Sl. No. Report No. Test Description  Customer  Date of issue Download          
118 CM127/26-27 Compressive strength of Hardened Concrete : Guruvayur Brahmana Samooham, Guruvayur

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

06.07.2026 CM 127/26-27          
117 CM131/26-27 Compressive strength of Hardened Concrete :  GENERAL-Scouts & Guides, Kakkayur Construction of Dormitory & Maintenance work at Kakkayur – Koduvayur, Palakkad -General Civil Work

    Assistant Engineer, PWD Buildings Section, Nemmara

01.07.2026 CM 131/26-27          
116 CM130/26-27 Compressive strength of Hardened Concrete :  GENERAL-Scouts & Guides, Kakkayur Construction of Dormitory & Maintenance work at Kakkayur – Koduvayur, Palakkad -General Civil Work

    Assistant Engineer, PWD Buildings Section, Nemmara

01.07.2026 CM 130/26-27          
115 CM125/26-27 Compressive strength of Hardened Concrete :  Annual Plan – Pno 55/26 Kundan-chal renovation – Nadathara GP ward 14 Iravimangalam -Ollukkara BP- General Civil Work

                        Assistant Engineer,                                               LSGD ( LID & EW) Sub Division,                Ollukkara Block Panchayath

01.07.2026 CM 125/26-27          
114 CM73A/26-27 Report of the Sieve Analysis of Aggregates: GENERAL-Scouts & Guides, Kakkayur Construction of Dormitory &  Maintenance work at Kakkayur. Koduvayur, Palakkad -General Civil Work 

Assistant Engineer, PWD Buildings Section, Nemmara

01.07.2026 CM73A/26-27          
113 CM126/26-27 Compressive strength of Hardened Concrete :  Sathya Residency, Guruvayur

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

01.07.2026 CM 126/26-27          
112 CM122/26-27 Compressive strength of Hardened Concrete :  Mr.Rasheed, Ayyanthole

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

01.07.2026 CM 122/26-27          
111 CM73/26-27

Report of Mix Design: GENERAL-Scouts& Guides,Kakkayaur Construction of Dormitory & Maintenance work at Kakkayur. Koduvayur,Palakkad -General Civil Work

 Assistant Engineer, PWD Buildings Section, Nenmara

29.06.2026 CM 73/26-27          
110 CM124/26-27 Compressive strength & Density of Hardened Concrete : Nil

ACERO  Structural Engineers Pvt Ltd, Green Park Avenue , Thrissur -680003

27.06.2026 CM124/26_27          
109 CM117/26-27 Compressive strength of Burnt Clay Building Bricks: Residential building at Edappally for Mr Mithun Chittilappily

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

27.06.2026 CM 117/26-27          
108 CM123/26-27 Test on Fencing materials:  Assessing the quality of materials in the work for Installation of hanging Solar Fencing at Vanmavu area Idukki Wildlife Sancturay, Idukki (1.5 KM), Inchapara area Idukki Wildlife Sancturay, Idukki (1.5 KM), Kothapara area Idukki Wildlife Sancturay, Idukki (1.2 KM), Kollathikavu area Idukki Wildlife Sancturay, Idukki (1.2 KM)

 

Project Engineer,Kerala Police Housing and Construction Corporation Ltd., Kottayam

25.06.2026 CM 123/26-27          
107 CM111/26-27 Compressive strength of Burnt Clay Building Bricks: Villa at Thrissur

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

25.06.2026 CM 111/26-27          
106 CM69/26-27

 Quality Test of various materials :  Reconstruction of Unniyal bridge across Canoli Canal at Tanur LAC in Malappuram District

The Assistant Engineer, PWD Bridges Section, Tirur

25.06.2026 CM69/ 25-26          
105 CM105/26-27

Test on Fencing materials: Installation of Solar Fencing under Idukki package – Kulamankuzhi- Unnathi region (3 km) of Valara Forest Station, Neriyamangalam Range, Munnar Forest Division 

                             Range Forest Officer,                                    Neriyamangalam Range Office

23.06.2026 CM 105/26-27          
104 CM70/26-27

Tests on Steel Bars :CSIND-Construction of a Lock cum Bridge in Ch 316.728 km of West Coast canal at Veliyancode in Ponnani Taluk in Malappuram District(Phase -2 works)

                     Assistant Engineer,                                                      Irrigation Section No:2 ,                          Ponnani..

23.06.2026 CM 70/26-27          
103 CM113/26-27

Compressive strength of Hardened Concrete : Extension of  Moolathara Right Bank Canal from Korayar to Varattayar (Civil works) in Eruthenpathy  Panchayath, Palakkad District.

Project Manager, Prathmesh &KK (J.V),81.Tilak Nagar, Aurangabad, Maharashtra

23.06.2026 CM 113/26_27          
102 CM116/26-27

Compressive strength of Hardened Concrete : Commercial Buliding at Chungam, Thrissur

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

23.06.2026 CM 116/26-27          
101 CM109/26-27

Compressive strength of Hardened Concrete : Villa at Thrissur

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

23.06.2026 CM 109/26-27          
100 CM108/26-27

Compressive strength of Hardened Concrete : Mr. rasheed, Ayyanthole

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

23.06.2026 CM 108/26-27          
99 CM110/26-27

Compressive strength of Hardened Concrete : Villa At Cherpu

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

23.06.2026 CM 110/26-27          
98 CM78/26-27

Ultrasonic Pulse Velocity Test & Rebound Hammer test: Piip-RKI Restoration of damaged main canal and UT near ch:12/325 km at Kara in Mattannur Municipality

Superintending Engineer,Irrigation Section,Project Circle,Kannur

22.06.2026 CM78/26-27          
97 CM112/26-27

Tests on Steel Bars : Annual Plan-2025-26 AGR GP- Construction of shopping complex in Alagappanagar GP- Proj no.319/26- General Civil Work.

     Assistant Engineer, LID & EW Section, Alagappanagar Grama Panchayath

22.06.2026 CM 112/26-27          
96 CM102/26-27

Compressive strength of Concrete Paving Block: GENERAL-LRRP-LRRP 2024-25 -PUTHUKKAD LAC -SI NO :589, ALANGAD BHARATHA ROAD IN WARD 9, Thrikkur GP, Thrissur District – General Civil Work

Assistant Engineer, LSGD Section, Thrikkur Grama Panchayath.

19.06.2026 CM 102/26-27          
95 CM107/26-27

Compressive strength of Hardened Concrete :  Reconstruction of Retaining wall at km 3/300 LHS at Tachanady – Plazhy road

Assistant Engineer, PWD Roads Section, Alathur

19.06.2026 CM 107/26-27          
94 CM106/26-27

Compressive strength of Hardened Concrete : Reconstruction of Retaining wall at km 3/300 LHS at Tachanady – Plazhy road

Assistant Engineer, PWD Roads Section, Alathur

19.06.2026 CM 106/26-27          
93 CM104/26-27

Compressive strength of Hardened Concrete : Annual Plan – Pno.51/26 – Construction of Murukkumkund Cherumkuzhy Sanketham road – Ollukkara BP – General Civil Work.

Assistant Engineer, LSGD (LID & EW) Sub Division, Ollukkara Block Panchayath.

19.06.2026 CM 104/26-27          
92 CM86/26-27

Tests on Steel Bars : Chavakkad Municipality – Budget Work -Construction of New Office Building

                             Assistant Engineer,                                                         LSGD (LD &EW),                                                    Chavakkad Municipality

17.06.2026 CM86/26-27          
91 CM42/26-27

Report of Mix Design: GENERAL-CSIND-Construction of  Lock cum Bridge in Ch 316.728 km of West Coast canal at Veliyancode in Ponnani Taluk in Malappuram District (PHASE 1 BALANCE WORK) Phase 1 Balance work-General Civil Works

 Assistant Engineer, Irrigation Section No.2, Ponnani

17.06.2026 CM42/26-27          
90 CM81/26-27

Compressive strength of Concrete Core :  REBUILD-KERALA-INTIATIVE-  Rectification works at Idiyanchira Regulator

   Assistant Engineer, Irrigation Section, Enamakkal, Thrissur

17.06.2026 CM81/26-27          
89 CM103/26-27

Compressive strength of Hardened Concrete : Sathya Residency, Guruvayur -Raft beam M30 mix

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

16.06.2026 CM 103/26-27          
88 CM101/26-27

Compressive strength of Hardened Concrete : Mr.Rasheed Chungam- Retaining  wall – M30 mix 

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

16.06.2026 CM 101/26-27          
87 cm99/26-27

Tests on Steel Bars : Renovation of pond Near Othalur Lift Irrigation scheme in Kadavallur Grama Panchayath

     Assistant Engineer, Minor Irrigation Section,  Kunnamkulam

15.06.2026 CM 99/26-27          
86 Cm94/26-27

Compressive strength of Hardened Concrete : Balance Finishing work of  Vadanappilly Police Station Thrissur ,Rural

Project Engineer, KPHCC , Thrissur

15.06.2026 CM 94/26-27          
85 Cm59/26-27

Compressive strength of Concrete Paving Block : LRRP-2024-25,Irinjalakkuda LAC,SL No.3109 Aiswarya road in ward 12 Padiyur GP,Vellangallur BP,Thrissur District.

Lenscon Engineers and Contractors Private Limited, Columbo Castle, Nada Irinjalakuda,

15.06.2026 CM 59/26-27          
84 Cm100/26-27

Compressive strength of Hardened Concrete : Sathya Residency, Guruvayur -Raft Slab M30 mix

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

12.06.2026 CM 100/26-27          
83 Cm42A/26-27

Tests on Steel Bars :GENERAL-CSIND-Construction of  Lock cum Bridge in Ch 316.728 km of West Coast canal at Veliyancode in Ponnani Taluk in Malappuram District (PHASE 1 BALANCE WORK) Phase 1 Balance work-General Civil Works

          Assistant Engineer,                            Irrigation Section No.2,  Ponnani.

11.06.2026 cm42A/26-27          
82 CM98/26-27

Tests on Steel Bars :Dam safety 2024-Rectification works to Peechi dam apron-general civil works.

 

 

Assistant Engineer, Head works section,

                               Peechi.

11.06.2026 CM 98/26-27          
81 CM96/26-27

Tests on Steel Bars :Project.No.52/25-26 Pakalveedu construction ward 02

 

Assistant  Engineer,LID/ EW Section,                 Kodassery Grama Panchayath.

 

11.06.2026 CM96/26-27          
80 CM97/26-27

Compressive strength of Hardened Concrete : Sathya Residency, Guruvayur -Raft beam M30 mix

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

09.06.2026 CM 97/26-27          
79 CM95/26-27

Compressive strength of Hardened Concrete : Pro.99/24-25 Chaipankuzhy Kalaparamban Road concreting

Assistant Engineer, LID/EW Section,  Kodassery Grama Panchayath

08.06.2026 CM 95/26-27          
78 CM92/26-27

Compressive strength of Hardened Concrete :Annual Plan – 2023 -24 -Construction of School Building for Govt: Model Boys Higher Secondary School Irinjalakkuda

Assistant Engineer, PWD Buildings Section, Irinjalakkuda

08.06.2026 CM 92/26-27          
77 CM87/26-27 

Compressive strength of Hardened Concrete : GENERAL-Rectification of canals-Repair and Maintenance of Damaged Canals under Uramkulam Additional  LIS-General Civil Work.

Assistant  Engineer, Minor Irrigation Section, Kodakara.

08.06.2026 CM 87/26-27          
76 CM93/26-27 

Compressive strength of Hardened Concrete :Annual Plan – Pno  55/26 Kundan-chal renovation – Nadathara GP ward 14 Iravimangalam -Ollukkara BP- General civil Work

Assistant Engineer,  LSGD (LID & EW) Sub Division, Ollukkara Block Panchayath

06.06.2026 CM 93/26-27          
75 CM73/26-27

Interim of Mix Design:GENERAL-Scouts& Guides,Kakkayaur Construction of Dormitory & Maintenance work at Kakkayur. Koduvayur,Palakkad -General Civil Work

ASSISTANT ENGINEER, PWD BUILDINGS SECTION, NENMMARA

06.06.2026 CM 73/26-27          
74 CM75/26-27

Compressive strength of Hardened Concrete :GENERAL-Scouts& Guides, Kakkayur Construction of Dormitory & Maintenance work at Kakkayur. Koduvayur,Palakkad -General Civil Work

Assistant  Engineer, PWD Buliding Section, Nemmara

05.06.2026 CM 75/26-27          
73 CM42/26-27

Mix Design: Tests on Steel Bars :GENERAL-CSIND-Construction of  Lock cum Bridge in Ch 316.728 km of West Coast canal at Veliyancode in Ponnani Taluk in Malappuram District (PHASE 1 BALANCE WORK) Phase 1 Balance work-General Civil Works

ASSISTANT ENGINEER.IRRIGATION SECTION 2, PONNANI

03.06.2026 CM 42 /26-27          
72 CM90/26-27

Compressive strength of Concrete Paving Block : GENERAL-LRRP-LRRP 2024-25 -PUTHUKKAD LAC -SI NO :589, ALANGAD BHARATHA ROAD IN WARD 9, Thrikkur GP, Thrissur District – General Civil Work

Assistant Engineer, LSGD Section, Thrikkur Grama Panchayath.

03.06.2026 CM 90/25-26          
71 CM85/26-27

Compressive strength of Hardened Concrete : St. Augustine H.S.S, Thrissur

Sunny Joseph

01.06.2026 CM 85/26-27          
70 CM74/26-27

Compressive strength of Hardened Concrete : GENERAL-Scouts& Guides, Kakkayur Construction of Dormitory & Maintenance work at Kakkayur. Koduvayur,Palakkad -General Civil Work

Assistant  Engineer, PWD Buliding Section, Nemmara

01.06.2026 CM 74/26-27          
69 CM82/26-27

Compressive strength of Hardened Concrete : Chavakkad Municipality – Budget Work -Construction of New Office Building.

Assistant Engineer, LSGD ( LD&EW),

Chavakkad Municipality

01.06.2026 CM 82/26-27          
68 CM89/26-27

Compressive strength of Concrete Paving Block :GENERAL-LRRP-LRRP 2024-25 -PUTHUKKAD LAC -SI NO :589, ALANGAD BHARATHA ROAD IN WARD 9, Thrikkur GP, Thrissur District – General Civil Work

Assistant Engineer, LSGD Section, Thrikkur Grama Panchayath.

30.05.2026 CM 89/26-27          
67 CM83/26-27

Tests on Steel Bars : Annual Plan-DPT TSR 2024-25 ALAGAPPANAGAR GP –     PROTECTION OF KURUPPAMKULAM WARD 16 – KODAKARA BLOCK  PANCHAYATH AMBALLUR DIVISION

                            Assistant  Engineer,                 

LID & EWection, Alagappanagar

30.05.2026 CM83 /26-27          
66 CM79/26-27

Compressive strength of Hardened Concrete :Extension of Moolathara Right Bank Canal from Korayar to Varattayar (Civil works) in Eruthenpathy Panchayath, Palakkad District.

Project Manager, Prathmesh &KK (J.V),81.Tilak Nagar, Aurangabad, Maharashtra

30.05.2026 CM 79/26_27          
65 CM72/26-27

Compressive strength of Hardened Concrete : Chalakudy Block Panchayath – Annual Plan 2025 – 26 -Construction of new building in Block panchayath compound (S0126/26)

Assistant Executive Engineer, LID& EW Sub Division, Chalakkudy Block Panchayath

30.05.2026 CM 72/26-27          
64 CM76/26-27

Compressive strength of Hardened Concrete : St. Augustine H.S.S,Thrissur

Sunny Joseph

30.05.2026 CM 76/26-27          
63 CM80/26-27

Compressive strength of Concrete Paving Block : LRRP 2024- 2025 Nattika LAC SL No 2091, Velumanpady Road, Chazhur GP

Assistant Engineer, LSGD Section, Chazhur GP

30.05.2026 CM 80/26-27          
62 CM41/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 41/26-27          
61 CM40/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 40/26-27          
60 CM39/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 39/26-27          
59 CM37/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 37/26-27          
58 CM34/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 34/26-27          
57 CM33/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 33/26-27          
56 CM32/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 32/26-27          
55 CM31/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 31/26-27          
54 CM30/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 30/26-27          
53 CM29/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 29/26-27          
52 CM28/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 28/26-27          
51 CM27/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 27/26-27          
50 CM26/26-27

Compressive strength of Hardened Concrete : Navera – Regalia

M/s Navera Builders, 1st Floor, Tharappel Complex, Kodungallur-Shornur. Road, Kolazhy, Thrissr

25.05.2026 CM 26/26-27          
49 CM72/26-27

Compressive strength of Hardened Concrete : Chalakudy Block Panchayath – Annual Plan 2025 – 26 -Construction of new building in Block panchayath compound (S0126/26) 

Assistant Executive Engineer, LID& EW Sub Division, Chalakkudy Block Panchayath

23.05.2026 CM 72/26-27          
48 CM76/26-27

Compressive strength of Hardened Concrete : St. Augustine H.S.S,Thrissur

Sunny Joseph

23.05.2026 CM 76/26-27          
47 CM63/26-27

Compressive strength of Hardened Concrete : Project of  Guruvayoor Brahmana Samooham at Guruvayoor

Olivia Projects. Flat no.G1,Gayathri Apartment, Sankaramkulangara Temple Road, Punkunnam,  Thrissur

21.05.2026 CM 63/26-27          
46 CM58/26-27

Compressive strength of Hardened Concrete : 343/24-25, 2022-2023 Health Grant Scheme – 1 Vellanikkodu FWC Building Construction – General Civil Work

Assistant Engineer, LID& EW Section, Thrikkur Grama Panchayath

21.05.2026 CM 58/26-27          
45 CM68/26-27

Compressive strength of Concrete Paving Block :  MLA SDF 2025-26 Chalakudy LA Construction of St. Antony’s  road in Kadukutty GP. Agreement No. 60/25-26 dated 23.02.2026

Assistant Engineer, LSGD Sub Division, Chalakudy Block Panchayath.

20.05.2026 CM 68/26-27          
44 CM67/26-27

Compressive strength of Concrete Paving Block :  MLA SDF 2025-26 Construction of St. Antony’s Chapel road in Kadukutty GP of Chalakudy LAC. Agreement No. 57/25-26 dated 04.02.2026

Assistant Engineer, LSGD Sub Division, Chalakudy Block Panchayath.

20.05.2026 CM 67/26-27          
43 CM38/26-27

Compressive strength of Hardened Concrete : “Pro No.108/26 KAMMALAM-NAYARANGADI ROAD DRAINAGE IRISH WARD 15”.

Assistant Engineer, LID& EW Section, Kodassery Grama Panchayath

20.05.2026 CM 38/26-27          
42 CM71/26-27

Tests on Steel Bars :  Project No.55/25-26 – Kundan-chal renovation – ward 14 – Eravimangalam, Nadathara Grama Panchayath.         

                                 Assistant Engineer, LSGD (LID&EW) Sub Division,                                                  Ollukkara Block Panchayath.

20.05.2026 CM71/26-27          
41 CM62/26-27

Compressive strength of Hardened Concrete : Chavakkad Municipality – Budget Work -Construction of New Office Building

Assistant Engineer, LSGD ( LD&EW), Chavakkad Municipality

19.05.2026 CM 62/26-27          
40 CM61/26-27

Compressive strength & Density of Hardened Concrete : Construction of ST. MARY’S CHRUCH, Ayyanthole

ST. MARY’S ASSUMPTION CHURCH, Ayyanthole, Thrissur

19.05.2026 CM61/26-27          
39 CM64/26-27

Tests on Concrete Paving Block: Compressive Strength test of Paving Block

Arun T, Akshaya House, Viyyur, Thrissur

18.05.2026 CM 64/26-27          
38 CM60/26-27

Tests on Concrete Paving Block: Compressive Strength test of Paving Block

Arun T, Akshaya House, Viyyur, Thrissur

18.05.2026 CM 60/26-27          
37 CM04/26-27

Pile Integrity Test: “RIDF XXIX-CSIND – Construction of Lock cum Bridge in Ch. 329.756 km of West Coast canal at Tirur Ponnanipuzha near Koottayi RCB, Mangalam Grama Panchayath in Malappuram District”.

Assistant Engineer, Irrigation Section, Koottayi

18.05.2026 CM04/26-27          
36 CM51/26-27

Tests on Steel Bars :   Thottumukham LIS-Canal Maintenance of Thottumugham LIS in .      Varandarappilly Panchayath-General Civil Work

Assistant Engineer, Minor Irrigation Section, Kodakara

14.05.2026 CM51/26-27          
35 CM45/26-27

Compressive strength of Hardened Concrete : “Pro. No.149/26 – KUTTICHIRA-MARAM KODE CANAL BUND ROAD RETARRING WARD 12”

Assistant Engineer, LID& EW Section, Kodassery Grama Panchayath

14.05.2026 CM 45/26-27          
34 CM55/26-27

Compressive strength of Hardened Concrete : LRRP 2024-25 CHALAKUDY LAC NO-2480 Chaipankuzhy Chembankunnu Ponnambiyoli Road Kodassery GP-CHALAKUDY BP.

Assistant Engineer, LID& EW Section, Kodassery Grama Panchayath

13.05.2026 CM 55/26-27          
33 CM53/26-27

Compressive strength of Hardened Concrete : Sathya Residency, Guruvayur – Tank Wall

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

13.05.2026 CM 53/26-27          
32 CM52/26-27

Compressive strength of Hardened Concrete :  Sathya Residency, Guruvayur -Tank Raft Slab

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

13.05.2026 CM 52/26-27          
31 CM20/26-27

Test on Fencing materials: Erecting Five line solar Fence  around Njalloor to Chengara 2.7 km of NKFS in Konni Range during 2025-26

 

Range Officer, Konni Range, Konni Division.

11.05.2026 CM 20/2026-2          
30 CM19/26-27

Test on Fencing materials:Erecting Five line solar Fence around Kummannoor Mathaimuruppu- Medical college 2.5 km of SKFS in Konni Range during 2025-26

Range Officer,Konni Range, Konni Division.

 

11.05.2026 CM 19/2026-27          
29 CM49/26-27

Test on Fencing materials: Erecting Five line solar Fence In Pazhavunniyaattinpuram- Pankavu in Special Duty Section of ABP Range, Kottoor during 2025-26

Deputy Warden, ABP Range, Kottoor Range

11.05.2026 CM 49/2026-27          
28 CM44/26-27

Compressive strength of Hardened Concrete :Higher Education Department -Technical Education-Annual Plan 2023-24-Construction activities in respect of various Government Polytechnic Colleges- Construction of New Academic Block of Govt.Polytechnic College Koratty.

Assistant Engineer, PWD Buildings Section, Chalakudy

11.05.2026 CM 44/26-27          
27 CM43/26-27

Compressive strength of Hardened Concrete :Villa atAngamaly

Olivia Projects.Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

11.05.2026 CM 43/26-27          
26 CM48/26-27

 Compressive strength of Hardened Concrete : 343/24-25, 2022-2023 Health Grant Scheme – 1 Vellanikkodu FWC Building  Construction – General Civil Work

Assistant Engineer, LID& EW Section, Thrikkur Grama Panchayath

07.05.2026 CM 48/26-27          
25 CM35/26-27

Tests on Steel Bars : PIU-Idukki-KR 03-132B, Purathekkadavu Bridge

                  Executive Engineer,                             Programme Implementation Unit,        District Panchayath, Idukki.

 

06.05.2026 CM35/26-27          
24 CM25/26-27

Compressive strength of Hardened Concrete : SUPPLYING AND INSTALLATION OF AUTOMATED HEATING SYSTEM BIOGAS TO CNG CONVERTER PLANT 25 TPD

Assistant Engineer Project Wing, LSGD, Thrissur Corporation

04.05.2026 CM 25/26-27          
23 CM24/26-27

Compressive strength of Hardened Concrete : SUPPLYING AND INSTALLATION OF AUTOMATED HEATING SYSTEM BIOGAS TO CNG CONVERTER PLANT 25 TPD

Assistant Engineer Project Wing, LSGD, Thrissur Corporation

04.05.2026 CM 24/26-27          
22 CM23/26-27

Compressive strength of Hardened Concrete : SUPPLYING AND INSTALLATION OF AUTOMATED HEATING SYSTEM BIOGAS TO CNG CONVERTER PLANT 25 TPD

Assistant Engineer Project Wing, LSGD, Thrissur Corporation

04.05.2026 CM 23/26-27          
21 CM17/26-27

Compressive strength of Concrete Core : Urgent reconstruction of damaged culvert @ch.2/300 of Kuzhuchira Nadavarambu road in Kodungallur LAC.

                       Assistant Engineer,                                  PWD Roads Section, Mala     

06.05.2026 CM17/26-27          
20 CM22/26-27

Compressive strength of Hardened Concrete : Annual Plan – Pno  55/26 Kundan-chal renovation – Nadathara GP ward 14 Iravimangalam -Ollukkara BP- General civil Work

Assistant Engineer,  LSGD (LID & EW) Sub Division, Ollukkara

27.04.2026 CM 22/26-27          
19 CM21/26-27

Compressive strength of Hardened Concrete : Annual Plan – DPT-TSR-2025-26- NADATHARA GP -CONSTRUCTION OF KUNDANCHAAL – PEECHI DIVISION – OLLUKKARA BP (PRO NO.S0450/26) – IN OLLUKKARA BP – General Civil Work

Assistant Engineer, LID & EW Section, Nadathara

27.04.2026 CM 21/26-27          
18 CM36/26-27

Compressive strength of Hardened Concrete : PRO NO:156/26-2025-26 Thrissur Corporation OLK Zonal Div 17 Vettikkal – Thottappadi-Aarramkkallu Vattakkallu road inter lock tile and hand rail fixing.

Assistant Engineer, Ollukkara Zonal Office, Thrissur Corporation.

25.04.2026 CM 36/26-27          
17 CM18/26-27

Compressive strength  Density of Hardened Concrete : Construction of  Office Building -ACERO

ACERO  Structural Engineers Pvt Ltd, Green Park Avenue , Thrissur -680003

21.04.2026 CM18/25_26          
16 CM16/26-27

Test on Steel Bars :Interlinking of Bharathapuzha and Biyyam lake in Ponnani Taluk           MalappuramDistrict

Assiatant  Engineer, Irrigation Section , Ponnani

22.04.2026 CM16/26-27          
15 CM10/26-27

Compressive strength of Hardened Concrete : Extension of Moolathara Right Bank Canal from Korayar to Varattayar (Civil works) in Eruthenpathy  Panchayath, Palakkad District.

Project Manager, Prathmesh &KK (J.V),81.Tilak Nagar, Aurangabad, Maharashtra

20.04.2026 CM 10/26-27          
14 CM03/26-27

Report of the Test on Steel Bars : Chavakkad Municipality – Budget Work -Construction of New Office Building

Assistant  Executive Engineer, Chavakkad Municipality

18.04.2026 CM 03/26-27          
13 CM14/26-27

Compressive strength of Hardened Concrete :  LAC-ADS-LAC-ADC-2023-2024 Construction of New Building For PHC Ollukkara- New building. – General Civil Work

Assistant  Engineer, PWD Buliding Section No.1, Thrissur

18.04.2026 CM 14/26-27          
12 CM12/26-27

Report of the Test on Steel Bars : GENERAL-Scouts & Guides,Kakkayur Construction of Dormitory & Maintenance work at Kakkayur. Koduvayur,Palakkad -General Civil Work

Assistant  Engineer, PWD Buliding Section , Nemmara

18.04.2026 CM 12 /26-27          
11 CM15/26-27

Compressive strength of Hardened Concrete :  Annual Plan – 2023 -24 -Construction of School Building for Govt: Model Boys Higher Secondary School Irinjalakkuda

Assistant  Engineer, PWD Bulidings Section, Irinjalakkuda

18.04.2026 CM 15/26-27          
10 CM08/26-27

The compressive strength   of concrete cubes: Villa at Angamaly

Olivia Projects. Flat  no.G1,Gayathri Apartment,Sankaramkulangara Temple Road,Punkunnam ,  Thrissur

17.04.2026 CM 08/26-27          
09 CM13/26-27

The compressive strength & Density  of concrete cubes:  Construction of  ST. MARY’S Church, Ayyanthole

ST. MARY’S ASSUMPTION CHURCH, Ayyanthole, Thrissur

17.04.2026 CM13/26_27          
08 CM11/26-27

The compressive strength & Density  of concrete cubes: GENERAL-Scouts & Guides, Kakkayur Construction of Dormitory & Maintenance work at Kakkayur. Koduvayur, Palakkad -General Civil Work

Assistant  Engineer, PWD Buliding Section, Nemmara

17.04.2026 CM 11/26-27          
07 CM09/26-27

The compressive strength of concrete cubes:MLA- SDF -Construction of Love shore road in Ward 17

Assistant Engineer, LID& EW Section, Nadathara

17.04.2026 CM 09/26-27          
06 CM07/26-27

The compressive strength of concrete cubes:Budget 2025-26 Construction of Eriyad Grama Panchayath Building – New Building

Assistant Engineer, PWD Building Section, Kodungallur

17.04.2026 CM 07/26-27          
05 CM06/26-27

The compressive strength of concrete cubes:Budget 2025-26 Construction of Eriyad Grama Panchayath Building – New Building.

Assistant Engineer, PWD Building Section, Kodungallur

17.04.2026 CM 06/26-27          
04 CM05/26-27

The compressive strength of concrete cubes:General MLA -ADS-2024-25 Kodungallur LAC Construction of new building and   entrance gateway for Ramavilasam Govt.L.P.School, Kuruvilassery in Mala Panchayath 

Assistant Engineer, PWD Buildings Section, Chalakudy

17.04.2026 CM 05/26-27          
03 CM01/26-27

The compressive strength of concrete cubes:343/24-25, 2022-2023 Health Grant Scheme – 1 Vellanikkodu FWC Building Construction – General Civil Work

Assistant Engineer, LID& EW Section, Trikkur Grama Panchayath

17.04.2026 CM 01/26-27          
02 CM02/26-27

Report of the Test on Steel Bars :CSS-CADWM-2020-21- MVIP- CADA – Deepning and side protection on natural thoduincluding  preventive  measures for water logging in NeelaithazhamPadashekaram – General civil work

Assistant  Engineer, MVIP Section no.1/9, Ramamangalam

17.04.2026 CM02/26-27          
01 CM10/26-27

Compressive strength of Hardened Concrete :  Extension of Moolathara Right Bank Canal from Korayar to Varattayar(Civil works) in Eruthenpathy Panchayath, Palakkad District.

Project Manager,Prathemesh & KK,81.Tilak Nagar,Aurangabad.

16.04.2026 CM 10/26_27