| TEST REPORTS 2026 | |||||
| Sl. No. | Report No. | Test Description | Customer | Date of issue | Download |
| 167 | CM827/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM 827/25-26 |
| 166 | CM826/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM 826/25-26 |
| 165 | CM825/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM 825/25-26 |
| 164 | CM824/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM 824/25-26 |
| 163 | CM823/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM 823/25-26 |
| 162 | CM822/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM 822/25-26 |
| 161 | CM821/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM 821/25-26 |
| 160 | CM820/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM 820/25-26 |
| 159 | CM819/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM 819/25-26 |
| 158 | CM203/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM203/25_26 |
| 157 | CM202/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM202/25_26 |
| 156 | CM201/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
13.04.2026 | CM201/25_26 |
| 155 | CM439/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 439/25-26 |
| 154 | CM438/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 438/25-26 |
| 153 | CM370/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 370/25-26 |
| 152 | CM369/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 369/25-26 |
| 151 | CM368/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 368/25-26 |
| 150 | CM346/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 346/25-26 |
| 149 | CM345/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 345/25-26 |
| 148 | CM344/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 344/25-26 |
| 147 | CM343/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 343/25-26 |
| 146 | CM342/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 342/25-26 |
| 145 | CM302/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 302/25-26 |
| 144 | CM301/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 301/25-26 |
| 143 | CM300/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 300/25-26 |
| 142 | CM299/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 299/25-26 |
| 141 | CM298/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
07.04.2026 | CM 298/25-26 |
| 140 | CM297/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
06.04.2026 | CM 297/25-26 |
| 139 | CM296/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
06.04.2026 | CM 296/25-26 |
| 138 | CM295/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
06.04.2026 | CM 295/25-26 |
| 137 | CM272/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
06.04.2026 | CM 272/25-26 |
| 136 | CM271/25-26 |
Compressive strength of Hardened Concrete :Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
06.04.2026 | CM 271/25-26 |
| 135 | CM270/25-26 |
Compressive strength of Hardened Concrete :Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
06.04.2026 | CM 270/25-26 |
| 134 | CM256/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
06.04.2026 | CM256/25_26 |
| 133 | CM255/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
06.04.2026 | CM255/25_26 |
| 132 | CM818/25-26 |
Compressive strength of Hardened Concrete :Villa at Angamaly |
Olivia projects.Flat no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam , Thrissur |
04.4.2026 | CM 818/25-26 |
| 131 | CM829/25-26 |
Compressive strength of Hardened Concrete : Vila at Thrissur |
Olivia projects.Flat no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam , Thrissur |
04.04.2026 | CM 829/25-26 |
| 130 | CM587B/25-26 |
Pile Integrity Test: Construction of Kainoor Regulator cum Bridge across Manali River-general Civil Work. |
Assistant Engineer, Peechi Project Section, Mannamangalam |
04.04.2026 | CM587B/25-26 |
| 129 | CM587A/25-26 |
Pile Integrity Test: Construction of Kainoor Regulator cum Bridge across Manali River-general Civil Work. |
Assistant Engineer, Peechi Project Section, Mannamangalam |
04.04.2026 | CM587A/25-26 |
| 128 | CM587/25-26 |
Pile Integrity Test: Construction of Kainoor Regulator cum Bridge across Manali River-general Civil Work. |
Assistant Engineer, Peechi Project Section, Mannamangalam |
04.04.2026 | CM587/25-26 |
| 127 | CM485/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 485/25-26 |
| 126 | CM484/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 484/25-26 |
| 125 | CM483/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 483/25-26 |
| 124 | CM482/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 482/25-26 |
| 123 | CM466/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 466/25-26 |
| 122 | CM465/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 465/25-26 |
| 121 | CM418/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 418/25-26 |
| 120 | CM417/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 417/25-26 |
| 119 | CM416/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 416/25-26 |
| 118 | CM415/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 415/25-26 |
| 117 | CM508/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 508/25-26 |
| 116 | CM507/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 507/25-26 |
| 115 | CM506/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 506/25-26 |
| 114 | CM597/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 597/25-26 |
| 113 | CM596/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 596/25-26 |
| 112 | CM595/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 595/25-26 |
| 111 | CM573/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 573/25-26 |
| 110 | CM572/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 572/25-26 |
| 109 | CM571/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 571/25-26 |
| 108 | CM570/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 570/25-26 |
| 107 | CM386/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 386/25-26 |
| 106 | CM385/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 385/25-26 |
| 105 | CM512/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 512/25-26 |
| 104 | CM511/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
01.04.2026 | CM 511/25-26 |
| 103 | CM621/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 621/25-26 |
| 102 | CM594/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 594/25-26 |
| 101 | CM593/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 593/25-26 |
| 100 | CM592/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 592/25-26 |
| 99 | CM584/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 584/25-26 |
| 98 | CM583/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 583/25-26 |
| 97 | CM582/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 582/25-26 |
| 96 | CM307/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 307/25-26 |
| 95 | CM306/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 306/25-26 |
| 94 | CM318/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 318/25-26 |
| 93 | CM329/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 329/25-26 |
| 92 | CM328/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 328/25-26 |
| 91 | CM542/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 542/25-26 |
| 90 | CM541/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 541/25-26 |
| 89 | CM540/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 540/25-26 |
| 88 | CM539/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 539/25-26 |
| 87 | CM538/25-26 |
Compressive strength of Hardened Concrete : Project – Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
31.03.2026 | CM 538/25-26 |
| 86 |
CM800/25-26 |
Compressive strength of Hardened Concrete : Project of Sathya Residency ,Guruvayur |
Olivia projects, Flat no.G1,Gayathri Apartment, Sankaramkulangara Temple Road, Punkunnam |
31.03.2026 | CM 800/25-26 |
| 85 |
CM668/25-26 |
Compressive strength of Hardened Concrete : Guruvayur Brahmana Samooham at Guruvayur |
Olivia projects, Flat no.G1,Gayathri Apartment, Sankaramkulangara Temple Road, Punkunnam |
31.03.2026 | CM 668/25-26 |
| 84 |
CM809/25-26 |
Test on Fencing Materials : Assess the quality of samples of materials Erecting Five line solar Fence around Njalloor to Chengara 2.7 km of NKFS in Konni Range during 2025-26 |
The Range Forest Officer, Konni |
31.03.2026 | CM 809/25-26 |
| 83 |
CM808/25-26 |
Test on Fencing Materials : Assess the quality of samples of materials tool room for Northkumaramperoor Forest Station in connection with mission solar Fencing of Konni Range during 2025-26 |
The Range Forest Officer, Konni |
31.03.2026 | CM 808/25-26 |
| 82 |
CM807/25-26 |
Test on Fencing Materials : Assess the quality of materials to set up a tool room for Solar fencing work at Mannarapara Range |
The Range Officer, Mannarapara Range, Konni Division. |
31.03.2026 | CM 807/25-26 |
| 82 |
CM806/25-26 |
Test on Fencing Materials : Assessing the quality of materials in the work for Construction of Physical Barrier for Mitigating Man Animal conflict under Konni Division fencing at Tool room Kokkathodu, Padam,Karippanthodu Forest Station areas in Naduvathumoozhy Range during 2025-26 |
The Range Forest Officer, Naduvathumoozhy Range |
31.03.2026 | CM 806/25-26 |
| 81 |
CM805/25-26 |
Test on Fencing Materials : Assess the quality of samples of materials Erecting Five line solar Fence around Kummannoor Mathaimuruppu- Medical college 2.5 km of SKFS in Konni Range during 2025-26 |
The Range Forest Officer, Konni |
31.03.2026 | CM 805/25-26 |
| 80 |
CM804/25-26 |
Test on Fencing Materials : Assess the quality of samples of materials tool room for Southkumaramperoor Forest Station in connection with mission solar Fencing of Konni Range during 2025-26 |
The Range Forest Officer, Konni |
31.03.2026 | CM 804/25-26 |
| 79 |
CM741/25-26 |
Test on Sieve Analysis of Coarse Aggregates : DEPOSIT-JJM-KWA-Jal Jeevan Mission Water supply scheme to Anganwadi, Thrikkadderi, Chalavara Panchayath. Construction of Check Dam across Thoothapuzha in Cherpulassery Muncipality- Palakkad District |
Assistant Engineer, minor Irrigation section, Cherpulassery | 28.03.2026 | CM741/25-26 |
| 78 |
CM769/25-26 |
Test on Steel Bars : Chavakkad Municipality – Budget Work -Construction of New Office Building |
Assistant Executive Engineer Chavakkad Municipality |
28.03.2026 | CM 769/25-26 |
| 77 |
CM789/25-26 |
Test on Steel Bars : Chavakkad Municipality – Budget Work -Construction of New Office Building |
Assistant Executive Engineer Chavakkad Municipality |
28.03.2026 | CM 789/25-26 |
| 76 |
CM732/25-26 |
Compressive strength of Hardened Concrete : Extension of Moolathara Right Bank Canal from Korayar to Varattayar(Civil works) in Eruthenpathy Panchayath, Palakkad District |
Project Manager, Prathmesh & KK (J.V), 81.Tilak Nagar, Aurangabad, Maharashtra. |
28.03.2026 | CM 738/25_26 |
| 75 |
CM738/25-26 |
Compressive strength of Hardened Concrete : Nil |
Konface Private Limited, Peringanoor, Mundur, Thrissur, Kerala |
28.03.2026 | CM 738/25_26 |
| 74 |
CM740/25-26 |
Compressive strength of Hardened Concrete :Annual Plan -PanancheryGrama Panchayath-Project No-171/2025-26 – Pananchery cut road, Jeevanjyothi road, Maintenance ward 23. |
Assistant Engineer, LID / EW section, Pananchery Grama Panchayath |
28.03.2026 | CM 740/25-26 |
| 73 |
CM680/25-26 |
NDT : LAC – ADS Construction of Box Culvert at Nettissery Branch Canal Ch.0/300 km |
Assistant Engineer, Peechi Project Section,Thanippadam,Poovanchira |
28.03.2026 | CM 680/25-26 |
| 72 |
CM736/25-26 |
Compressive strength of Hardened Concrete : LAC-ADS-LAC-ADC-2023-2024 Construction of New Building For PHC Ollukkara- New building. – General Civil Work |
Assistant Engineer, PWD Buildings section No. 1, Thrissur |
28.03.2026 | CM 736/25-26 |
| 71 |
CM760/25-26 |
Compressive strength & Density of Hardened Concrete : Construction of ST. MARY’S ASSUMPTION CHRUCH, Ayyanthole |
ST. MARY’S ASSUMPTION CHURCH, Ayyanthole, Thrissur |
27.03.2026 | CM760/25_26 |
| 70 |
CM753/25-26 |
Compressive strength of Hardened Concrete : Annual Plan 2025 – 26 Chalakudy Block Panchayath -Construction of new buliding in block panchayath office (S0126/ 26),Thrissur District General Work |
Assistant Executive Engineer LID & EW Sub Division, Chalakkudy Block Panchayath. |
27.03.2026 | CM 753/25-26 |
| 69 |
CM752/25-26 |
Test on Steel Bars : Chalakudy Block Panchayath : Annual plan 2025-26- Construction of New Building at Block Panchayath Compound |
Assistant Executive Engineer LID & EW Sub Division, Chalakkudy Block Panchayath. |
27.03.2026 | CM 752/2025-26 |
| 68 |
CM751/25-26 |
Compressive strength of Hardened Concrete : General MLA -ADS-2024-25 Kodungallur LAC Construction of new buliding and entrance gateway for Ramavilasam Govt.L.P.School , Kuruvilassery in Mala Panchayath, ,Thrissur District General Work |
Assistant Engineer, PWD Buildings section , Chalakkudy |
27.03.2026 | CM 751/25-26 |
| 67 |
CM647/25-26 |
Compressive strength of Hardened Concrete : GENERAL- MIC/Kizhuppillikkara LIS/2022 -Construction of Kizhuppillikkara Lift Irrigation Scheme in Thannyam Panchayath – Thrissur District – Balance work- General Civil work |
Assistant Engineer, minor Irrigation section, Cherpu |
27.03.2026 | CM 647/25-26 |
| 66 |
CM646/25-26 |
Compressive strength of Hardened Concrete : GENERAL- MIC/Kizhuppillikkara LIS/2022 -Construction of Kizhuppillikkara Lift Irrigation Scheme in Thannyam Panchayath – Thrissur District – Balance work- General Civil work |
Assistant Engineer, minor Irrigation section, Cherpu |
27.03.2026 | CM 646/25-26 |
| 65 |
CM645/25-26 |
Compressive strength of Hardened Concrete : GENERAL- MIC/Kizhuppillikkara LIS/2022 -Construction of Kizhuppillikkara Lift Irrigation Scheme in Thannyam Panchayath – Thrissur District – Balance work- General Civil work. |
Assistant Engineer, minor Irrigation section, Cherpu |
27.03.2026 | CM 645/25-26 |
| 64 |
CM644/25-26 |
Compressive strength of Hardened Concrete : GENERAL- MIC/Kizhuppillikkara LIS/2022 -Construction of Kizhuppillikkara Lift Irrigation Scheme in Thannyam Panchayath – Thrissur District – Balance work- General Civil work. |
Assistant Engineer, minor Irrigation section, Cherpu |
27.03.2026 | CM 644/25-26 |
| 63 |
CM643/25-26 |
Compressive strength of Hardened Concrete : GENERAL- MIC/Kizhuppillikkara LIS/2022 -Construction of Kizhuppillikkara Lift Irrigation Scheme in Thannyam Panchayath – Thrissur District – Balance work- General Civil work |
Assistant Engineer, minor Irrigation section, Cherpu |
27.03.2026 | CM 643/25-26 |
| 62 |
CM642/25-26 |
Compressive strength of Hardened Concrete : GENERAL- MIC/Kizhuppillikkara LIS/2022 -Construction of Kizhuppillikkara Lift Irrigation Scheme in Thannyam Panchayath – Thrissur District – Balance work – General Civil work |
Assistant Engineer, minor Irrigation section, Cherpu |
27.03.2026 | CM 642/25-26 |
| 61 |
CM641/25-26 |
Compressive strength of Hardened Concrete :GENERAL- MIC/Kizhuppillikkara LIS/2022 -Construction of Kizhuppillikkara Lift Irrigation Scheme in Thannyam Panchayath – Thrissur District – Balance work- General Civil work. |
Assistant Engineer, minor Irrigation section, Cherpu |
27.03.2026 | CM 641/25-26 |
| 60 |
CM691/25-26 |
Compressive strength of Hardened Concrete : Nil |
George M Peter, Manayath House,Pattikkad |
27.03.2026 | CM 691 /25-26 |
| 59 |
CM745/25-26 |
Compressive strength of Hardened Concrete :Annual Plan 2025-26 Puthur Grama Panchayath ward 5 Nayadichira Kurishumpadi Road -Pro. No: 194/PTR- General Civil Work |
Assistant Engineer, LSGD section, Puthur Grama Panchayath |
27.03.2026 | CM 745/25-26 |
| 58 |
CM744/25-26 |
Compressive strength of Hardened Concrete : Annual Plan 2025-26 Puthur Grama Panchayath ward 10 Subramaniyan Kavala Road Completion -Pro. No: 464/PTR- General Civil Work |
Assistant Engineer, LSGD section, Puthur Grama Panchayath |
27.03.2026 | CM 744/25-26 |
| 57 |
CM743/25-26 |
Compressive strength of Hardened Concrete : Annual Plan 2024-25 Puthur Grama Panchayath ward 10 Subramaniyan Kavala Road – Pro. No: 431/PTR- General Civil Work |
Assistant Engineer, LSGD section, Puthur Grama Panchayath |
27.03.2026 | CM 743/25-26 |
| 56 |
CM742/25-26 |
Compressive strength of Hardened Concrete : Annual Plan 2025-26 Puthur Grama Panchayath ward 7 Thanichodu Road -Pro. No: 137/PTR- General Civil Work |
Assistant Engineer, LSGD section, Puthur Grama Panchayath |
27.03.2026 | CM 742/25-26 |
| 55 |
CM724/25-26 |
Compressive strength of Hardened Concrete : GENERAL- Slope correction work of Amballur branch canal from Ch.11/800 km and 12/200 – General civil work – Irrigation Section , Manjamkuzhi |
Assistant Engineer, Irrigation Quality Control Section, Thrissur |
27.03.2026 | CM 724/25-26 |
| 54 |
CM759/25-26 |
Compressive strength of Hardened Concrete : Annual Plan – 2023 -24 -Construction of School Building for Govt.Model Boys Higher Secondary School Irinjalakkuda |
Assistant Engineer, PWD Buildings section , Irinjalakuda |
27.03.2026 | CM 759/25-26 |
| 53 |
CM739/25-26 |
Compressive strength of Hardened Concrete : General PSM – Improvement works to Thanikudam distributory chanal between ch.2/700 to 2/900 Km General Civil work |
Assistant Engineer, Irrigation Quality Control Section, Thrissur |
27.03.2026 | CM 739/25-26 |
| 52 |
CM750/25-26 |
Compressive strength of Hardened Concrete : Annual Plan -2025-26-Puthur Grama Panchayath Ward 16 Anganwadi road – Pro. No: 130/PTR- General civil work |
Assistant Engineer, LSGD section, Puthur Grama Panchayath |
27.03.2026 | CM 750/25-26 |
| 51 |
CM748/25-26 |
Compressive strength of Hardened Concrete :LAC-ADS-Nattika LAC – Construction of kitchen in VPM SNDP Higher Secondary School , Kazhimbram, Valappad GP Thalikulam BP-In Thalikulam BP |
Assistant Executive Enginee LID & EW Sub Division, Thalikulam Block Panchayath, Thrissur |
27.03.2026 | CM 748/25-26 |
| 50 |
CM749/25-26 |
Compressive strength of Concrete Paving Block : 2023-24 Construction of New Building for Government L P school, Puthur, New Building Regarding |
Assistant Engineer, PWD Buildings section No. 1, Thrissur |
27.03.2026 | CM 749/25-26 |
| 49 |
CM766/25-26 |
Test on Steel Bars : GENERAL- Navakeralam – Renovation works to Thrikkaikulam in Desamangalam Grama Panchayath- General Civil Work |
Assistant Engineer, Minor Irrigation Section, Wadakkanchery |
27.03.2026 | CM766/25-26 |
| 48 |
CM779/25-26 |
Compressive strength of Hardened Concrete : PRO.NO. 164/26 KUTTAN SMARAKAM ROAD CONCRETING WARD 13 |
Assistant Engineer, LSGD section, Kodassery Grama Panchayath |
27.03.2026 | CM 779/25-26 |
| 47 |
CM778/25-26 |
Compressive strength of Hardened Concrete : PRO.NO. 161/25-26 VELLIKULANGARA THENAMKILI VEED ROAD CONCRETING WARD 6 |
Assistant Engineer, LSGD section, Kodassery Grama Panchayath |
27.03.2026 | CM 778/25-26 |
| 46 |
CM795/25-26 |
Compressive strength of Hardened Concrete : 66/25-26 Completion of Cheriyathodu. |
Assistant Engineer, LSGD section, Nadathara Grama Panchayath |
27.03.2026 | CM 795/25-26 |
| 45 |
CM763/25-26 |
Test on Fencing Materials : Assessing the quality of materials in the work for Construction of PhysicalBarrier for Mitigating of Man Animal conflict under Pathanapuram Range of Punalur Division – Solar Power Fencing around 2025 Olapara teak plantation under Ambanar Forest Station in Pathanapuram Range. |
The Range Forest Officer, Ambanar Model Forest Station,Pathanapuram |
27.03.2026 | CM 763/25-26 |
| 44 |
CM786/25-26 |
Compressive strength of Hardened Concrete : Pro.No. 173/25-26 Chembankunnu Pulinkara road drainage ward 10 Kodassery Grama Panchayath |
Assistant Engineer, LSGD section, Kodassery Grama Panchayath |
27.03.2026 | CM 786/-25-26 |
| 43 |
CM783/25-26 |
Compressive strength of Hardened Concrete : Annual Plan -2025-26-Puthur Grama Panchayath Ward 3 Vettukkadu Colony 1st Street road – Pro. No: 135/PTR/- General civil work |
Assistant Engineer, LSGD section, Puthur Grama Panchayath |
27.03.2026 | CM 783/25-26 |
| 42 |
CM780/25-26 |
Compressive strength of Hardened Concrete : LAC-ADS-LAC-ADC-2023-2024 Construction of New Building For PHC Ollukkara- New building. – General Civil Work |
Assistant Engineer, PWD Buildings section No. 1, Thrissur |
27.03.2026 | CM 780/25-26 |
| 41 |
CM772/25-26 |
Compressive strength of Hardened Concrete : Facilities to avoid water logging in Kannukalichal Mannoor road ward 8 |
Assistant Engineer, LID & EW section, Nadathara |
27.03.2026 | CM772/25-26 |
| 40 |
CM771/25-26 |
Compressive strength of Hardened Concrete : Construction of Ambedkar Road drain culvert ward 12 |
Assistant Engineer, LID & EW section, Nadathara |
27.03.2026 | CM 771/25-26 |
| 39 |
CM770/25-26 |
Compressive strength of Hardened Concrete : 343/24-25, 2022-2023 Health Grant Scheme – 1 Vellanikkodu FWC Building Construction – General Civil Work |
Assistant Engineer, LID & EW section, Nadathara |
27.03.2026 | CM770/25-26 |
| 38 |
CM774/25-26 |
Compressive strength of Hardened Concrete : 343/24-25, 2022-2023 Health Grant Scheme – 1 Vellanikkodu FWC Building Construction – General Civil Work |
Assistant Engineer, LID & EW section, Thrikkur Grama Panchayath |
27.03.2026 | CM 774/25-26 |
| 37 |
CM762/25-26 |
Test on Fencing Materials : Installation of Solar hanging Fencing at Blavana to Pooyamkutty Forest Station under Pooyamkutty Forest Station, Kuttampuzha Range Office, Malayattoor Division |
The Range Forest Officer, Kuttampuzha, Kothamangalam |
27.03.2026 | CM 762/25-26 |
| 36 |
CM761/25-26 |
Test Conducted on Solid Blocks : MLA-ADS-Pattanchery Grama Panchayath Office – Construction of an Office Building for Pattanchery Grama Panchayath-Phase 1 |
Assistant Engineer, PWD Buildings section, Nenmara, Palakkad. |
27.03.2026 | CM 761/25-26 |
| 35 |
CM773/25-26 |
Compressive strength of Hardened Concrete : Kainoor RCB-Construction of Kainoor Regulator cum Bridge across Manali River – Peechi Project Section, Mannamangalam |
Assistant Engineer, Irrigation Quality Control Section, Thrissur |
27.03.2026 | CM 773/25-26 |
| 34 |
CM758/25-26 |
Compressive strength of Hardened Concrete : Chimoni Dam -CDP-Dam Safety -Concreting over d/s Rip Rap –Protection works to d/s Rip Rap Portion – General Civil Work – CDP Section No.1 Chimmony Dam |
Assistant Engineer, Irrigation Quality Control Section, Thrissur |
27.03.2026 | CM 758/25-26 |
| 33 |
CM757/25-26 |
Compressive strength of Hardened Concrete : General- K9/KDLR/2022-23 Valiyathode Scheme in Mathilakam block panchayath Phase-2 construction work of Thonikkulam and side protection work for Valiyathode – Minor Irrigation Section , Kodungallur |
Assistant Engineer, Irrigation Quality Control Section, Thrissur |
27.03.2026 | CM 757/25-26 |
| 32 |
CM756/25-26 |
Compressive strength of Hardened Concrete : Construction of Pallur North Padashekkaram LIS in Deshamangalam Gramapanchayath Phase II –Minor Irrigation Section Wadakkanchery |
Assistant Engineer, Irrigation Quality Control Section, Thrissur |
27.03.2026 | CM 756/25-26 |
| 31 |
CM755/25-26 |
Compressive strength of Hardened Concrete : General -Urgent maintenance works to LBMC ch 21/800 Km of Vazhani Irrigation – General Civil Work – Irrigation Section Wadakkanchery |
Assistant Engineer, Irrigation Quality Control Section, Thrissur |
27.03.2026 | CM 755/25-26 |
| 32 |
CM754/25-26 |
Test on Steel Bars : General- K9/KDLR/2022-23 Valiyathode Scheme in Mathilakam block panchayath Phase-2 construction work of Thonikkulam and side protection works for Valiyathode – M.I.Section, Kodungallur |
Assistant Engineer, Irrigation Quality Control Section, Thrissur |
27.03.2026 | CM754/25-26 |
| 31 |
CM765/25-26 |
Compressive strength of Hardened Concrete : SUPPLYING AND INSTALLATION OF AUTOMATED HEATING SYSTEM BIOGAS TO CNG CONVERTER PLANT 25 TPD |
Assistant Executive Engineer, LID & EW section, Sub Division, Cherpu |
27.03.2026 | CM765/25_26 |
| 31 |
CM811/25-26 |
Compressive strength of Hardened Concrete : SUPPLYING AND INSTALLATION OF AUTOMATED HEATING SYSTEM BIOGAS TO CNG CONVERTER PLANT 25 TPD |
Assistant Engineer, Project Wing, LSGD, Thrissur Corporation |
27.03.2026 | CM811/25-26 |
| 30 |
CM798/25-26 |
Compressive strength of Concrete Paving Block : Project No -Pananchery Grama Panchayath – Project No-557/2025-26- ThekkekulamMahathma Road CC Block Paving Ward 13 |
Assistant Engineer, LID / EW section, Pananchery Grama Panchayath |
24.03.2026 | CM 798/25-26 |
| 29 |
CM796/25-26 |
Compressive strength of Hardened Concrete : General Education Dept.Annual plan 2021-22 Construction of school building Government Girls Higher secondary school and vocational Higher secondary school Irinjalakuda |
Assistant Engineer, PWD Buildings section, Irinjalakuda, Thrissur. |
24.03.2026 | CM 796/25-26 |
| 28 |
CM785A/25-26 |
Compressive strength of Concrete Paving Block : Laying of Paver Block at HPCL Retail Outlet M/s SATHISH PETROLEUM (NRO Pattavayal) |
Officer, Retail Engineering, Hindustan Petroleum Corporation Ltd.Coimbatore Regional Office. |
24.03.2026 | CM 785A/25-26 |
| 27 |
CM785/25-26 |
Compressive strength of Concrete Paving Block : Laying of Paver Block at HPCL Retail Outlet M/s SATHISH PETROLEUM (NRO Pattavayal) |
Officer, Retail Engineering, Hindustan Petroleum Corporation Ltd.Coimbatore Regional Office. |
24.03.2026 | CM 785/25-26 |
| 26 |
CM815/25-26 |
Compressive strength of Hardened Concrete : Pro. No.52/25-26 Pakal Veedu Construction Ward 2 Kodassery GP |
Assistant Engineer, LID / EW section, Kodassery Grama Panchayath |
24.03.2026 | CM 815/25-26 |
| 25 |
CM816/25-26 |
Compressive strength of Hardened Concrete : Pro. No.52/25-26 Pakal Veedu Construction Ward 2 Kodassery GP |
Assistant Engineer, LID / EW section, Kodassery Grama Panchayath |
24.03.2026 | CM 816/25-26 |
| 24 |
CM802/25-26 |
Compressive strength of Hardened Concrete : Extension of Moolathara Right Bank Canal from Korayar to Varattayar(Civil works) in Eruthenpathy Panchayath, Palakkad District |
Project Manager, Prathmesh & KK (J.V), 81.Tilak Nagar, Aurangabad, Maharashtra. |
24.03.2026 | CM 802/25_26 |
| 23 |
CM810/25-26 |
Compressive strength of Hardened Concrete : GENERAL-Higher Education Department -Technical Education-Annual Plan 2023-24-Construction activities in respect of various Government Polytechnic Colleges- Construction of New Academic Block of Govt.Polytechnic College Koratty – First Phase- Construction of New Academic Block of Govt. Polytechnic College Koratty – First Phase – Composite Work-1 |
Assistant Engineer, PWD Buildings section, Chalakudy. |
23.03.2026 | CM 810/25-26 |
| 22 |
CM803/25-26 |
Compressive strength of Hardened Concrete : Extension of Moolathara Right Bank Canal from Korayar to Varattayar(Civil works) in Eruthenpathy Panchayath, Palakkad District. |
Project Manager, Prathmesh & KK (J.V), 81.Tilak Nagar, Aurangabad, Maharashtra. |
23.03.2026 | CM 803/25_26 |
| 21 |
CM673/25-26 |
Test on Cement : DEPOSIT-JJM-KWA-Jal Jeevan Mission Water supply scheme to Anganwadi, Thrikkadderi, Chalavara Panchayath. Construction of Check Dam across Thoothapuzha in Cherpulassery Muncipality – Palakkad District |
Assistant Engineer, Minor Irrigation Section, Cherpulassery |
23.03.2026 | CM 673/25-26 |
| 20 |
CM674/25-26 |
Test on Cement : DEPOSIT-JJM-KWA-Jal Jeevan Mission Water supply scheme to Anganwadi, Thrikkadderi, Chalavara Panchayath. Construction of Check Dam across Thoothapuzha in Cherpulassery Muncipality – Palakkad District |
Assistant Engineer, Minor Irrigation Section, Cherpulassery |
23.03.2026 | CM 674/25-26 |
| 19 |
CM746/25-26 |
Test on Steel Bars : NABARD-RIDF-XXX- Interlinking of Bharathapuzha and Biyyam lake in Ponnani Taluk, Malappuram District |
Assistant Engineer, Irrigation Quality Control Section, Eswaramangalam |
23.03.2026 | CM 746/25-26 |
| 18 |
CM747/25-26 |
Test on Steel Bars : GENERAL- Rectification of Velliyamkallu Regulator Cum Bridge at Thrithala across Bharathapuzha -Phase2 -Rectification of Velliyamkallu RCB Phase – II including reconstruction of damaged retaining wall -General Civil Work |
Assistant Engineer, Irrigation Quality Control Section, Eswaramangalam |
23.03.2026 | CM 747/25-26 |
| 17 |
CM733/25-26 |
Test on Steel Bars : Extension of Moolathara Right Bank Canal from Korayar to Varattayar(Civil works) in Eruthenpathy Panchayath, Palakkad District. |
Project Manager, Prathmesh & KK (J.V), 81.Tilak Nagar, Aurangabad, Maharashtra. |
23.03.2026 | CM 733/25-26 |
| 16 |
CM813/25-26 |
Compressive strength of Hardened Concrete : Balance Finishing work of Vadanappilly Police Station Thrissur ,Rural |
Assistant Engineer, LID / EW section, Kodassery Grama Panchayath |
23.03.2026 | CM 813/25-26 |
| 15 |
CM812/25-26 |
Compressive strength of Hardened Concrete : Balance Finishing work of Vadanappilly Police Station Thrissur ,Rural |
Project Engineer, KPHCC, Thrissur |
23.03.2026 | CM 812/25-26 |
| 14 |
CM630/25-26 |
Mix Design : General – Annual Plan 2023-24- Construction of school building for Government Victoria L.P. School, Chittur, Palakkad |
Assistant Engineer, PWD Buildings section, Thattamangalam,Chittur |
21.03.2026 | CM 630/25-26 |
| 13 |
CM767/25-26 |
Compressive strength of Hardened Concrete : GENERAL-FY 2025-26 -Refurbishment of Soil Mechanics Laboratory for NABL Compliance – General Civil Work |
Deputy Director, Soil Mechanics & Foundation Division, KERI,Peechi, Thrissur . |
21.03.2026 | CM 767 /2025-26 |
| 12 |
CM707/25-26 |
Compressive strength of Hardened Concrete : GENERAL- FY 2025-2026 – Refurbishment of Soil Mechanics Laboratory for NABL Compliance -General civil Work |
Deputy Director, Soil Mechanics & Foundation Division, KERI,Peechi, Thrissur . |
21.03.2026 | CM 707/25-26 |
| 11 |
CM801/25-26 |
Compressive strength of Hardened Concrete : GENERAL-Scouts& Guides,Kakkayaur Construction of Dormitory & Maintenance work at Kakkayur. Koduvayur,Palakkad -General Civil Work |
Assistant Engineer, PWD Buildings section, Nenmara |
21.03.2026 | CM 801/25-26 |
| 10 |
CM799/25-26 |
Compressive strength of Hardened Concrete : Annual Plan 2024-2025 Puthur Grama Panchayath Ward – 10 AKG road cana culvert construction Pro.no:493/PTR/-General Civil Work |
Assistant Engineer, LSGD Section, Puthur Grama Panchayath |
21.03.2026 | CM 799/25-26 |
| 9 |
CM794/25-26 |
Compressive strength of Hardened Concrete : Supplying and installation of Automated Heating System Biogas to CNG Converter Plant 25 TPD |
Assistant Engineer, LSGD Section, Puthur Grama Panchayath |
21.03.2026 | CM 794/25-26 |
| 8 |
CM790/25-26 |
Compressive strength of Hardened Concrete : Construction of ST. MARY’S ASSUMPTION CHRUCH, Ayyanthole |
ST. MARY’S ASSUMPTION CHRUCH, Ayyanthole |
21.03.2026 | CM790/25_26 |
| 7 |
CM784/25-26 |
Compressive strength of Hardened Concrete : Budget 2024-2025 Construction of new building for Karupadadanna Govt. L. P School Thrissur Districts |
Assistant Engineer, PWD Buildings section, Kodungallur |
21.03.2026 | CM 784/25-26 |
| 6 |
CM768/25-26 |
Compressive strength of Hardened Concrete : Supplying and installation of Automated Heating System Biogas to CNG Converter Plant 25 TPD |
Assistant Engineer, Project wing, LSGD, Thrissur Corporation |
21.03.2026 | CM768/25-26 |
| 5 |
CM775/25-26 |
Test on Fencing Materials : Assessment of the quality of the materials to be used in Solar Hanging Fencing Around Bamboo Grove. |
The Range Forest Officer, Thekkady Range Forest Office, Periyar East Division |
19.03.2026 | CM 775/25-26 |
| 4 |
CM777/25-26 |
Compressive strength of Concrete Paving Block: MLA- SDF- 2025-2026 Chalakudy LA Construction of St. Antonys road in Kadukutty GP-of Chalakudy Block Panchayath- Agmt.No:60/25-26 Dtd: 23.02.2026 |
Assistant Engineer, LSGD SUB Division, Chalakudy Block Panchayath |
19.03.2026 | CM 777/25-26 |
| 3 |
CM776/25-26 |
Compressive strength of Concrete Paving Block: MLA- SDF- 2025-26 Construction of St. Antonys Chapel road in Kadukutty GP-of Chalakudy LAC- Agmt no.57/25-26 Dtd: 04.02.26 |
Assistant Engineer, LSGD SUB Division, Chalakudy Block Panchayath |
19.03.2026 | CM 776/25-26 |
| 2 |
CM782/25-26 |
Compressive strength of Hardened Concrete : Total Development plan for Thanikkudam River Phase 1 – Irrigation Section Ollukkara |
Assistant Engineer, Irrigation Quality Control Section, Thrissur |
16.03.2026 | CM 782/25-26 |
| 1 | CM781/25-26 | Compressive strength of Hardened Concrete : Kainoor RCB – Construction of Kainoor Regulator cum Bridge across Manali River- Peechi Project Section , Mannamangalam | Assistant Engineer, Irrigation Quality Control Section, Thrissur | 16.03.2026 | CM 781/25-26 |