Chunnamthara,Palakkad. |
06.02.2025 | CM 364/24-25 |
| 329 | CM 342/24-25 |
Test on Fencing Materials :Assessing of the quality of the materials to be used in Solar Fencing in Kaprikkad Section. |
Range Forest Officer,Research Range Office,Kodanadu. |
06.02.2025 | CM342/24-25 |
| 328 | CM 358/24-25 |
Compressive strength of Hardened Concrete:MI Class works 2019-20 Revamping of Puthur Kayal pond -Construction of leading channel from Thuliyankunnuchira VCB and improvements to Thuliyankunnu chira. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
06-02-2025 | CM 358/24-25 |
| 327 | CM 357/24-25 |
Compressive strength of Hardened Concrete:MI Class works 2019-20 Revamping of Puthur Kayal pond -Construction of leading channel from Thuliyankunnuchira VCB and improvements to Thuliyankunnu chira |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
06-02-2025 | CM 357/24-25 |
| 326 | CM 362/24-25 |
Test on Fencing Materials :Assessing the quality of materials in the work for Construction of Physical Barrier for Mitigating Man Animal Conflict under HRC Solar hanging Fencing at :1.Kurathikudy to Kattukudy in Adimali Range Idukki. 2.Parisakkallu to Pazhampallichal in Neryamangalam Range Idukki. 3.Around Kozhiyalakudy in Anakkulam Range Idukki |
Project Engineer Kerala Police Housing and Construction Corporation Ltd Kottayam |
05-02-2025 | CM 362/24-25 |
| 325 | CM 371/24-25 |
Compressive strength of Hardened Concrete:Construction of Puthur Parallel Bridge in Puthur-Mannamangalam road in Ollur Constituency-Pile Pier P1 |
Assistant Engineer, PWD Bridges Section, Thrissur. |
05-02-2025 | CM 371/24-25 |
| 324 | CM 370/24-25 |
Compressive strength of Hardened Concrete:Construction of Puthur Parallel Bridge in Puthur-Mannamangalam road in Ollur Constituency-Abutment A1A |
Assistant Engineer, PWD Bridges Section, Thrissur. |
05-02-2025 | CM 370/24-25 |
| 323 | CM 356/24-25 |
Test on Steel:Extension of Moolathara Right Bank Canal From Korayar to Varattayar, Phase -1 in Eruthenpathy Panchayath ,Palakkad District. |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
03-02-2025 | CM 356/24-25 |
| 322 | CM 353/24-25 |
Compressive strength of Hardened Concrete:Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase -1 in Eruthenpathy Panchayath,Palakkad District (Pier Final Lift P 108) |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
03-02-2025 | CM 353/24-25_ |
| 321 | CM 354/24-25 |
Compressive strength of Hardened Concrete:Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase -1 in Eruthenpathy Panchayath,Palakkad District (Pier Cap P35 & P36) |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
03-02-2025 | CM 354/24-25 |
| 320 | CM 355/24-25 |
Compressive strength of Hardened Concrete:Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase -1 in Eruthenpathy Panchayath,Palakkad District (Wall Ch.0+523 to 0+553) |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
03-02-2025 | CM 355/24-25 |
| 319 | CM 346/24-25 |
Test on Fencing Materials :Assessing the quality of materials in the work of installation of New Solar Power Fencing (0.10 Km ) in Valiyamavu VSS area under Kulamavu Section of Thodupuzha Range during 2023-24 |
Range Forest Officer, Thodupuzha Forest Range. |
03.02.2025 | cm 346/24-25 |
| 318 | CM 345/24-25 |
Test on Fencing Materials :Assessing the quality of materials in the work of installation of New Solar fencing 2.0 km around Edavetty Nagravanam Project at Edavetty reserve in Thodupuzha Range during 2023-24 . |
Range Forest Officer, Thodupuzha Forest Range. |
01.02.2025 | cm 345/24-25 |
| 316 | CM 347/24-25 |
Compressive strength of Hardened Concrete:Construction of Pandarachira checkdam across Manali river at Mulayam in Nadathara Gramapanchayath Thrissur District-Irrigation Section Ollukkara |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
31.01.2025 | CM 347/24-25 |
| 315 | CM 344/24-25 |
Compressive strength of Hardened Concrete:General-Renovation of Chattukulam in Kunnamkulam Municipality, Thrissur Dist.-MI section Kunnamkulam |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
31.01.2025 | CM 344/24-25 |
| 314 | CM 343/24-25 |
Compressive strength of Hardened Concrete:First floor Roof Concreting of the building- Elroi at Chalakkudy |
Tessa Kevin,Managing Director,Elroi Builders & Developers, Chalakkudy |
31.01.2025 | CM 343/24-25 |
| 313 | CM 324/24-25 |
Test on Steel:CSIND–Construction of Lock cum Bridge in CH :316.728 Km of West coast Canal at Veliancode in Ponnani Taluk,Malapuram dist. |
Assistant Engineer,Irrigation section -2 Ponnani |
28.01.2025 | CM 324/24-25 |
| 312 | CM 313/24-25 |
Test on Rock Core Samples: Soil Investigation works of Manivayal distributary located at Chainage 1/540 m of Kolliyil Branch Canal of Karapuzha Irrigation Project |
Deputy Director, Instrumentation Division, KERI, Peechi, Thrissur |
24.01.2025 | CM 313/24-25 |
| 311 | CM 312/24-25 |
Test on Rock Core Samples:Soil Investigation works of Cheekkallur distributorary located at Chainage 8/500 of Kariambady Branch Canal of Karapuzha irrigation project |
Deputy Director, Instrumentation Division, KERI, Peechi, Thrissur |
24.01.2025 | CM 312/24-25 |
| 310 | CM 311/24-25 |
Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 311/24-25 |
| 309 | CM 335/24-25 |
Compressive strength of Hardened Concrete:Annual Maintenance-of various LIS under MI Section Mala for the year 2024-25 Thygram 1,Thygram2 , Thiruthikulangara and Vanchipurathazham. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
21.01.2025 | CM 335/24-25 |
| 308 | CM 310/24-25 |
Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 310/24-25 |
| 307 | CM 309/24-25 |
Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 309/24-25 |
| 306 | CM 308/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 308/24-25 |
| 305 | CM 307/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 307/24-25 |
| 304 | CM 306/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 306/24-25 |
| 303 | CM 294/24-25 |
Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 294/24-25 |
| 302 | CM 293/24-25 |
Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 293/24-25 |
| 301 | CM 292/24-25 |
Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 292/24-25 |
| 300 | CM 291/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 291/24-25 |
| 299 | CM 290/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 290/24-25 |
| 298 | CM 289/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 289/24-25 |
| 297 | CM 288/24-25 |
Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
21.01.2025 | CM 288/24-25 |
| 296 | CM 332/24-25 |
Tests on ACSR WOLF Conductor:Conducting Mechanical Testing of ACSR WOLF Conductor |
Assistant Engineer,KSEB Ltd.,TC Section ,Gandhi Road,Kozhikode |
18.01.2025 | CM 332/24-25 |
| 295 | CM 334/24-25 |
Compressive strength of Hardened Concrete:40/24-25 Murukkumkundu Watertank Road Concrete,Nadathara GP,Ollukkara BP |
Assistant Engineer, LSGD Sub Division,Ollukkara Block Panchayath ,Ollukkara,Thrissur. |
18.01.2025 | CM 334/24-25 |
| 294 | CM 333/24-25 |
Compressive strength of Hardened Concrete:SC corpus Fund 23-24 Concrete road and renovation of Samskarikanilayam,Nadathara GP, Ollukkara BP. |
Assistant Engineer, LSGD Sub Division,Ollukkara Block Panchayath ,Ollukkara,Thrissur |
18.01.2025 | CM 333/24-25 |
| 293 | CM 320/24-25 |
Test on Laterite Stone Blocks: DRIP-Phase-II Rehabilitation & Improvement of basic facilities Kanhirapuzha Dam- Providing additional facilities to existing control room. Turfing on D/s of dam, Construction of horizontal and vertical chute drain, Providing Stilling pool- surveying periphery of water spread area, Investigation works for bridge and watchtower |
Assistant Engineer,KPIP Section 4/3, Kanhirapuzha |
17.01.2025 | CM 320/24-25 |
| 292 | CM 281/24-25 | Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
17.01.2025 | CM 281/24-25 |
| 291 | CM 280/24-25 | Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
17.01.2025 | CM 280/24-25 |
| 290 | CM 279/24-25 | Compressive strength of Hardened Concrete: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
17.01.2025 | CM 279/24-25 |
| 289 | CM 274/24-25 | Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
17.01.2025 | CM 274//24-25 |
| 288 | CM 273/24-25 | Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
17.01.2025 | CM 273/24-25 |
| 287 | CM 271/24-25 | Compressive strength of Hardened Concrete:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
17.01.2025 | CM 271/24-25 |
| 286 | CM 269/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.01.2025 | CM 269/24-25 |
| 285 | CM 268/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.01.2025 | CM 268/24-25 |
| 284 | CM 267/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.01.2025 | CM 267/24-25 |
| 283 | CM 266/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.01.2025 | CM 266/24-25 |
| 282 | CM 252/24-25 | Test on Rock Core Samples:Soil Investigation of Cheekkallur Distributary located at Chainage 8/500 of Kariambady Branch canal of Karapuzha Irrigation Project. |
Deputy Director, Instrumentation Division, KERI, Peechi, Thrissur |
16.01.2025 | CM 252/24-25 |
| 281 | CM 162/24-25 | Concrete Mix Design:GENERAL- Construction Boat Jetty at Enamavu in Thrissur District – General Civil work. |
Assistant Engineer, Irrigation Section Kunnamkulam |
16.01.2025 | CM 162/24-25 |
| 280 | CM 331/24-25 | Compressive strength of Hardened Concrete:General PSM- Urgent Rectification and leak Proofing works to LBMC ch 6/000km and 6/500km-Head works Section,Peechi |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
15.01.2025 | CM 331/24-25 |
| 279 | CM 325/24-25 | Compressive strength of Hardened Concrete:General- PSM-Rectification works of Amballur branchcanal between Ch.7/350 & Ch.7/700 for the year 2024-25-Irrigation section Manjamkuzhi |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
15.01.2025 | CM 325/24-25 |
| 278 | CM 326/24-25 | Compressive strength of Hardened Concrete:General- Thrissur District – Total development plan for Wadakanchery river phase-1- General Civil Work. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
14.01.2025 | CM 326/24-25 |
| 276 | CM 322/24-25 | Test on Fencing Materials :Assessing the quality of materials in the work of Solar hanging fencing 3.20 km at Karimanal River to Hanging Bridge in Neriamangalam Range & 0.4 km at Needdapara Road side in Neryamangalam Range Ernakulam Dist. |
Project Engineer,Kerala Police Housing and Construction Corporation ,Central Police Quarters,Near High Court Ernakulam. |
13.01.2025 | CM 322/24-25 |
| 275 | CM 323/24-25 | Compressive strength of Hardened Concrete: Construction of Vishraam Utsav,Thiruvambady |
M/s Olivia projects, Gayathri Apartment, Punkunnam |
13.01.2025 | CM 323/24-25 |
| 274 | CM 321/24-25 | Compressive strength of Hardened Concrete:General- Renovation of Chattukulam in Kunnamkulam Muncipality, Thrissur Dist. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
13.01.2025 | CM 321/24-25 |
| 273 | CM 314/24-25 | Compressive strength of Hardened Concrete:General- Protection work to the eroded right bank of Chalakkudy river near Kudumby Colony in Annamanada Panchayath. C-5/2022 |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
13.01.2025 | CM 314/24-25 |
| 272 | CM 305/24-25 | Test on Fencing Materials: Assessment of the quality of the materials to be used in Solar Hanging Fencing-Kurisumala EDC area . |
Range Forest Officer, Thekkady |
09.01.2025 | CM 305/24-25 |
| 271 | CM 304/24-25 | Test on Fencing Materials: Assessment of the quality of the materials to be used in Solar Hanging Fencing Kurisumala to Thondiyar |
Range Forest Officer, Thekkady |
09.01.2025 | CM 304/24-25 |
| 270 | CM 299/24-25 | Test on Steel:Construction of Pandarachira checkdam across Manali river at Mulayam in Nadathara Gramapanchayath. Thrissur |
Assistant Engineer, Irrigation Section, Ollukkara,Thrissur. |
09.01.2025 | CM 299/24-25 |
| 269 | CM 298/24-25 | Tests on Fine Aggregates: Construction of Pandarachira checkdam across Manali river a Mulayam in Nadathara Gramapanchayath.Thrissur. |
Assistant Engineer, Irrigation Section, Ollukkara,Thrissur. |
09.01.2025 | CM 298/24-25 |
| 268 | CM 296/24-25 | Test on Steel:Extension of Moolathara Right Bank Canal From Korayar to Varattayar, Phase -1 in Eruthenpathy Panchayath, Palakkad District. |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
09.01.2025 | CM 296/24-25 |
| 267 | CM 316/24-25 | Test on Fencing Materials :Assessing the quality of materials in the work for Construction of Physical Barrier for Mitigating Man Animal Conflict under HRC Solar Hanging Fencing at Azhuthakadavu area Kalaketty to 116 Erumeli Range, Kooppara Jundapady kettuchira area and Azhuthakkadavu munambu pezhumkandam-Murikkattukudy- Kurisumala Ayyappankovil Range.. |
Project Engineer,Kerala Police Housing and Construction Corporation Ltd., Kottayam |
09.01.2025 | CM 316/24-25 |
| 266 | CM 315/24-25 | Test on Fencing Materials :Assessing the quality of materials in the work for Construction of Physical Barrier for Mitigating Man Animal Conflict under HRC Solar Hanging Fencing at Around Plackthadam tribal settlement and Kallar Erumeli Range, Jundappady-Ambalakkadavu Ayyappankovil range |
Project Engineer,Kerala Police Housing and Construction Corporation Ltd., Kottayam |
09.01.2025 | CM 315/24-25 |
| 265 | CM 303/24-25 | Test on Fencing Materials : Assessing the quality of materials in the work – RKVY- Hanging Solar Fencing from Moolakkayam to Vallakkadav, Vallakkdav Range. |
Range Forest Officer, Vallakkadav Range |
08.01.2025 | CM 303/24-25 |
| 264 | CM 295/24-25 | Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District.(Pier Lift P36 & P39) |
Project Manager, PRATHMESH & KK (J.V), Aurangabad, Maharashtra |
06.01.2025 | CM 295/24-25 |
| 263 | CM 263/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 263/24-25 |
| 262 | CM 262/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 262/24-25 |
| 261 | CM 261/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 261/24-25 |
| 260 | CM 260/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 260/24-25 |
| 259 | CM 259/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 259/24-25 |
| 258 | CM 258/24-24 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 258/24-25 |
| 257 | CM 257/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 257/24-25 |
| 256 | CM 256/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 256/24-25 |
| 255 | CM 255/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 255/24-25 |
| 254 | CM 254/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 254/24-25 |
| 253 | CM 253/24-25 | Compressive strength of Hardened Concrete: Project: NaveraTaneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 253/24-25 |
| 252 | CM 249/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 249/24-25 |
| 251 | CM 248/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 248/24-25 |
| 250 | CM 247/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 247/24-25 |
| 249 | CM 245/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 245/24-25 |
| 248 | CM 244/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 244/24-25 |
| 247 | CM 243/24-25 | Compressive strength of Hardened Concrete: Project: NaveraTaneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 243/24-25 |
| 246 | CM 242/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 242/24-25 |
| 245 | CM 239/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
04.01.2025 | CM 239/24-25 |
| 244 | CM 287/24-25 | Test on Fencing Materials : Assessing the quality of materials in the work of solar fencing at Charpa range |
Range Forest Officer, Charpa Range. |
23.12.2024 | CM 287/24-25 |
| 243 | CM 282/24-25 | Compressive strength of Hardened Concrete: PSM 2024-25 –Improvement work Kozhukully branch canal Ch.5/100 and 5/200 KM |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
19.12.2024 | CM 282/24-25 |
| 242 | CM 276/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial building name Elroi at Chalakkudy |
Tessa Kevin,Managing Director, Elroi Builders & Developers, Chalakkudy |
19.12.2024 | CM 276/24-25 |
| 241 | CM 278/24-25 | Test on Fencing Materials : Assessing the quality of materials in the work for Construction of Physical Barrier for Mitigating Man Animal Conflict under Kottayam Division Solar Hanging Fencing from Manjalaruvi to Mambadi and Valanchal to Panniyarkutty in Erumely Range during 2024-25. |
Range Forest OfficerErumely Range.
|
18.12.2024 | CM 278/24-25 |
| 240 | CM 241/24-25 | Pile Integrity Test : Pambar Basin Scheme-Reconstruction of Pattissery Dam and canal system under Chengalar Scheme-Dam and Appurtenant works |
Executive Engineer, Pambar Project Division, Pala-Koothatukulam |
17.12.2024 | CM 241/24-25 |
| 239 | CM 275/24-25 | Tests on Fine Aggregates: Manappuram Commercial Building, Valapad |
M/s Olivia projects, Gayathri Apartment, Poonkunnam |
17.12.2024 | CM 275/24-25 |
| 238 | CM 277/24-25 | Compressive strength of Hardened Concrete: GENERAL- MIC/Mandaram Canal/2022-Renovation works to the canals of Mandaram LI Scheme |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
16.12.2024 | CM 277/24-25 |
| 237 | CM 270/24-25 | Report on Waterproofing Methodology: Project- Modernisation of school to International Standards |
NEO STRUCTO PVT LTD, VYTTILA, ERNAKULAM |
16.12.2024 | CM 270/24-25 |
| 236 | CM 272/24-25 | Compressive strength of Hardened Concrete: Construction of Pallur North Padashekkaram LIS in Deshamangalam Grama Panchayath. |
Assistant Engineer,Irrigation Quality Control Section,Thrissur. |
13.12.2024 | CM 272/24-25_ |
| 235 | CM 264/24-25 | Test on Fencing Materials : Poongode Forest Station to Kanjirakkode-Kodumbu in Erumappetty Panchayath. |
Range Forest Offcier, Wadakkanchery range. |
11.12.2024 | CM 264/24-25 |
| 234 | CM 265/24-25 | Test on Coarse Aggregates : Vishram – Utsav, Thriruvambady |
M/s Olivia projects, Gayathri Apartment, Punkunnam |
10.12.2024 | CM 265/24-25 |
| 233 | CM 246/24-25 | Test on Laterite Stone Blocks: DRIP-Phase-II Rehabilitation & Improvement of basic facilities Kanhirapuzha Dam- Providing additional facilities to existing control room. Turfing on D/s of dam, Construction of horizontal and vertical chute drain, Providing Stilling pool- surveying periphery of water spread area, Investigation works for bridge and watch tower |
Assistant Engineer, Quality Control Section, Irrigation Department, Chunnambuthara, Palakkad.
|
04.12.2024 | CM 246/24-25 |
| 232 | CM 251/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial Building for Manappuram Finance Limited, Valappad – Third Floor Roof Slab Phase 2 | M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur | 03.12.2024 | CM 251/24-25 |
| 231 | CM 250/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial Building for Manappuram Finance Limited, Valappad – Third Floor Roof Slab Phase 1 | M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur | 03.12.2024 | CM 250/24-25 |
| 230 | CM 238/24-25 | Test on Coarse & Fine Aggregates : | Kavalakkat Associates, Palakkad | 02.12.2024 | CM 238/24-25 |
| 229 | CM 240/24-25 | Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District.(Pier Cap P15 & P16) | Project Manager, PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra | 27.11.2024 | CM 240/24-25 |
| 228 | CM 212/24-25 | PET : Pambar Basin Scheme-Reconstruction of Pattissery Dam and canal system under Chengalar Scheme-Dam and Appurtenant works | Executive Engineer, Pambar Project Division, Pala-Koothatukulam | 27.11.2024 | CM 212/24-25 PET |
| 227 | CM 237/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 237/24-25 |
| 226 | CM 236/24-25 | Compressive strength of Hardened Concrete:Project: Navera Regalia | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 236/24-25 |
| 225 | CM 235/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 235/24-25 |
| 224 | CM 234/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 234/24-25 |
| 223 | CM 230/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 230/24-25 |
| 222 | CM 229/24-25 | Compressive strength of Hardened Concrete: Project: Navera Regalia | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 229/24-25 |
| 221 | CM 228/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 228/24-25 |
| 220 | CM 227/24-25 | Compressive strength of Hardened Concrete: Project: Navera Prithvi | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 227/24-25 |
| 218 | CM 224/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 224/24-25 |
| 217 | CM 223/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 223/24-25 |
| 216 | CM 222/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 222/24-25 |
| 215 | CM 221/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 221/24-25 |
| 214 | CM 220/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira | M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur | 27.11.2024 | CM 220/24-25 |
| 213 | CM 233/24-25 | Test on Fine Aggregates: Test on fine aggregates supplied by M/s Olivia Projects , Punkumman | Olivia Projects , Punkumman | 23.11.2024 | CM 233_24-25 |
| 212 |
CM 219/24-25 |
Test on Fencing materials: Assessing the quality of materials in the work of Solar Fencing at Neriamangalam Range |
Range Forest Officer, Neriamangalam Range
|
22.11.2024 | CM 219/24_25 |
| 211 |
CM 232/24-25 |
Compressive strength of Hardened Concrete:Construction of Vishraam Utsav, Thiruvambady-Column |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
20.11.2024 | CM 232/24-25 |
| 210 |
CM 151/24-25 |
Test on Rock Core Samples:General-Investigation Shorappara Investigation for the construction of Check dam across Walayarpuzha at Shorappara in Vadakarappathy Grama Panchayath in Palakkad District. |
Assistant Engineer, MI Section, Tattamangalam |
19.11.2024 | CM 151/24-25 |
| 209 |
CM 226/24-25 |
Compressive strength of Hardened Concrete:LAC-ADS -2021-22 Irinjalakuda LAC -Constuction ofbuilding for Anganawadi no.78 at Kattoor GP .Irinjalakuda BP. |
Assitant Engineer , LSGD Section, Kattoor Grama panchayath |
19.11.2024 | CM 226/24-25 |
| 208 |
CM 225/24-25 |
Compressive strength of Hardened Concrete: Building at Nellayi-Slab concrete RMC |
Mr. Ramesan, Attuvalappil(H), P.O. Nellayi, Thrissur. |
16.11.2024 | CM 225/24-25 |
| 207 |
CM 211/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
16.11.2024 | CM 211/24-25 |
| 206 |
CM 210/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
16.11.2024 | CM 210/24-25 |
| 205 |
CM 209/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
16.11.2024 | CM 209/24-25 |
| 204 |
CM 194/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
15.11.2024 | CM 194/24-25 |
| 203 |
CM 187/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Prithvi |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
15.11.2024 | CM 187/24-25 |
| 202 |
CM 208/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
15.11.2024 | CM 208/24-25 |
| 201 |
CM 207/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
15.11.2024 | CM 207/24-25 |
| 200 |
CM 206/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
15.11.2024 | CM 206/24-25 |
| 199 |
CM 205/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
15.11.2024 | CM 205/24-25 |
| 198 |
CM 180/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
15.11.2024 | CM 180/24-25 |
| 197 |
CM 179/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
15.11.2024 | CM 179/24-25 |
| 196 |
CM 178/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
15.11.2024 | CM 178/24-25 |
| 195 |
CM 213/24-25 |
Test on Fencing materials:Assessing the quality of materials in the Hanging Fence work at Kollengode Range in Nenmara Divsion |
Range Officer, Kollengode Range, Nenmara Divsion |
22.11.2024 | CM 213/24_25 |
| 194 |
CM 218/24-25 |
Test on Fencing materials:Assessing the quality of materials in the Solar Fencing work at Chullikkandam Check Post to Panamkuzhy in Mullaringad range. |
Deputy Range Forest Officer, Kurishumudy Forest Station, Research Range, Kodanadu, Malayattur. |
12.11.2024 | CM 218/24-25 |
| 193 |
CM 173/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
11.11.2024 | CM 173_24-25 |
| 192 |
CM 172/24-25
|
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
11.11.2024 | CM 172_24-25 |
| 191 | CM 171/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
11.11.2024 | CM 171/24-25 |
| 190 | CM 217/24-25 |
Compressive strength of Hardened Concrete: Construction of Commercial Building For Manappuram Finance Ltd.Valappad-Third floor roof slab phase 2 |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08.11.2024 | CM 217/24-25 |
| 189 | CM 216/24-25 |
Compressive strength of Hardened Concrete: Construction of Commercial Building For Manappuram Finance Ltd.Valappad-Second floor roof slab phase 2 |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08.11.2024 | CM 216/24-25 |
| 188 | CM 197/24-25 |
STEEL TEST: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District. |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
08.11.2024 | CM 197/24-25 |
| 187 | CM 215/24-25 |
Compressive strength of Hardened Concrete: For Southern Railway, Pile foundation with Pedestal at Amrit Bharat Stations for Extension of Portico at GUV Flag Post GUV |
Outlook Communications Pvt. Ltd., South Kalamassery, Ernakulam, |
07.11.2024 | CM 215/24-25 |
| 186 | CM 214/24-25 |
Compressive strength of Hardened Concrete:For Southern Railway, Pile foundation with Pedestal at Amrit Bharat Stations for Extension of Portico at GUV Entrance Arch GUV |
Outlook Communications Pvt. Ltd., South Kalamassery, Ernakulam, |
07.11.2024 | CM 214/24-25 |
| 185 | CM 204/24-25 |
Test on Fencing materials: Assessing the quality of materials in the work for Construction of Physical Barrier for Mitigating Man Animal Conflict under Kottayam Division Solar Hanging Fencing at Manjalaruvi-Pakkanam-504 |
Range Forest Officer, Erumely.
|
07.11.2024 | CM 204/24-25 |
| 184 | CM 203/24-25 |
Test on Fencing materials: Assessing the quality of materials in the Solar Fencing work at Chullikkandam Check Post to Panamkuzhy in Mullaringad range. |
Range Officer, Mullaringadu Range
|
07.11.2024 | CM 203/24-25 |
| 183 | CM 202/24-25 |
Test on Fencing materials: Assessing the quality of materials in the work of Solar Fencing at Neriamangalam Range. |
Range Forest Officer Neriamangalam range |
07.11.2024 | CM 202/24-25 |
| 182 | CM 201/24-25 |
Compressive strength of Hardened Concrete:Annual Maintenance-Urgent repair works of PVC pipes in various LI Schemes in Athirapilly, Kodassery, Pariyaram, Meloor Panchayath and Chalakudy Municipality 2023-24 |
Assistant Engineer, Minor Irrigation Section, Chalakkudy. |
05.11.2024 | CM 201/24-25 |
| 181 | CM 200/24-25 |
Compressive strength of Hardened Concrete:Annual Maintenance-Urgent repair works of PVC pipes in various LI Schemes in Athirapilly, Kodassery, Pariyaram, Meloor Panchayath and Chalakudy Municipality 2023-24 |
Assistant Engineer, Minor Irrigation Section, Chalakkudy. |
05.11.2024 | CM 200/24-25 |
| 180 | CM 199/24-25 |
Compressive strength of Hardened Concrete: Construction of Commercial Building Manappuram Finance Ltd Valappad- Third Floor Roof Slab |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
05.11.2024 | CM 199/24-25 |
| 179 | CM 198/24-25 | Test on Fencing materials: Tests on Physical barrier for Mitigating Man Animal Conflict under HRC Solar hanging fencing at Azhuthakkadavu Area Kalaketty to 116 and around Manjalaruvi Tribal settlement area Erumeli Range, Kottayam District. |
Project Engineer, Kerala Police Housing and Construction Ltd., Kottayam. |
04.11.2024 | CM 198/24-25 |
| 178 | CM 196/24-25 |
Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District.(Pier Final lift P18) |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
30.10.2024 | CM 196/24-25 |
| 177 | CM 195/24-25 |
Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District.(Pier Foundation) |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
30.10.2024 | CM 195/24-25 |
| 176 | CM 189/24-25 |
Test on Fencing materials: Assessing the quality of materials in the work for Construction of physical Barrier for Mitigating Man Animal Conflict under HRC Solar hanging Fencing at Jundapady Ambalakadavu in Ayyappankovil Range Idukki |
Project Engineer, Kerala Police Housing and Construction Ltd., Kottayam. |
30.10.2024 | CM 189/24_25 |
| 175 | CM 186/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
30.10.2024 | CM 186/24-25 |
| 174 | CM 185/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
30.10.2024 | CM 185/24-25 |
| 173 | CM 184/24-25 |
Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
30.10.2024 | CM 184/24-25 |
| 172 | CM 190/24-25 |
Compressive strength of Mud Blocks: Nil |
Sri. Manu T.S, Thaniyalil House, Nhangattiri P.O, Palakkad |
25.10.2024 | CM 190/24-25 |
| 171 | CM 191/24-25 |
Compressive strength of Hardened Concrete: AMRUT 800mm DI Pipe laying from Peechi to Thekkinkaadu- Casting of Anchorage Blocks |
Assistant Engineer,Project Wing,Office of Superintending Engineer,Thrissur Municipal Corporation |
25.10.2024 | |
| 170 | CM 193/24-25 |
Compressive strength of Hardened Concrete: Construction of Commercial Building Manappuram Finance Ltd Valappad- Third Floor Roof Slab Phase 1 |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
25.10.2024 | |
| 169 | CM 192/24-25 |
Compressive strength of Hardened Concrete: Construction of Commercial Building Manappuram Finance Ltd Valappad- Second Floor Roof Slab Phase 1 |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
25.10.2024 | |
| 168 | CM 188/24-25 |
Compressive strength of Hardened Concrete: Construction of Vishraam Utsav, Thiruvambady |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
23.10.2024 | |
| 167 | CM 176/24-25 |
Compressive strength of Paving Blocks:Testing of samples from outletChangaleeri Fuels, Mannarkkad, Changaleeri |
Manager (Engineering),HPCL, Kozhikode , |
22.10.2024 | |
| 166 | CM 175/24-25 |
Compressive strength of Paving Blocks:Testing of samples from outlet CHERUPARAS FUEL, VALILLAPUZHA |
Manager (Engineering),HPCL, Kozhikode , |
22.10.2024 | |
| 165 | CM 174/24-25 |
Compressive strength of Paving Blocks:Testing of samples from outlet NK Fuels, Edavannapara |
Manager (Engineering),HPCL, Kozhikode , |
22.10.2024 | |
| 164 | CM 177/24-25 |
Compressive strength of Hardened Concrete:KIIFB Project Construction of Regulator cum Bridge across Bharathapuzha at Kankakkadavu in Kuttipuram Panchyath, Malappuram District- wearing Coat(A2-P28) |
Project Engineer (CIVIL), RITES Ltd., RCB Kankakkadavu |
22.10.2024 | |
| 163 | CM 183/24-25 |
Test on Fencing materials: Tests on Corner post, Supporting post, T-angle Post,12 gauge wire, 14 gauge wire, Clamp, Earth device & Tension spring (Pooyyamkkutty to Pooyyamkkuttythandu in Pooyyamkkutty Forest Station ) |
The Range Forest officer, Kuttampuzha Range, Kothamangalam |
18.10.2024 | |
| 162 | CM 182/24-25 |
Test on Fencing materials: Tests on Corner post, Supporting post, T-angle Post,12 gauge wire, 14 gauge wire, Clamp, Earth device & Tension spring (Blavana to Pooyyamkkutty in Pooyyamkkutty Forest Station) |
The Range Forest officer, Kuttampuzha Range, Kothamangalam |
18.10.2024
|
|
| 161 | CM 165/24-25 |
Compressive strength of Hardened Concrete: M25 Project- Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
17.10.2024
|
|
| 160 | CM 164/24-25 |
Compressive strength of Hardened Concrete: M30 Project- Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
17.10.2024
|
|
| 159 | CM 163/24-25 |
Compressive strength of Hardened Concrete: M30 Project- Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
17.10.2024 | |
| 158 | CM 181/24-25 |
Steel test: 16 mm- Extension of Moolathara Right Bank Canal From Korayar to Varattayar, Phase -1 in Eruthenpathy Panchayath, Palakkad District |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
16.10.2024 | |
| 157 | CM 145/24-25 |
Steel test: 25 mm- Extension of Moolathara Right Bank Canal From Korayar to Varattayar, Phase -1 in Eruthenpathy Panchayath, Palakkad District |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
16.10.2024 | |
| 156 | CM 124/24-25 |
Mix Design – M25: Cut & Cover- Construction of cut and cover for pedestrian cross and parking near Kottayi Government School at Peringottukurussi canal between 16/700 to 16/900 km |
Assistant Engineer, Malampuzha Canal Section, Mathur, Palakkad |
16.10.2024 | |
| 155 | CM 168/24-25 |
Test In Steel: C onstruction of Commercial Building named Elroi at Chalakkudy |
Smt.Tessa Kevin, Managing Director, Elroi Builders & Developers, Chalakkudy
|
15.10.2024 | |
| 154 | CM 167/24-25 |
Compressive strength of Hardened Concrete:M20 Construction of Commercial Building named Elroi at Chalakkudy |
Smt.Tessa Kevin, Managing Director, Elroi Builders & Developers, Chalakkudy |
15.10.2024 | |
| 153 | CM 156/24-25 |
Pile Integrity Test: Construction of Regulator cum Bridge at Olavilam Pathikal in Chokli panchayath, Thalassery Constituency, Kannur |
Assistant Engineer, Minor Irrigation Section, Thalassery |
08.10.2024 | |
| 152 | CM 157/24-25 |
Test on Fencing materials: Tests on Post 50X50 mm,Bottom fixture GP Square Tube, 1.5 mm Rope ,1.5 mm SS Wire,1.2 mm SS Wire |
Kurisumudi Forest Station, Research Range Kodanadu, Malayatoor |
08.10.2024 | |
| 151 | CM 170/24-25 |
Compressive strength of Red Bricks: Construction of Commercial building, Valapad for Manappuram Finance Ltd-Roof Slab-2nd floor 2nd phase |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08.10.2024 | |
| 150 | CM 169/24-25 |
Compressive strength of Red Bricks: Construction of Commercial building, Valapad for Manappuram Finance Ltd.-Roof Slab-Ist floor 2nd phase |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08.10.2024 | |
| 149 | CM 161/24-25 |
Compressive strength of Hardened Concrete: M20 Project- Navera Prithvi |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
08.10.2024 | |
| 148 | CM 160/24-25 |
Compressive strength of Hardened Concrete: M30 Project- Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
08.10.2024 | |
| 147 | CM 159/24-25 |
Compressive strength of Hardened Concrete: M20 Project- Navera Prithvi |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
08.10.2024 | |
| 146 | CM 158/24-25 |
Compressive strength of Hardened Concrete: M25 Project- Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
08.10.2024 | |
| 147 | CM 166/24-25 |
Compressive strength of Paver Blocks:Keerthi road maintenance ward 22 |
Assistant Engineer, LID & EW Section, Pananchery Grama Panchayath, Pattikkad |
07.10.2024 | |
| 146 | CM 153/24-25 |
Test on Fencing materials: Assessing the quality of materials used for Solar fencing in Kannimangalam Forest section |
Range Forest Officer, Kalady Range, Neeleshwaram |
03.10.2024 | |
| 145 | CM 152/24-25 |
Test on Fencing materials: Assessing the quality of materials used for Solar fencing in Evergreen Forest Section |
Range Forest Officer, Kalady Range, Neeleshwaram |
03.10.2024 | |
| 144 | CM 148/24-25 |
Test on Cover Blocks : Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District.(Cover Block-7.5 & 5.5 cm) |
M/s Prathmesh & KK (J.V), 81, Tilak Nagar, Aurangabad, Maharashtra |
03.10.2024 | |
| 143 | CM 154/24-25 |
Test on Coarse aggregates : General-Sreekrishnamughgham Temple -ASE Urgent protection works to construct Rubble Mount wall for a length of 100m south of CP1235 and towards south in SN Puram Panchayath in Kodungallur Taluk. |
Assistant engineer, Irrigation section, Kodungallur
|
28.09.2024 | |
| 142 | CM 147/24-25 |
Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District.(Foundation Raft P32) |
M/s Prathmesh & KK (J.V), 81, Tilak Nagar, Aurangabad, Maharashtra |
28.09.2024 | |
| 141 | CM 146/24-25 |
Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District.(Pier Lift P64) |
M/s Prathmesh & KK (J.V), 81, Tilak Nagar, Aurangabad, Maharashtra |
28.09.2024 |
|
| 140 | CM 109/24-25 |
Mix design : M40- KIIFB-KIIDC Extension of Moolathara Right Bank Canal from Korayar to Varattayar(Civi works) in Eruthenpathy Panchayath, Palakkad District |
M/s Prathmesh & KK (J.V), 81, Tilak Nagar, Aurangabad, Maharashtra |
28.09.2024 | |
| 139 | CM 155/24-25 |
Compressive strength of Red Bricks: Construction of Commercial building, Valapad for Manappuram Finance Ltd (Structural work) |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
27.09.2024 | |
| 138 | CM 150/24-25 |
Compressive strength of Hardened Concrete: Construction of Commercial Building, Valapad for Manappuram finance Limited-First Floor Roof Slab 1nd phase. |
Manappuram Finance Limited,Valapad. |
25.09.2024 | |
| 137 | CM 149/24-25 |
Compressive strength of Hardened Concrete: Construction of Commercial Building, Valapad for Manappuram finance Limited-Second Floor Roof Slab 1nd phase. |
Manappuram Finance Limited,Valapad. |
25.09.2024 | |
| 136 | CM 143/24-25 |
Test on Steel Bars: Construction of Boat Jetty near Dana Kadav near Kakkathiruthy Bridge in Perinjanam Panchayath. |
Assistant Engineer, Irrigation Section, Irinjalakuda |
24.09.2024 | |
| 135 | CM 121/24-25 |
Test on Aggregates :Extension of Moolathara Right Bank Canal in from Korayar to Varattaya Phase I,in Eruthenpathy Panchayath, Palakkad-Source:Green Sand. |
Project Manager, PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
24.09.2024 | |
| 134 | CM 142/24-25 | Compressive strength of Hardened Concrete: Commercial cum Residential Building at Nellayi-Slab Concrete RMC(Batch II&III) |
Mr. Ramesan, Attuvalappil(H), P.O. Nellayi, Thrissur. |
23.09.2024 | |
| 133 | CM 137/24-25 | Compressive strength of Hardened Concrete: Commercial cum Residential Building at NellayiSlab Concrete RMC(Batch I) |
Mr. Ramesan, Attuvalappil(H), P.O. Nellayi, Thrissur. |
23.09.2024 | |
| 132 | CM 132/24-25 | NDT : KIIFB-KILA-3 CR Project-Infrastructure Development at GHSS Niramaruthur (School Code 19079) in Niramaruthur Panchayath under Tanur LAC in Malapuram District – Construction of New Building (G+2)-Composite work |
Assistant Engineer, Local Infrastructure Development and Engineering Wing (LID & EW), Niramaruthur Grama Panchayath, Tirur |
18.09.2024 | |
| 131 | CM 136/24-25 | Compressive strength of Hardened Concrete: M30 Project- Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
18.09.2024 | |
| 130 | CM 135/24-25 | Compressive strength of Hardened Concrete: M25 Project- Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
18.09.2024 | |
| 129 | CM 131/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
13.09.2024 | |
| 128 | CM 130/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
13.09.2024 | |
| 127 | CM 129/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
13.09.2024 | |
| 126 | CM 128/24-25 | Compressive strength of Hardened Concrete: Project: Navera Prithvi |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
13.09.2024 | |
| 125 | CM 134/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial Building, Valapad for Manappuram finance Limited-First Floor Roof Slab 2nd phase. |
Manappuram Finance Limited,Valapad. |
12.09.2024 | |
| 124 | CM 133/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial Building, Valapad for Manappuram finance Limited-Ground Floor Roof Slab 2nd phase. |
Manappuram Finance Limited,Valapad. |
12.09.2024 | |
| 123 | CM 127/24-25 | Compressive strength of AAC Blocks: Construction of Commercial Building, Valapad for Manappuram finance Limited- |
M/s Olivia projects, Flat no.G1, Gayathri Apartment, Punkunnam. Thrissur. |
10.09.2024 | |
| 122 | CM 126/24-25 | Test on Steel Liner Plate : Construction of Boat Jetty near Dana Kadav near Kakkathiruthy Bridge in Perinjanam Panchayath. |
Assistant Engineer, Irrigation Section, Irinjalakuda |
06.09.2024 | |
| 121 | CM 125/24-25 | Compressive strength of Hardened Concrete: Construction of Garage Annie Alukkas – Roof Beam and Slab First Floor |
M/s Olivia projects, Flat no.G1, Gayathri Apartment, Punkunnam. Thrissur. |
06.09.2024 | |
| 120 | CM 123/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur |
06.09.2024 | |
| 119 | CM 120/24-25 | Compressive strength of Cover block: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District. |
Project Manager, PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
04.09.2024 | |
| 118 | CM 119/24-25 | Compressive strength of Hardened Concrete:Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District.(Wall & Slab-4+090 to4+105) |
Project Manager, PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
04.09.2024 | |
| 117 | CM 118/24-25 | Compressive strength of Hardened Concrete:Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District.(Pier final & 2nd Lift-P72 &P82) |
Project Manager, PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
04.09.2024 | |
| 116 | CM 114/24-25 | Compressive strength of Red Bricks:Construction of Garage for Annie Alukkas |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
03.09.2024 | |
| 115 | CM 108/24-25 | Compressive strength of Paving Blocks:Testing of samples from outlet PT Fuels, Vengad |
Manager(Engineering), HPCL , Kozhikode |
03.09.2024 | |
| 114 | CM 107/24-25 | Compressive strength of Paving Blocks:Testing of samples from outlet Karinkallathani Petroleum, Karinkallathani |
Manager(Engineering), HPCL , Kozhikode |
03.09.2024 | |
| 113 | CM 106/24-25 | Compressive strength of Paving Blocks:Testing of samples from outlet Payyoli Petroleum, Payyoli. |
Manager(Engineering), HPCL , Kozhikode |
03.09.2024 | |
| 112 | CM 117/24-25 | Compressive strength of Hardened Concrete:Project: Navera Taneira(Column) |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur-680010 |
30.08.2024 | |
| 111 | CM 116/24-25 | Compressive strength of Hardened Concrete:Project: Navera Taneira(Firestair) |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur-680010 |
30.08.2024 | |
| 110 | CM 115/24-25 | Compressive strength of Hardened Concrete:Project: Navera Prithvi (Lintel) |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur-680010 |
30.08.2024 | |
| 109 | CM 113/24-25 | Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur-680010 |
30.08.2024 | |
| 108 | CM 112/24-25 | Compressive strength of Hardened Concrete:Project: Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur-680010 |
30.08.2024 | |
| 107 | CM 122/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial Building, Valapad for Manappuram finance Limited- First Floor Roof Slab 1st phase |
Manappuram Finance Limited,Valapad. |
30.08.2024 | |
| 106 | CM 111/24-25 | Test on Solid Blocks : Construction of of Residential Building at the Otter Road ,Pattikad,Thrissur |
Glady Jayaprakash, Rariyath, Natural Life, Pattikad |
29.08.2024 | |
| 105 | CM 46/24-25 | Compressive strength of Paving Blocks: Annual plan 2021-22, Construction of Building for the Assistant Educational Office Complex, Chalakudy, Thrissur |
Assistant Engineer, PWD Buildings Section, Chalakudy |
24.08.2024 | |
| 104 | CM 110/24-25 | Compressive strength of Hardened Concrete: Commercial cum Residential Building at Nellayi |
Mr. Ramesan, Attuvalappil(H), P.O. Nellayi, Thrissur. |
24.08.2024 | |
| 103 | CM 94/24-25 | Test on Rock Core : Soil Investigation works for various works of Irrigation Department- Soil investigation in line with development of KERI as Center of Excellence. |
Deputy Director, Instrumentation Division,KERI, Peechi, Thrissur |
19.08.2024 | |
| 102 | CM 105/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira (Columns) |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur-680010 |
19.08.2024 | |
| 101 | CM 104/24-25 | Compressive strength of Hardened Concrete: Project: Navera Taneira (Slab) |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy, Thrissur-680010 |
19.08.2024 | |
| 100 | CM 103/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial Building, Valapad for Manappuram Finance Ltd.-Ground floor Roof slab 2nd phase |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
14.08.2024 | |
| 99 | CM 102/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial Building,Valapad for Manappuram Finance Ltd.-Ground floor Roof slab 1st phase |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
14.08.2024 | |
| 98 | CM 100/24-25 | Test on Solid Blocks : 8″ – Construction of Commercial building for Manappuram Finance Ltd, Valapad |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
09.08.2024 | |
| 97 | CM 99/24-25 | Test on Solid Blocks : 6″ – Construction of Commercial building for Manappuram Finance Ltd, Valapad |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
09.08.2024 | |
| 96 | CM 98/24-25 | Test on Solid Blocks : 4″ – Construction of Commercial building for Manappuram Finance Ltd, Valapad |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
09.08.2024 | |
| 95 | CM 71/24-25 | Mix Design : M30 (Chettinad PPC) – General -Thottappally Spillway channel and leading channel-Protection work to the left and right bank of Pampa river (Leading channel to Thottappally Spillway) from Kurichikkal to Thottappally Spillway and downstream to the Pozhi mouth in Purakkad Grama Panchayath Ambalapuzha LAC |
Assistant Engineer, Irrigation Section, Thottappally |
09.08.2024 | |
| 94 | CM 50/24-25 | Mix Design : M30 (Ramco OPC 53) General -Thottappally Spillway channel and leading channel-Protection work to the left and right bank of Pampa river (Leading channel to Thottappally Spillway) from Kurichikkal to Thottappally Spillway and downstream to the Pozhi mouth in Purakkad Grama Panchayath Ambalapuzha LAC |
Assistant Engineer, Irrigation Section, Thottappally |
08.08.2024 | |
| 93 | CM 49/24-25 | Mix Design : M30 (Chettinad OPC 53) General -Thottappally Spillway channel and leading channel-Protection work to the left and right bank of Pampa river (Leading channel to Thottappally Spillway) from Kurichikkal to Thottappally Spillway and downstream to the Pozhi mouth in Purakkad Grama Panchayath Ambalapuzha LAC |
Assistant Engineer, Irrigation Section, Thottappally |
08.08.2024 | |
| 92 | CM 97/24-25 | Compressive strength of Hardened Concrete: Construction of Garage Annie Alukkas – Roof Beam and Slab |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08-08-2024 | |
| 91 | CM 96/24-25 | Compressive strength of Hardened Concrete: Construction of Feeding chal from Aadambu Thodu to Thachampilly Kulam in Arimpur Panchayath- Sluice Abutment |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08-08-2024 | |
| 90 | CM 95/24-25 | Compressive strength of Hardened Concrete:Construction of Feeding chal from Aadambu Thodu to Thachampilly Kulam in Arimpur Panchayath- Sluice Slab |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08-08-2024 | |
| 89 | CM 41/24-25 | Mix Design : M30 (Zuari PPC) – Pampar Basin Scheme- Reconstruction of Pattissery Dam and Canal system under Chengalar scheme- Dam and Appurtenant works–Counterfort retaining wall of saddle dam |
Assistant Engineer, Pampar Project Section no.3, Marayoor |
08-08-2024 | |
| 88 | CM 40/24-25 | Mix Design : M30 (Ramco PPC) – Pampar Basin Scheme- Reconstruction of Pattissery Dam and Canal system under Chengalar scheme- Dam and Appurtenant works –Counterfort retaining wall of saddle dam |
Assistant Engineer, Pampar Project Section no.3, Marayoor |
08-08-2024 | CM 40/24-25 |
| 87 | CM 39A/24-25 | Mix Design : M25 (Zuari PPC)-Pampar Basin Scheme- Reconstruction of Pattissery Dam and Canal system under Chengalar scheme- Dam and Appurtenant works –Wing wall and core wall of rock fill dam |
Assistant Engineer, Pampar Project Section no.3, Marayoor |
08-08-2024 | |
| 86 | CM 39/24-25 | Mix Design : M25 (Zuari PPC)- Pampar Basin Scheme- Reconstruction of Pattissery Dam and Canal system under Chengalar scheme- Dam and Appurtenant works -Pile concreting of saddle dam |
Assistant Engineer, Pampar Project Section no.3, Marayoor |
08-08-2024 | |
| 85 | CM 38A/24-25 | Mix Design : M25 (Ramco PPC)- Pampar Basin Scheme- Reconstruction of Pattissery Dam and Canal system under Chengalar scheme- Dam and Appurtenant works –Wing Wall and Core wall of rock fill dam |
Assistant Engineer, Pampar Project Section no.3, Marayoor |
08-08-2024 | |
| 84 | CM 38/24-25 | Mix Design : M25 (Ramco PPC)– Pampar Basin Scheme- Reconstruction of Pattissery Dam and Canal system under Chengalar scheme- Dam and Appurtenant works –Pile concreting of saddle dam |
Assistant Engineer, Pampar Project Section no.3, Marayoor |
08-08-2024 | |
| 83 | CM 93/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial Building, Valapad for Manappuram finance Limited- Ground Floor Roof Slab 1st phase |
Manappuram Finance Limited,Valapad. |
24.07.2024 | |
| 82 | CM 75/24-25 | Test on Concrete Paving Blocks:Testing of samples from outlet HPCL RO Chandrapinny, Thrissur. |
Manager(Engineering, HPCL , Kozhikode |
23.07.2024 | |
| 81 | CM 74/24-25 | Test on Concrete Paving Blocks:Testing of samples from outlet HPCL RO Chandrapinny, Thrissur. |
Manager(Engineering, HPCL , Kozhikode |
23.07.2024 | |
| 80 | CM 73/24-25 | Test on Concrete Paving Blocks:Testing of samples from outlet POPULAR RESITEMENT KUTTYADI |
Manager(Engineering0, HPCL , Kozhikode |
23.07.2024 | |
| 79 | CM 85/24-25 | STEEL TEST : Construction of Moolathara Right Bank Canal in Eruthenpathy Panchayath, Palakkad District |
Project Manager, PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
20.07.2024 | |
| 78 | CM 86/24-25 | STEEL TEST : Construction of Moolathara Right Bank Canal in Eruthenpathy Panchayath, Palakkad District |
Project Manager, PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
20.07.2024 | |
| 77 | CM 87/24-25 | STEEL TEST : Construction of Moolathara Right Bank Canal in Eruthenpathy Panchayath, Palakkad District |
Project Manager, PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
20.07.2024 | |
| 76 | CM 88/24-25 | Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District. |
Project Manager, PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
20.07.2024 | |
| 75 | CM 84/24-25 | Test on Concrete Paver Blocks:Testing of samples |
M/s Navera Builders, Kolazhy, Thrissur |
10.07.2024 | |
| 74 | CM 91/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building Valapad for Manappuram Finance Ltd.-Pilecap PC16,Column Second Lift C11,C14,C31 |
Manappuram Finance Limited,Valapad. |
08.07.2024 | |
| 73 | CM 90/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Column First Lift C11,C14,C31 |
Manappuram Finance Limited,Valapad. |
08.07.2024 | |
| 72 | CM 89/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Column 2nd Lift C8,Pilecap PC11,PC14 |
Manappuram Finance Limited,Valapad. |
08.07.2024 | |
| 71 | CM 70/24-25 | Compressive strength of Hardened Concrete:Construction of Feeding chal from Aadambu Thodu to Thachampilly Kulam in Arimpur Panchayath- Sluice Slab |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08.07.2024 | |
| 70 | CM 69/24-25 | Compressive strength of Hardened Concrete:Construction of Feeding chal from Aadambu Thodu to Thachampilly Kulam in Arimpur Panchayath- Tractor path -slab |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08.07.2024 | |
| 69 | CM 68/24-25 | Compressive strength of Hardened Concrete:Construction of Feeding chal from Aadambu Thodu to Thachampilly Kulam in Arimpur Panchayath- Sluice Abutment |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08.07.2024 | |
| 68 | CM 83/24-25 | Compressive strength of Hardened Concrete:General Education Department-Annual Plan 2020-21 Construction of School Buliding of Govt.Higher Secondary school Chembuchira ,Thrissur |
Assistant Engineer P.W.D Buildings Section Chalakudy. |
06.07.2024 | |
| 67 | CM 42/24-25 | NDT: Pile Integrity test – NABARD-RIDF XXVII-Construction of SWECB regulator cum Bridge across Shiriya River at Bambrana in Kumbla Panchayath, Kasaragod District |
Assistant Engineer, Minor Irrigation Section, Kumbla |
05.07.2024 | |
| 66 | CM 82/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building, Valapad for Manappuram Finance Ltd.-Column 2nd Lift C1,C10,C28 |
Manappuram Finance Limited,Valapad. |
04.07.2024 | |
| 65 | CM 81/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Lift side walls,Column C28 1ST Lift,C30 2nd Lift |
Manappuram Finance Limited,Valapad. |
04.07.2024 | |
| 64 | CM 80/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Staircase 1,Lift side walls |
Manappuram Finance Limited,Valapad. |
04.07.2024 | CM 80/24-25 |
| 63 | CM 79/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Column 2nd Lift C5,C7,C23,C25 |
Manappuram Finance Limited,Valapad. |
04.07.2024 | |
| 62 | CM 78/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Column 1st Lift C25,C30,C23 |
Manappuram Finance Limited,Valapad. |
04.07.2024 | |
| 61 | CM 77/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Column 2nd Lift C19,C26,C29,C24 |
Manappuram Finance Limited,Valapad. |
04.07.2024 | |
| 60 | CM 76/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Column 1st Lift C19,C26,C29,C24 |
Manappuram Finance Limited,Valapad. |
04.07.2024 | |
| 59 | CM 72/24-25 | Compressive strength of Hardened Concrete:General Education Department-Annual Plan 2020-21 Construction of School Buliding of Govt.Higher Secondary school Chembuchira ,Thrissur |
Assistant Engineer P.W.D Buildings Section Chalakudy. |
02.07.2024 | |
| 58 | CM 66/24-25 | Steel Test :KIIFB- Project Construction of Regulator cum Bridge across Bharathapuzha at Kankakkadavu in Kuttipuram Panchayath, Malappuram District. |
Project Engineer (Civil), RCB Kankakkadavu (RITES Ltd). |
21.06.2024 | |
| 57 | CM 67/24-25 | Compressive strength of Hardened Concrete:Construction of Villa project for Mr.Jagadish at Chiyyaram- Roof Slab |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
19.06.2024 | |
| 56 | CM 64/24-25 | Compressive strength of Hardened Concrete: Construction of ANNIE ALUKKAS-Pile Cap |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
15.06.2024 | |
| 55 | CM 48/24-25 | Steel Test :: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District |
Project Manager,PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
15.06.2024 | |
| 54 | CM 65/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial cum Residential Building at Nellayi |
Mr. Ramesan, Attuvalappil(H), P.O. Nellayi, Thrissur. |
12.o6.2024 | |
| 53 | CM 32/24-25 | Compressive strength of Hardened Concrete:General PSM-Maintenance works for shop building for the year 2021-22 |
Assistant Engineer,Head works Section,Peechi |
11.06.2024 | |
| 52 | CM 62/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Plinth Beam |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 51 | CM 61/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Plinth Beam |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 50 | CM 60/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Column 2nd Lift |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 49 | CM 59/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Pilecap,Plinth Beam. Column |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 48 | CM 58/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-STP Cover slab ,Plinth Beam. Column C17 |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 47 | CM 57/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Column 1st,2nd Lift ,Plinth Beam |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 46 | CM 56/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-.–Pile Cap ,Plinth Beam. |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 45 | CM 55/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-STP Inside wall,Column 2nd Lift. |
Manappuram Finance Limited,Valapad. |
07.06.2024 | CM 55/24-25 |
| 44 | CM 54/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-Pilecap-PC12 |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 43 | CM 53/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-STP Inner Walls |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 42 | CM 52/24-25 | Compressive strength of Hardened Concrete:Construction of Commercial Building ,Valapad for Manappuram Finance Ltd.-RWHT BaseSLAB,Liftpit sidewall,Plinth Beam |
Manappuram Finance Limited,Valapad. |
07.06.2024 | |
| 41 | CM 51/24-25 | Compressive strength of Hardened Concrete: Construction of Cindrella Apartment,Mannampetta |
Puthran.K.A,Mannampetta,. Thrissur |
04.06.2024 | |
| 40 | CM 37/24-25 | Test on Rock Core : General-MI IJK-Neithakudy-Puthenchira-Construction of salt water extrusion Regulator near Neithakudy Bridge in Puthenchira Grama Panchayath |
Assistant Engineer, MI Section, Irinjalakuda |
01.06.2024 | |
| 39 | CM 47/24-25 | Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District |
Project Manager,PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
31.05.2024 | |
| 38 | CM 43/24-25 | Test on Mechanically woven Double twisted hexagonal shaped wire mesh: CRCB-Construction of cutoff wall to avoid scouring near the side protection wall U/S of CRCB. |
Assistant Engineer, Chamravattom Project Section 1/1, Easwaramangalam, Ponnani. |
31.05.2024 | |
| 37 | CM 44/24-25 | Test on pipes, 14 and 12 Gauge wires : Assessing the quality of materials in the work at Kodumon Estate. |
The Manager Plantation Corporation of Kerala Ltd. Kodumon Estate |
30.05.2024 | |
| 36 | CM 36/24-25 | Compressive strength of Hardened Concrete:Construction of VISHRAM- UTSAVU- Column Pedestal. |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
30.05.2024 | CM 36/24-25 |
| 35 | CM 01/24-25 | Steel Test :Construction of New Building for District Collector’s Camp Office, Thrissur. |
Site Engineer, Nirmithi Kendra, Ayyanthole |
28.05.2024 | |
| 34 | CM 45/24-25 | Compressive strength of Hardened Concrete: Construction of Navera Prithvi Villa 6 – Lintel. |
M/s Navera Builders, Kolazhy, Thrissur |
27.05.2024 | |
| 33 | CM 03/24-25 | Tests on Aggregates : KIIFB- Project Construction of Regulator cum Bridge across Bharathapuzha at Kankakkadavu in Kuttipuram Panchayath, Malappuram District. |
DGM (Civil), RCB Kankakkadavu (RITES Ltd). |
27.05.2024 | |
| 32 | CM 02/24-25 | Steel Test : KIIFB Project Construction of Regulator cum Bridge across Bharathapuzha at Kankakkadavu in Kuttipuram Panchyath, Malappuram District. |
DGM (Civil), RCB Kankakkadavu (RITES Ltd). |
27.05.2024 | CM 02/24-24 |
| 31 | CM 34/24-25 | Compressive strength of Hardened Concrete: Construction of VISHRAM-UTSAVU -Plump concrete |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
23.05.2024 | CM 34/24-25 |
| 30 | CM 35/24-25 | Compressive strength of Hardened Concrete: Construction of Residence at Kanimangalam -RCC Slab. |
Nazimuddin Jabbar, Wahe Builders & Developers, West Palace Road,Thrissur. |
22.05.2024 | |
| 29 | CM 33/24-25 |
NDT : PyIP-RKI-Restoration of damaged main canal and UT near Ch.12/325km at Kara in Mattannur Muncipality |
Superintending Engineer, Project Circle, Kannur |
21.05.2024 | |
| 28 | CM 31/24-25 |
Test on GI pipes, 14 and 12 Gauge GI wires : Assessing the quality of materials in the work at Mannarghat Estate. |
The Manager, Plantation Corporation of Kerala Ltd., Mannarghat Estate |
17.05.2024 | |
| 27 | CM 30/24-25 |
Test on GI pipes, 14 and 12 Gauge GI wires : Assessing the quality of materials in the work at Kilikadu Area,Athirappilly Estate. |
The Manager, Plantation Corporation of Kerala Ltd. Kilikadu Estate |
17.05.2024 | |
| 26 | CM 29/24-25 |
Test on GI pipes, 14 and 12 Gauge GI wires : Assessing the quality of materials in the work at Athirappilly Estate. |
The Manager, Plantation Corporation of Kerala Ltd. Athirappilly Estate |
17.05.2024 | |
| 23 | CM 28/24-25 |
Test on GI pipes, 14 and 12 Gauge GI wires : Assessing the quality of materials in the work at Oilplam Estate. |
The Manager, Plantation Corporation of Kerala Ltd. Oilplam Estate |
17.05.2024 | |
| 24 | CM 27/24-25 |
Test on GI pipes, 14 and 12 Gauge GI wires : Assessing the quality of materials in the work at Kallala Estate. |
The Manager, Plantation Corporation of Kerala Ltd. Kallala Estate |
17.05.2024 | |
| 23 | CM 26/24-25 |
Test on GI pipes, 14 and 12 Gauge GI wires : Assessing the quality of materials in the work at Perambra Estate. |
The Manager, Plantation Corporation of Kerala Ltd. Perambra Estate |
17.05.2024 | |
| 22 | CM 25/24-25 |
Test on GI pipes, 14 and 12 Gauge GI wires : Assessing the quality of materials in the work at Rajapuram Estate. |
The Manager, Plantation Corporation of Kerala Ltd. Rajapuram Estate |
17.05.2024 | |
| 21 | CM 24/24-25 |
Test on GI pipes, 14 and 12 Gauge GI wires : Assessing the quality of materials in the work at Thannithodu Estate. |
The Manager, Plantation Corporation of Kerala Ltd. Thannithodu Estate |
17.05.2024 | |
| 20 | CM 23/24-25 |
Compressive strength of Solid Block:General Education department –Annual plan 2020-21, Construction of School Buliding of Government Higher Secondary school, Chembuchira ,Thrissur |
Assistant Engineer,PWD Building Section,Chalakudy
|
17.05.2024 | |
| 19 | CM 15/24-25 |
Compressive strength of Hardened Concrete:Construction of New Building for District Collector’s Camp Office, Thrissur- First floor beam. |
Project Manager, Nirmithi Kendra, Ayyanthole, Thrissur, |
15.05.2024 | |
| 18 | CM 17/24-25 |
Test on Z Type Sheet Pile: Construction of Kanathodu Regulator cum Bridge across Kurumali Puzha at Kundukadavu in Pudukkad Panchayath,Thrissur District |
Project Engineer-37, Kerala Irrigation Infrastructure Development Corporation Ltd, Thrissur |
13.05.2024 | |
| 17 | CM 21/24-25 |
Test on Concrete Paving Blocks :KIIFB 2016-17-Improvements to Chalakkudy -Anamala road (SH 21) BC Overlay from Ch 56/000 to 78/175 & providing BM & BC from Ch 78/175 to 88/403 in Thrissur District. |
Assistant Executive Engineer, PWD, KRFB-PMU Division, Ernakulam unit,Mamangalam, Edappally, Ernakulam. |
09.05.2024 | |
| 16 | CM 22/24-25 |
Compressive strength of Hardened Concrete:Construction of School Building of Govt.Higher Secondary school Chembuchira ,Thrissur-Footing Concrete |
Assistant Engineer P.W.D Buildings Section Chalakudy. |
09.05.2024 | |
| 15 | CM 19/24-25 |
Compressive strength of Hardened Concrete:Construction of Feeding Chal from ADAMPU Thodu to Thachampilly Kulam-Raft for Sluice |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08.05.2024 | |
| 14 | CM 18/24-25 |
Compressive strength of Hardened Concrete:Construction of Villa Project at Angamali- Plinth Belt |
M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur |
08.05.2024 | |
| 13 | CM 20/24-25 |
Compressive strength of Hardened Concrete:Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1 in Eruthenpathy Panchayath, Palakkad District. |
Project Manager,PRATHMESH & KK (J.V) 81.Tilak Nagar, Aurangabad, Maharashtra |
08.05.2024 | |
| 12 | CM 16/24-25 |
Steel Test:KLLFB-KILA 3 Crore Project -InfraStructure Development at GSMHSS , Thathamangalam – Code(21036) Under Chittur LAC in Palakkad District. |
Assistant Engineer, Local Self Govt. Department,Chittur- Thathamangalam Municipality |
06.05.2024 | |
| 11 | CM 12/24-25 |
Test on Corner post, ACSR Wire, Hanging Rope and Corner post (Bottom Piece): Assessing the quality of materials in the work at Solar Fencing at Vannunthura Tribal Colony |
Range Forest Officer, Kanthalloor Range, Sahayhgiri,Marayoor,Idukki. |
03.05.2024 | |
| 10 | CM 14/24-25 |
Compressive strength of Hardened Concrete:Commercial cum Residential Building at Nellayi |
Mr. Ramesan, Attuvalappil(H), P.O. Nellayi, Thrissur. |
25.04.2024 | |
| 9 | CM 13/24-25 |
Test on High Density Reflective Paving Blocks :Deposit- Kerala State Science and Technology Museum Thiruvananthapuram –Annual Plan Scheme for Regional Science Centre Chalakudy, 2021-22 -Construction of Toilet block ,Security Cabin, Development of Parking Area etc. |
Assistant Engineer P.W.D Buildings Section ,Chalakudy |
25.04.2024 | |
| 8 | CM 10/24-25 |
Test on High Density Reflective Paving Blocks : Testing of Samples from outlet PEECEES Petroleum ,Ayanchery. |
Manager (Engineering),HPCL, Kozhikode | 24.04.2024 | |
| 7 | CM 09/24-25 |
Test on High Density Reflective Paving Blocks : Testing of Samples from outlet KRN Fuels,Kadiyangad. |
Manager (Engineering),HPCL, Kozhikode | 24.04.2024 | |
| 6 | CM 08/24-25 |
Test on High Density Reflective Paving Blocks : Testing of Samples from outlet Shahin Petroleum, Puzhakatri, Perinthalmanna |
Manager (Engineering),HPCL, Kozhikode |
24.04.2024 | |
| 5 | CM 07/24-25 |
Test on High Density Reflective Paving Blocks : Testing of Samples from outlet NRO,Chelari,Kolapuram |
Manager (Engineering),HPCL, Kozhikode |
24.04.2024 | |
| 4 | CM 11/24-25 | Compressive strength of Hardened Concrete: Construction of Commercial Building Manappuram at Valappad-Pile Cap. | M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur | 18.04.2024 | CM 11/24-25 |
| 3 | CM 06/24-25 | Compressive strength of Hardened Concrete: Construction of Proposed Residence for Mr. Jagadish at Chiyyaram, Thrissur- Plinth Belt. | M/s Olivia Projects, Gayathri Apartment, Punkunnam, Thrissur | 09.04.2024 | CM 06/24-25 |
| 2 | CM 05/24-25 | Abrasion Test on Paving Blocks : |
BTech Students, SCMS School of Engineering & Technology, Vidya Nagar, Karukutty, Ernakulam-683582. |
09.04.2024 | CM 05/24-25 |
| 1 | CM 04/24-25 | Test on Paving Blocks : Deposit- Kerala State Science and Technology Museum Thiruvananthapuram –Annual Plan Scheme for Regional Science Centre Chalakudy, 2021-22 -Construction of Toilet block ,Security Cabin, Development of Parking Area etc. | Assistant Engineer P.W.D Buildings Section , Chalakudy | 09.04.2024 | CM 04/24-25 |