| TEST REPORTS 2025-26 (Old) | |||||
| Sl. No. | Report No. | Test Description | Customer | Date of issue | Download |
|
330 |
CM432/25-26 | Compressive strength of Concrete Core: LRRP-2024-25 Nemmara LAC Sl no 1862 Kodukupara Seetharkund road in Kollengode Grama Panchayath |
Assistant Engineer, LSGD Section,Kollengode Grama Panchayath |
19.11.2025 | CM432/2025-26 |
|
329 |
CM383/25-26 | Compressive strength of Hardened Concrete :MLA-ADS-Pattanchery Grama Panchayath Office – Construction of an office Building for Pattanchery Grama Panchayath -Phase 1. |
The Assistant Engineer, PWD Buildings Section, Nenmara |
18.11.2025 | CM 383/25_26 |
|
328 |
CM367/25-26 | Compressive strength of Hardened Concrete :General Education Department – Annual plan 2023-24 Construction of school building for Govt. Fisheries LP School, Vekkode, Kodungallur, Thrissur.– First Floor Slab Concrete |
Assistant Engineer, PWD Buildings Section, Kodungallur |
18.11.2025 | CM 367/25_26 |
|
327 |
CM366/25-26 | Compressive strength of Hardened Concrete :General Education Department – Annual plan 2023-24 Construction of school building for Govt. Fisheries LP School, Vekkode, Kodungallur, Thrissur.– First Floor Column Concrete |
Assistant Engineer, PWD Buildings Section, Kodungallur |
18.11.2025 | CM 366/25_26 |
|
326 |
CM365/25-26 | Compressive strength of Hardened Concrete :Annual plan 2023-24 Construction of school building for Govt.UP School Vellikulangara, Thrissur-General civil works – F.F Column Concreting. |
Assistant Engineer, PWD Buildings Section, Chalakudy |
18.11.2025 | CM 365/25_26 |
|
325 |
CM364/25-26 | Compressive strength of Hardened Concrete :Annual plan 2023-24 Construction of school building for Govt.UP School Vellikulangara, Thrissur-General civil works – Roof Slab Concreting. |
Assistant Engineer, PWD Buildings Section, Chalakudy |
18.11.2025 | CM 364/25_26 |
|
324 |
CM409/25-26 | Compressive strength of Hardened Concrete :General- Annual Maintenance ofvarious LIS under MI Section Kodakara 2024-2025 – Maintenance of canals – General civil work.- Minor Irrigation Section, Kodakara |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
18.11.2025 | CM 409/25-26 |
|
323 |
CM434/25-26 | Compressive strength of Hardened Concrete :Construction of Check dam cum bridge at Karichalkadavu in Kattakambal Grama Panchayath. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
18.11.2025 | CM 434/25-26 |
|
322 |
CM289/25-26 | Mix Design – Report of the Concrete Mix Design -M30 (Dalmia DSP) Carried out for the Assistant Engineer, Irrigation Section No.2, Ponnani. |
ASSISTANT ENGINEER.IRRIGATION SECTION-2, PONNANI |
18.11.2025 | CM289/25-26 |
|
321 |
CM288/25-26 | Mix Design – Report of the Concrete Mix Design -M25 (Dalmia DSP) Carried out for the Assistant Engineer, Irrigation Section No.2, Ponnani. |
ASSISTANT ENGINEER.IRRIGATION SECTION-2, PONNANI |
18.11.2025 | CM288/25-26 |
|
320 |
CM287/25-26 | Mix Design – Report of the Concrete Mix Design -M20 (Dalmia DSP) Carried out for the Assistant Engineer, Irrigation Section No.2, Ponnani. |
ASSISTANT ENGINEER.IRRIGATION SECTION-2, PONNANI |
18.11.2025 | CM287/2025-26 |
|
319 |
CM349/25-26 | Test on Steel Bars:: General – Reconstruction of Compound wall of Thrissur Civil station compound, Civil lane, Ayyanthole, Thrissur – Urgent repairs and maintenance of compound wall at Civil station, Civil Lane, Ayyanthole, Thrissur – General civil work |
Assistant Engineer,PWD Building Section, Ayyanthole. |
15.11.2025 | CM349/2025-26 |
|
318 |
CM410/25-26 | Compressive strength of Hardened Concrete :Construction of Check dam cum bridge at Karichalkadavu in Kattakambal Grama Panchayth. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
15.11.2025 | CM 410/25-26 |
|
317 |
CM387/25-26 | Test on Steel liner: RIDF XXIX- CSIND-Construction of a Lock cum Bridge at ch:329.756 km of West Coast Canal near Koottayi RCB in Tirur-Ponnanipuzha in Mangalam Grama Panchayath,Malapurram District-Testing of liner sheet. |
Assistant Engineer, Irrigation Section, Koottayi.
|
15.11.2025 | CM387/2025-26 |
|
316 |
CM348/25-26 | Compressive strength of Hardened Concrete : Kalyan Infinity,Kalyan Developers,Thrissur. |
Project Manager, Kalyan Developers,Thrissur. |
15.11.2025 | CM 348/25-26 |
|
315 |
CM347/25-26 | Compressive strength of Hardened Concrete :Kalyan Infinity,Kalyan Developers,Thrissur. |
Project Manager, Kalyan Developers,Thrissur. |
15.11.2025 | CM 347/25-26 |
|
314 |
CM413/25-26 | Compressive strength of Hardened Concrete :LRRP-2024-25-Ollur LAC-2202-Chocherikunnu Ambalam Road,Puthur GP,Ollukkara BP Thrissur – LRRP General Civil Work. |
Assistant Engineer, LSGD Section, Puthur Grama Panchayath. |
15.11.2025 | CM 413/25-26 |
|
313 |
CM390/25-26 | Test on Steel Bars:LAC-ADC- 2023-2024 Construction of New Building for PHC Ollukkara. |
Assistant Engineer, Buildings Section No.1, Public Works Department, Chembukavu,Thrissur. |
15.11.2025 | CM 390/25-26 |
|
312 |
CM408/25-26 | Compressive strength of Hardened Concrete :Construction Work of House at Kuriachira. |
JEE & LEE Builders, Akash Home, Kattunkalchira, Irinjalakuda. |
15.11.2025 | CM 408/25-26 |
|
311 |
CM407/25-26 | Compressive strength of Hardened Concrete :Construction Work of House at Kuriachira. |
JEE & LEE Builders, Akash Home, Kattunkalchira, Irinjalakuda. |
15.11.2025 | CM 407/25-26 |
|
310 |
CM400/25-26 | Test on Fencing Materials : Installation of Solar hanging Fencing from Kanakamala to maramkode (8 km) under Mupliyam Forest Station Vellikulangara Range, Chalakudy Forest Division |
Range Forest Officer,Vellikulangara Range, Chalakudy Forest Division. |
15.11.2025 | CM 400/25-26 |
|
309 |
CM406/25-26 | Test on Fencing Materials :
Assessing the quality of materials supplied for the maintenance work of Solar Fencings under Olavakkode Range, Palakkad Forest Division |
Range Forest Officer, Olavakkode Range. |
12.11.2025 | CM 406/25-26 |
|
308 |
CM396/25-26 | Compressive strength of Hardened Concrete : LRRP-2024-25-OLLUR LAC-SL NO 34-Akkarappuram Chira Road-Ward -15 -Madakkathara GP- Thrissur-Concrete Road & Drain Construction. |
Assistant Engineer, LSGD Section, Madakkathara Grama Panchayath. |
12.11.2025 | CM 396/25-26 |
|
307 |
CM405/25-26 | Compressive strength of Hardened Concrete : Nil | P.N.Towers, Thalore,Thrissur. | 12.11.2025 | CM 405_25-26 |
| 306 | CM404/25-26 |
Compressive strength of Hardened Concrete : Nil |
P.N.Towers, Thalore,Thrissur. |
12.11.2025 |
CM 404/25-26 |
| 305 | CM403/25-26 |
Compressive strength of Hardened Concrete : Nil |
P.N.Towers, Thalore,Thrissur. |
12.11.2025 |
CM 403/25-26 |
| 304 | CM382/25-26 |
Compressive strength of Hardened Concrete :GENERAL – Maintenance of canal under various LIS in Annamanada and Kuzhur Panchayath – Rectification works to branch canal near Kochukadavu LIS in Kuzhur Panchayaath – Minor Irrigation Section, Mala. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
11.11.2025 |
CM 382/25-26 |
| 303 | CM381/25-26 |
Compressive strength of Hardened Concrete :GENERAL – Maintenance of canal under various LIS in Annamanada and Kuzhur Panchayath – Rectification works to branch canal near Kochukadavu LIS in Kuzhur Panchayaath – Minor Irrigation Section, Mala. |
Assistant Engineer, Irrigation Quality Control Section, Thrissur. |
11.11.2025 |
CM 381/25-26 |
| 302 | CM184/25-26 |
Compressive strength of Hardened Concrete : Construction of new class room- Construction of new building – Technical High School, Chittoor. |
Assistant Engineer, PWD Building Section,Chittoor-Thathamangalam Section, Chittoor-678102. |
11.11.2025 |
CM184/25_26 |
| 301 | CM389/25-26 |
Test on Fencing Materials : Construction of Hanging Solar Wire Fencing at Pooyamkutty Forest Station, from Pooyamkutty thandu to Koovapara Thandu. |
Chittoor-Thathamangalam Section, Chittoor-678102. |
10.11.2025 |
CM389/25-26 |
| 300 | CM388/25-26 |
Test on Fencing Materials : Construction of Hanging Solar Wire Fencing at Pooyamkutty Forest Station from Medicine Plantation to Kuthiramudi |
Range Forest Officer, Kuttampuzha Range, Malayattoor Division |
10.11.2025 |
CM388/25-26 |
| 299 | CM392/25-26 |
Compressive strength of Hardened Concrete :Annual Plan 2025-26 Puthur Grama Panchayath ward 22 Pulari Nagar Road – Pro no. 192/PTR/ General civil work. |
Assistant Engineer, LSGD Section, Puthur Grama Panchayath. |
07.11.2025 |
CM 392/25-26 |
| 298 | CM391/25-26 |
Compressive strength of Hardened Concrete :Annual Plan 2025-26 Puthur Grama Panchayath ward 19 Dhurga street first Road – Pro no. 237/PTR/ General civil work. |
Assistant Engineer, LSGD Section, Puthur Grama Panchayath. |
07.11.2025 |
CM 391/25-26 |
| 297 | CM384/25-26 |
Compressive strength of Hardened Concrete : Scheme for Special Assistance to States for Capital Investment 2023-2024-Construction of Quarters (LSQ 8 nos) at Thrissur Town East. |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd, Thrissur. |
07.11.2025 |
CM 384/25-26 |
| 296 | CM373/25-26 |
Test on Fencing Materials:Assessing the quality of materials in the work for construction of Physical Barrier Mitigating Man Animal conflict under HRC Solar Hanging Fencing (18.00 km) at Vettukadu Kundakkadu Vannanthura Area in Kanthalloor Range,Idukki (Marayoor Division) and Solar Hanging Fencing (14.00 km) at Karimutti-Puravayal in Kathalloor Range,Idukki (Marayoor Division). |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd, Kottayam. |
07.11.2025 |
CM 373/2025-26 |
| 295 | CM379/25-26 |
Compressive strength of Hardened Concrete : Happy Nagar Road Maintenance |
Assistant Engineer, LID & EW Section, Nadathara |
06.11.2025 |
CM 379/25-26 |
| 294 | CM378/25-26 |
Compressive strength of Hardened Concrete :Providing facilities to avoid water logging in PHC Road Ward 9 |
Assistant Engineer, LID & EW Section, Nadathara |
06.11.2025 |
CM 378/25-26 |
| 293 | CM377/25-26 |
Compressive strength of Hardened Concrete : Avoid water logging in Thalikundu Ambilikundu Road Ward 8. |
Assistant Engineer, LID & EW Section, Nadathara |
06.11.2025 |
CM 377/25-26 |
| 292 | CM376/25-26 |
Compressive strength of Hardened Concrete : Facilities to avoid water logging in Asan Nagar Road Ward 2. |
Assistant Engineer, LID & EW Section, Nadathara |
06.11.2025 |
cm 376/25-26 |
| 291 | CM357/25-26 |
Compressive strength of Paving Blocks:Pro.No. 95/25-26 Road Street 13 Construction ward 16 |
Assistant Engineer, LSGD Section, Nadathara G.P. |
05.11.2025 |
CM357/25-26 |
| 290 | CM375/25-26 |
Compressive strength of Hardened Concrete : Annual Plan -2024-25 Puthur Grama Panchayath Ward 6 -Urullankunu Chemanammukku Road Construction-Pro.385/PTR/-General Civil Work. |
Assistant Engineer, LSGD Section, Puthur Grama Panchayath. |
05.11.25 |
CM 375/25-26 |
| 289 | CM374/25-26 |
Compressive strength of Hardened Concrete : Nil |
P.N.Tower,Thalore,Thrissur. |
01.11.2025 |
CM 374/25-26 |
| 288 | CM323/25-26 |
Compressive strength of Hardened Concrete : STP Work RCC – Guruvayur Brahmana Samooham at Guruvayur |
M/s Olivia Projects |
31.10.2025 |
CM 323/25-26 |
| 287 | CM372/25-26 |
Compressive strength of Hardened Concrete :Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District.- M25-Gantry 5+460 to 5+470. |
Project Manager, PRATHMESH & KK (J.V) |
30.10.25 |
CM 372/25-26 |
| 286 | CM371/25-26 |
Compressive strength of Hardened Concrete :Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District.- P22-P23 Super structure Wall & Tie beam. |
Project Manager, PRATHMESH & KK (J.V) |
30.10.25 |
CM 371/25-26 |
| 285 | CM356/25-26 |
Compressive strength of Paving Blocks:Pro.No.18/25-26 Akshaya Ikyam Nagar Tile Paving ward 1 |
81.Tilak Nagar, Aurangabad, Maharashtra |
30.10.25 |
CM356/25-26 |
| 284 | CM355/25-26 |
Compressive strength of Paving Blocks: Pro.No.32/25-26 Santhi Nagar Tile Paving ward 3. |
Assistant Engineer, LSGD Section, Nadathara Gramapanchayath |
30.10.25 |
CM355/25-26 |
| 283 | CM354/25-26 |
Compressive strength of Hardened Concrete : Nadathara GP-304/24-25 Electrification and compound wall at Kottala anganvadi ward-5. |
Assistant Engineer, LSGD Section, Nadathara Gramapanchayath |
29.10.2025 |
CM 354/25-26 |
| 282 | CM290/25-26 |
Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, Irrigation Section No.2, Ponnani |
Assistant Engineer, Irrigation Section No.2, Ponnani. |
28.10.2025 |
CM290/25-26 |
| 281 | CM289/25-26 |
Mix Design – Interim Report of the Concrete Mix Design -M30 (Dalmia DSP) Carried out for the Assistant Engineer, Irrigation Section No.2, Ponnani. |
Assistant Engineer, Irrigation Section No.2, Ponnani. |
28.10.2025 |
CM289/25-26 |
| 280 | CM288/25-26 |
Mix Design – Interim Report of the Concrete Mix Design -M25 (Dalmia DSP) Carried out for the Assistant Engineer, Irrigation Section No.2, Ponnani. |
Assistant Engineer, Irrigation Section No.2, Ponnani. |
28.10.2025 |
CM288/25-26 |
| 279 | CM287/25-26 |
Mix Design – Interim Report of the Concrete Mix Design -M20 (Dalmia DSP) Carried out for the Assistant Engineer, Irrigation Section No.2, Ponnani. |
Assistant Engineer, Irrigation Section No.2, Ponnani. |
28.10.2025 |
CM287/25-26 |
| 278 | CM325/25-26 |
Test on Fencing Materials: Solar Fencing work at Adukuzhy teak plantation under Vadasserikkara Range, Ranni Division. |
Range Forest Officer, Vadasserikkara Range, Pathanamthitta. |
28.10.2025 |
CM325/25-26 |
| 277 | CM326/25-26 |
Compressive strength of Hardened Concrete : Construction of New Septic Tank at New Quarter Guard Building, Kerala Police Academy, Thrissur. |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd, Thrissur. |
28.10.2025 |
CM 326/25-26 |
| 276 | CM336/25-26 |
Compressive strength of Paving Blocks:Avinissery Gramapanchayath – Avinissery Gramapanchayath 2025-26-P.No.106/26 Construction of Devamatha Road in ward 1(Agreement No.7/AE/LSGD/AVY/2025-26 dtd 06.10.25 with Contractor –Ajaykumar K.) |
Assistant Engineer, LID & EW Section Avinissery Panchayath. |
28.10.25 |
CM336/25-26 |
| 275 | CM335/25-26 |
Compressive strength of Paving Blocks:Pro.No.34/25-26 Ayyappankkavu Grace road construction ward 4 |
Assistant Engineer, LSGD Section, Nadathara. |
28.10.25 |
CM335/25-26 |
| 274 | CM334/25-26 |
Compressive strength of Paving Blocks:Pro.No.24/25-26 Athani Moola Bylane Road Tile Paving ward 3 |
Assistant Engineer, LSGD Section, Nadathara. |
28.10.25 |
CM334/25-26 |
| 273 | CM333/25-26 |
Compressive strength of Paving Blocks: Pro.No.45/25-26 Cheriparambu Bylane,Tile paving ward 9 |
Assistant Engineer, LSGD Section, Nadathara. |
28.10.25 |
CM333/25-26 |
| 272 | CM332/25-26 |
Compressive strength of Paving Blocks:Pro.No.94/25-26 Pattathil Road Construction ward 16 |
Assistant Engineer, LSGD Section, Nadathara. |
28.10.25 |
CM332/25-26 |
| 271 | CM331/25-26 |
Compressive strength of Paving Blocks:Pro.No.89/25-26 Eravimangalam Grace road tile paving ward 16 |
The Assistant Engineer, LSGD Section, Nadathara Gramapanchayath. |
28.10.25 |
CM331/25-26 |
| 270 | CM351/25-26 |
Compressive strength & Density of Hardened Concrete : Construction work of ST:Marys church,Ayyanthole |
ST. MARY’S ASSUMPTION CHURCH, Ayyanthole, Thrissur |
28.10.25 |
CM351/25_26 |
| 269 | CM330/25-26 |
Compressive strength of Hardened Concrete :Construction of MCF (Pro.No.246/25) |
The Assistant Engineer, LID & EW Section, Avinissery Gramapanchayath. |
28.10.25 |
CM 330/25-26 |
| 268 | CM313/25-26 |
Compressive strength of Paving Blocks: LRRP-2024-25, Irinjalakuda LAC, SI.No:3109 Aiswarya road in ward 12 Padiyur GP, Vellangallur BP, Thrissur District.
|
The Assistant Engineer, LID & EW Section, Padiyur Gramapanchayath. |
27.10.2025 |
CM313/25-26 |
| 267 | CM319/25-26 |
Compressive strength of Hardened Concrete Core :General – PSM- 2023-24 Improvement works to RBMC between Ch.12/300 and 12/400 km. |
Assistant Engineer, Peechi Project Section, Thanipadam. |
27.10.25 |
CM 319/25-26 |
| 266 | CM340/25-26 |
Compressive strength of Hardened Concrete: Annual Plan-2024-25 Puthur Grama Panchayath Ward-17 Souparnika street Construction-Pro no.472/PTR/-General Civil Work. |
Assistant Engineer, LSGD Section, Puthur |
23.10.2025 |
CM 340/25-26 |
| 265 | CM339/25-26 |
Compressive strength of Hardened Concrete: Annual Plan-Annual Plan-2024-25 Puthur Grama Panchayath Ward-5 Viyani palli TMG road concreting-pro no: 102/PTR/-General Civil Work. |
Assistant Engineer, LSGD Section, Puthur |
23.10.2025 |
CM 339/25-26 |
| 264 | CM322/25-26 |
Compressive strength of Hardened Concrete:Kalyan Infinity: 14 th Roof Slab |
Project Manager Kalyan Infinity,Kalyan Developers,Thrissur. |
23.10.2025 |
CM 322/25-26 |
| 263 | CM321/25-26 |
Compressive strength of Hardened Concrete: Kalyan Infinity: 14 th Roof Slab |
Project Manager Kalyan Infinity,Kalyan Developers,Thrissur. |
23.10.2025 |
CM 321/25-26 |
| 262 | CM341/25-26 |
Compressive strength of Hardened Concrete: Construction of Third floor and fourth floor including horizontal expansion portion in all floors of Chemo Day care Centre at Medical College Chest Hospital. |
The Assistant Engineer, PWD Special Buildings Section, MG Kavu, Thrissur. |
22.10.25 |
CM 341/25_26 |
| 261 | CM278A/25-26 |
The AbrasionResistance of Concrete Paving Blocks: NICE PETROLEUM EDAPPAL |
Manager (Engineering), HPCL, Kozhikode |
22.10.25 |
CM278A /2025-26 |
| 260 | CM278/25-26 |
Compressive strength & Water Absorption of ConcretePaving Blocks: NICE PETROLEUM EDAPPAL |
Manager (Engineering), HPCL, Kozhikode |
22.10.25 |
CM278/25-26 |
| 259 | CM320/25-26 |
Compressive strength of Hardened Concrete: MLA-ADS-Pattanchery Grama Panchayath Office – Construction of an office Building for Pattanchery Grama Panchayath -Phase 1. |
The Assistant Engineer,PWD Buildings Section, Nenmara. |
22.10.25 |
CM 320/25_26 |
| 258 | CM317/25-26 |
Compressive strength of Hardened Concrete:Repair works to main road connecting Peechi dam and KERI |
Assistant Engineer, Head Works Section, Peechi. |
22.10.25 |
CM 317/25-26 |
| 257 | CM327/25-26 |
Compressive strength of Hardened Concrete:Non Plan Road Work 2020-21 Providing BC overlay to Thrissur Thalore road ch:2/500 to 9/700 in Ollur LAC-General civil work. |
Assistant Engineer, PWD Roads Town Section, Thrissur-20 |
22.10.25 |
CM 327/25-26 |
| 256 | CM316/25-26 |
Compressive strength of Hardened Concrete: LRRP-OLLUR LAC-2024-25-196-KALLAYI IRUMBANADU ROAD WARD 15-MADAKKATHARA GP. |
Assistant Engineer, LSGD Section, Madakkathara G P. |
22.10.2025
|
CM 316/25-26 |
| 255 | CM315/25-26 |
Compressive strength of Hardened Concrete: No.1 LRRP-LRRP-2024-25-OLLUR LAC-62-KARGIL ROAD IN WARD 2 – MADAKKATHARA GP- OLUKKARA BP- THRISSUR. |
Assistant Engineer, LSGD Section, Madakkathara G P. |
22.10.2025 |
CM 315/25-26 |
| 254 | CM199/25-26 |
Compressive strength of Hardened Concrete:Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM199/25_26 |
| 253 | CM198/25-26 |
Compressive strength of Hardened Concrete:Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM198/25_26 |
| 252 | CM190/25-26 |
Compressive strength of Hardened Concrete:Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM190/25_26 |
| 251 | CM189/25-26 |
Compressive strength of Hardened Concrete:Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM189/25_26 |
| 250 | CM188/25-26 |
Compressive strength of Hardened Concrete:Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM188/25_26 |
| 249 | CM187/25-26 |
Compressive strength of Hardened Concrete: Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM187/25_26 |
| 248 | CM181/25-26 |
Compressive strength of Hardened Concrete: Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM181/25_26 |
| 247 | CM180/25-26 |
Compressive strength of Hardened Concrete: Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM180/25_26 |
| 246 | CM183/25-26 |
Compressive strength of Hardened Concrete: Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM183/25_26 |
| 245 | CM182/25-26 |
Compressive strength of Hardened Concrete: Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM182/25_26 |
| 244 | CM168/25-26 |
Compressive strength of Hardened Concrete: Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM168/25_26 |
| 243 | CM167/25-26 |
Compressive strength of Hardened Concrete: Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM167/25_26 |
| 242 | CM166/25-26 |
Compressive strength of Hardened Concrete: Project- Navera Regalia |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM166/25_26 |
| 241 | CM147/25-26 |
Compressive strength of Hardened Concrete:Project- Navera Taneira |
M/s Navera Builders,1st Floor, Tharappel Complex, Kodungallur-Shornur Road, Kolazhy. |
21.10.25 |
CM 147/25-26 |
| 240 | CM277A/25-26 |
Test on Concrete Paving Block:NRO THRIKALANGODU. |
Manager (Engineering), HPCL, Kozhikode |
16.10.25 |
CM277A/2025-26 |
| 239 | CM277/25-26 |
Compressive strength of Paving Blocks:NRO THRIKALANGODU |
Manager (Engineering), HPCL, Kozhikode |
16.10.25 |
CM277/25-26 |
| 238 | CM276a/25-26 |
Test on Concrete Paving Block:NRO CHETTIPADI. |
Manager (Engineering), HPCL Kozhikode |
16.10.25 |
CM276a/ 2025-26 |
| 237 | CM276/25-26 |
Compressive strength of Paving Blocks:NRO CHETTIPADI |
Manager (Engineering), HPCL, Kozhikode |
16.10.25 |
CM276/25-26 |
| 236 | CM226/25-26 |
Mix Design Report:LAC-ADS Construction of Box culvert at Nettissery Branch Canal Ch.0/300 km |
The Assistant Engineer, Peechi Project Section, Thanipadam |
16.10.25 |
CM226/2025-26 |
| 235 | CM312/25-26 |
Test on Rubble Stone: GENERAL – Monsoon preparedness 2025-26 – Urgent dumping work to the sea coast in both sides of CP 1218 at different gaps in Edavilange grama panchayath in Kodungallur taluk |
The Assistant Engineer, Irrigation Section, Kodungallur |
16.10.25 |
CM312/25-26 |
| 234 | CM311/25-26 |
Test on Rubble Stone:Urgent protection work to sea coast using rubble mount from CP 1357 towards south near Fasal Nagar in ward 18 of Vatanappally Grama panchayath in Chavakkad Taluk |
The Assistant Engineer, Irrigation Section, Ollukkara |
16.10.25 |
CM311/2025-26 |
| 233 | CM310/25-26 |
Test on Fencing Materials: Hanging Fence work at Nelliampathi Range in Nenmara Division. |
Range Forest Officer, Nelliampathi Range |
15.10.2025 |
CM310/25-26 |
| 232 | CM309/25-26 |
Test on Fencing Materials: Construction of Physical Barrier for Mitigating Man Animal Conflict for Solar Fence work at Chemmanapathy State Boundary to Kunjuvelankadu in Kollengode Range under Nenmara Division |
Range Forest Officer, Kollengode Range |
15.10.2025 |
CM309/25-26 |
| 231 | CM305/25-26 |
Compressive strength of Hardened Concrete: LRRP-2024-25-OLLUR LAQC-SLNO 596-VIDHYA NAGAR 6TH LANE ROAD-MADAKKATHARA GP- THRISSUR – NEW ROAD CONSTRUCTION. |
Assistant Engineer, LSGD Section, Madakkathara G P |
13.10.2025 |
CM 305/25-26 |
| 230 | CM303/25-26 |
Compressive strength of Paving Blocks: R.P Work 2023-24- Providing BM patch and BC overlay to Mala Annamanada road from ch:0/000 to 0/476, ch:5/795 to 8/540 and approach road of Pulikkadavu bridge from ch:0/000 to 0/460 in Kodungallur LAC. Agreement No. 27/SECCA/2024-25 Dt. 07.10.2024. |
Assistant Engineer, PWD Roads Section, Mala |
9.10.2025 |
|
| 229 | CM304/25-26 |
Compressive strength of Hardened Concrete: 2024-2025 Companypadi Samanya Nagar Sub-Road 2 Maintenance Ward-21 Pananchery GP. |
The Assistant Engineer, LID & EW Section, Pananchery Grama Panchayath. |
8.10.2025 |
CM 304/25-26 |
| 228 | CM294/25-26 |
Compressive strength of Paving Blocks: General-MPLADS-2024-25-Providing concrete paving blocks to Chalakudy branch canal bund road from ch:3/600 km to 3/665 km and concreting the canal berm from ch:3/665 km to 3/705 km. |
The Assistant Engineer, R.B.C Section No:1,Chalakudy. |
8.10.2025 |
|
| 227 | CM293/25-26 |
Compressive strength of Paving Blocks: MP-LADS-2025-26 Interlocking of Roads in the Krishibhavan branch Road-Ward 9 of Avinissery G P in Cherpu BP.. |
Assistant Executive Engineer, LID & EW Sub division, Cherpu B.P. |
8.10.2025 |
CM293/25-26 |
| 226 | CM284/25-26 |
Tests on Steel Bars: LAC-ADS-LAC-ADC 2023-2024 Construction of New Building for PHC Ollukkara. |
The Assistant Engineer, Buildings Section No.1, PWD, Chembukavu, Thrissur.
|
8.10.2025 |
CM284/25-26 |
| 225 | CM283/25-26 |
Compressive strength of Solid Concrete Blocks: LAC-ADS-LAC-ADC 2023-2024 Construction of New Building for PHC Ollukkara. |
The Assistant Engineer, Buildings Section No.1, PWD, Chembukavu, Thrissur.
|
8.10.2025 |
CM283/25-26 |
| 224 | CM292/25-26 |
Compressive strength & Density of Hardened Concrete: Construction work of ST:Marys church,Ayyanthole |
ST:Marys Assumption church,Ayyanthole,Thrissur. |
4.10.2025 |
CM292/25_26 |
| 223 | CM291/25-26 |
Compressive strength & Density of Hardened Concrete: Construction work of ST:Marys church,Ayyanthole |
ST:Marys Assumption church,Ayyanthole,Thrissur. |
4.10.2025 |
CM291/25_26 |
| 222 | CM273/25-26 |
Compressive strength of Paving Blocks: Project No:411/2023-24 Marakkal K G Road-Ward-17 |
Assistant Engineer, LID & EW, Pananchery Grama Panchayath. |
4.10.2025 |
CM 273/25-26 |
| 221 | CM226/25-26 |
Mix Design Report – Interim Report of the Concrete Mix Design -M25 (Dalmia Composite Cement) Carried out for the Assistant Engineer, Peechi Project Section, Thanipadam. |
The Assistant Engineer, Peechi Project Section, Thanipadam. |
4.10.2025 |
CM226/25-26 |
| 220 | CM286/25-26 |
Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District.- M25-Gantry 5+320 to 5+330 |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
3.10.2025 |
CM 286/25-26 |
| 219 | CM285/25-26 |
Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District.- M35-P125-A2 Superstructure wall & Tie beam |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
3.10.2025 |
CM 285/25-26 |
| 218 | CM282/25-26 |
Test on Fencing Materials : Construction of physical Barrier for Mitigating Man Animal Conflict under HRC Solar Hanging Fencing (2.00km) at Jundapady to Ambalakadavu in Ayyappankovil Range, Idukki (Kottayam Division) and Solar Hanging Fencing (5.50 km) for around Plakkathadam Tribal Settlement and Kallar Erumeli Range (Kottayam Division). |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd, Kottayam. |
29.09.2025 |
CM282/25-26 |
| 217 | CM275/25-26 |
Compressive strength of Hardened Concrete: MLA-ADS-Pattanchery Grama Panchayath Office – Construction of an office Building for Pattanchery Grama Panchayath -Phase 1. |
The Assistant Engineer, PWD Buildings Section, Nenmara. |
27.09.2025 | CM 275/25_26 |
| 216 | CM274/25-26 |
Compressive strength of Hardened Concrete:Sewage Treatment Plant work at Hotel and convention Hall,Guruvayur Brahmana Samooham at Guruvayur. |
Olivia projects.Flat no.G1,Gayathri Apartment, Sankaramkulangara Temple Road, Punkunnam |
26.09.25 | CM 274/25_26 |
| 215 | CM269/25-26 |
Compressive strength of Hardened Concrete:Kalyan Infinity: 14 th Roof Slab and columns . |
Project Manager Kalyan Infinity,Kalyan Developers,Thrissur. |
25.09.25 | CM 269/25_26 |
| 214 | CM226/25-26 |
Mix Design –Interim Report of the Concrete Mix Design -M25 (Dalmia composite cement) Carried out for the Assistant Engineer, Peechi Project section,Thanipadam. |
The Assistant Engineer, Peechi Project section,Thanipadam. |
25.09.25 | Intrim cm 226/25-26 |
| 213 | CM268/25-26 |
Compressive strength of Hardened Concrete:Kalyan Infinity: 14 th Roof Slab and columns . |
Project Manager Kalyan Infinity,Kalyan Developers,Thrissur. |
25.09.2025 | CM 268/25_26 |
| 212 | CM267/25-26 |
Compressive strength of Hardened Concrete:Kalyan Infinity: 13 th RCC Slab, beam and columns (Apartments C & D) |
Project Manager Kalyan Infinity,Kalyan Developers,Thrissur. |
25.09.25 | CM 267/25_26 |
| 211 | CM266/25-26 |
Compressive strength of Hardened Concrete:Kalyan Infinity: 13 th RCC Slab, beam and columns (Apartments C & D) |
Project Manager Kalyan Infinity,Kalyan Developers,Thrissur. |
25.09.25 | CM 266/25_26 |
| 210 | CM265/25-26 |
Test on Interlock Tile : Pro.No.42/25-26 Rachana Nagar Road Bylane 2 Tile Paving Ward 9 |
Assistant Engineer, LSGD Section, Nadathara |
25.09.2025 | CM 265/25-26 |
| 209 | CM264/25-26 |
Test on Interlock Tile : Pro.No.42/25-26 Rachana Nagar Road Bylane Tile Paving Ward 9 |
Assistant Engineer, LSGD Section, Nadathara |
25.09.2025 | CM 264/25-26 |
| 208 | CM257/25-26 |
Test on Coarse Aggregates :Budjet work – 2024-25 (20% provision)(overlay work for 3.77 km) Providing 40mm chipping carpet to Ezhakkad-Vellikkad road from km 0/000 to 3/770- General civil work part S non DLP chainages between km 1/600 to 3/770. |
The Assistant Engineer, PWD Road Section, Palakkad |
25.09.25 | CM257/25-26 |
| 207 | CM249/25-26 |
BEND Test on STEEL BARS : Construction of a Lock cum Bridge at Ch.329.756 km of West Coast canal near Koottayi RCB in Tirur -Ponnanipuzha in Mangalam Grama Panchayath ,Malapuram District. |
The Assistant Engineer, Irrigation Section, Koottayi |
25.09.25 | CM 249 /2025-06 |
| 206 | CM263/25-26 |
Compressive strength of Solid Concrete Blocks: LAC-ADS-2023-24 Construction of Athani Silk Nagar Cultural Centre – Construction of Athani Silk Nagar Cultural Centre at Wadakkanchery LAC |
Assistant Engineer, PWD Buildings Section, Wadakkanchery |
24.09.2025 | CM263/25-26 |
| 205 | CM262/25-26 |
Test on Fencing Materials : Installation of Normal solar fencing from Melillam to Ninnukuzhy under Pattikkad Forest Station. |
Deputy Range Forest Officer, Pattikkad Forest Station |
24.09.2025 | CM262/25-26 |
| 204 | CM252/25-26 |
Compressive strength of Hardened Concrete:GENERAL-MIC/Kizhuppillikkara LIS/2022-Construction of Kizhuppilikkara Lift Irrigation Scheme in Thannyam panchayath, Thrissur district – Balance work -General Civil Work |
Assistant Engineer, MI Section, Cherpu . |
23.09.25 | CM252/25-26 |
| 203 | CM254/25-26 |
Test on Steel Bars:GENERAL-MIC/Kizhuppillikkara LIS/2022-Construction of Kizhuppilikkara Lift Irrigation Scheme in Thannyam panchayath, Thrissur district – Balance work -General Civil Work |
Assistant Engineer, MI Section, Cherpu . |
23.09.25 | cm254/25-26 |
| 202 | CM58/25-26 |
Test on GSB Materials :LRRP-70 Kuttichira Canal bund road Nadathara GP |
Assistant Engineer, LSGD Section, Nadathara |
22.09.2025 | CM58/25-26 |
| 201 | CM248/25-26 |
Test on Fencing Materials : Maintenance work of solar fencing from Vazhukkumpara to Vallikkayam under Pattikkad Forest Station. |
Deputy Range Forest Officer, Pattikkad Forest Station |
22.09.2025 | CM248/25-26 |
| 200 | CM242/25-26 |
Compressive strength of Hardened Concrete:LAC-ADS-2024-25 Nattika LA Construction of building for Avinissery Krishi Bhavan – Avinissery Grama Panchayath-Cherpu BP. |
The Assistant Engineer, LID&EW, LSGD Subdivision, Cherpu Block Panchayath |
20.09.2025 | CM 242/25_26 |
| 199 | CM260/25-26 |
Compressive strength of Hardened Concrete: Construction of Third floor and fourth floor including horizontal expansion portion in all floors of Chemo Day care Centre at Medical College Chest Hospital. |
The Assistant Engineer, PWD Special Buildings Section, MG Kavu, Thrissur. |
20.09.2025 | CM 260/25_26 |
| 198 | CM259/25-26 |
Compressive strength of Hardened Concrete: Budget work-2024-25(20% provision)(overlay work for 3.77 km)Providing 40 mm chipping carpet to Ezhakkad-Vellikad road from km 0/000 to 3/770-General civil work part S non DLP chainages between km 1/600 to 3/770. – Culvert Abutment Km 2/860RS |
The Assistant Engineer, PWD Road Section, Palakkad. |
20.09.2025 | CM 259/25_26 |
| 197 | CM258/25-26 |
Compressive strength of Hardened Concrete: Budget work-2024-25(20% provision)(overlay work for 3.77 km)Providing 40 mm chipping carpet to Ezhakkad-Vellikad road from km 0/000 to 3/770-General civil work part S non DLP chainages between km 1/600 to 3/770. – Culvert slab Km 2/860RS. |
The Assistant Engineer, PWD Road Section, Palakkad. |
20.09.2025 | CM 258/25_26 |
| 196 | CM244/25-26 |
Compressive strength of Solid Concrete Blocks: no:1 LAC-ADS- 2023-24 Ollur MLA – Construction of New Building for Anganwadi Centre No. 9 in ward no. 12 of Madakkathara Grama Panchayath – Ollukkara BP |
Assisstant Engineer, LSGD, Madakkathara Grama Panchayath. |
18.09.2025 | CM244/25-26 |
| 195 | CM243/25-26 |
Compressive strength of Solid Concrete Blocks: LAC-ADS- 2024-25 Nattika LA – Construction of Bulding for Avinisserry Krishi Bhavan – Avinisserry Grama Panchayath Cherpu BP. |
Assistant Engineer, LSGD Section, Cherpu Block Panchayath. |
18.09.2025 | CM243/25-26 |
| 194 | CM241/25-26
|
Test on Steel Bars:LAC-ADS- 2023-24 Nattika LA Construction of bulding for Avinissery Krishi Bhavan- Avinissery Grama Panchayath Cherpu BP. |
Assistant Engineer, LSGD Section, Cherpu Block Panchayath. |
18.09.2025 | CM241/25-26 |
| 193 | CM232/25-26 |
Compressive strength of Hardened Concrete: Kalyan Infinity,Kalyan Developers,Thrissur. |
Kalyan Infinity,Kalyan Developers,Thrissur. |
18.09.2025 | CM 232/25_26 |
| 192 | CM231/25-26 |
Compressive strength of Hardened Concrete: Kalyan Infinity,Kalyan Developers,Thrissur. |
Kalyan Infinity,Kalyan Developers,Thrissur. |
18.09.2025 | CM 231/25_26 |
| 191 | CM227/25-26 |
Compressive strength of Hardened Concrete: LAC-ADS-2023-24 Ollur MLA – Construction of new building for Anganwadi center No:9 in ward no;12 of Madakkathara Grama Panchayath-Ollukkara BP. |
Assistant Engineer, LSGD Section, Madakkathara |
17.09.2025 | CM 227/25_26 |
| 190 | CM250/25-26 |
Compressive strength of Hardened Concrete: IND-Construction of sluice D/S of Chettuva bridge to prevent the entry of salt water through PC canal in Kadappuram gramapanchayath.- Irrigation Section, Kunnamkulam |
Assistant Engineer, Quality control Section, Thrissur |
17.09.2025 | CM250/25-26 |
| 189 | CM245/25-26 |
Compressive strength of Hardened Concrete:Annual maintenance 2024-25-Annual maintenance of KC, Annamanada, Palissery 2, Palissery 1 and Poovathussery, Vennuthra LIS Schemes-General civil work. – Minor Irrigation Section, Mala. |
Assistant Engineer, Quality control Section, Thrissur |
17.09.2025 | CM245/25-26 |
| 188 | CM240/25-26 |
Compressive strength of Hardened Concrete:Rejuvenation of Kachithodu dam in Madakkathara Grama Panchayath-Minor Irrigation section Thrissur. |
Assistant Engineer, Quality control Section, Thrissur |
17.09.2025 | CM240/25-26 |
| 187 | CM216/25-26 |
Compressive strength of Hardened Concrete: PSM-Annual maintenance of Nadathara Kalathodu,Chiyaram branch canal for the year 2024-25.- Irrigation Section, Thrissur |
Assistant Engineer, Quality control Section, Thrissur |
16.09.2025 | CM216/25-26 |
| 186 | CM228/25-26 |
Compressive strength of Hardened Concrete: Construction of new building for Sub Registrar Office, Koduvayur. |
Assistant Engineer, PWD Buildings Section, Nenmara |
16.09.2025 | CM 228/25_26 |
| 185 | CM251/25-26 |
Test on Fencing Materials : Construction of Solar Power Fencing at 1958 TP padam in Padam Forest Station and 1955 T.P Valiyakondody at Kokkathodu Forest Station under Naduvathumoozhy Range |
Range Forest Officer, Naduvathumoozhy Range |
15.09.2025 | |
| 184 | CM230/25-26 |
Test on Fencing Materials : Installation of Solar hanging Fencing at 1954 Chokkana Teak Plantation (now planting activities) under Mupliyam Forest Station Vellikulangara Range, Chalakudy Forest Division. |
Range Forest Officer, Vellikulangara Range |
15.09.2025 | |
| 183 | CM229/25-26 |
Test on Fencing Materials : Installation of Solar hanging Fencing at 1947 Chokkana Teak plantation (now Planting activites) under Mupliyam Forest Station Vellikulangara Range, Chalakudy Forest Division. |
Range Forest Officer, Vellikulangara Range |
15.09.2025 | |
| 182 | CM225/25-26 |
Test on Steel Bars:Construction of ST:Marys Church,Ayyanthole,Thrissur. |
ST:Marys Assumption church,Ayyanthole,Thrissur. |
12.09.2025 | |
| 181 | CM239-239A/25-26 |
Compressive strength and Density of Hardened Concrete: Construction of ST:Marys Church,Ayyanthole,Thrissur. |
ST:Marys Assumption church,Ayyanthole,Thrissur. |
12.09.2025 | |
| 180 | CM238/25-26 |
Test on Steel Bars: Report of the Tests on Steel Bars Supplied by the Assistant Engineer, PWD Buildings Section, Wadakkanchery |
Assistant Engineer, PWD Buildings Section, Wadakkanchery |
11.09.2025 | CM238/25-26 |
| 179 | CM223/25-26 |
Non Destructive Tests: Conducting Non Destructive Tests at Daya Royal Hospital at Kunnamkulam |
Bench Mark Project Management Consultants, DD Complex, Mundur P.O, Thrissur |
11.09.2025 | |
| 178 | CM 164/25-26 |
Mix Design –General Education Department-Annual plan 2021-2022.Construction of school building for Government Girls Higher Secondary School, Irinjalakuda. |
The Assistant Engineer, PWD Building Section -1, Irrinjalakuda. |
08.09.2025 | |
| 177 | CM 172/25-26 |
Mix Design –General Higher Education Department-Technical educatin-Annual plan 2023-2024-Construction activities inrespect of various Govt.Polytechnic colleges – Construction of New Academic block of Govt.Polytechnic college Koratty – First Phase. |
The Assistant Engineer, PWD Building Section , Chalakudy. |
08.09.2025 | |
| 176 | CM217/25-26 |
Compressive strength of Hardened Concrete:General-2022-23 Construction of new building for Govt Higher Secondary School Kattilappovam,Thrissur. |
The Assistant Engineer, PWD Building Section -1, Thrissur |
08.09.2025 | |
| 175 | CM211A/25-26 |
Density of Hardened Concrete: Microwin Steri Solutions Pvt. Ltd ,Kinfra Mega Food Park,Kanjikode,Kozhipara.P.O,Palakkad |
Microwin Steri Solutions Pvt. Ltd ,Kinfra Mega Food Park,Kanjikode,Kozhipara.P.O,Palakkad |
08.09.2025 | |
| 174 | CM211/25-26 |
Compressive strength of Hardened Concrete: Microwin Steri Solutions Pvt. Ltd ,Kinfra Mega Food Park,Kanjikode,Kozhipara.P.O,Palakkad |
Microwin Steri Solutions Pvt. Ltd ,Kinfra Mega Food Park,Kanjikode,Kozhipara.P.O,Palakkad |
08.09.2025 | |
| 173 | CM215A/25-26 |
Water Absorption of Concrete Paving Blocks:HPCL RO Trichur Auto Centre,Thrissur. |
Manager(Engineering),HPCL,Kozhikode. |
08.09.2025 | |
| 172 | CM215/25-26 |
Compressive strength of Concrete Paving Blocks: HPCL RO Trichur Auto Centre,Thrissur. |
Manager(Engineering),HPCL,Kozhikode. |
08.09.2025 | |
| 171 | CM209/25-26 |
Compressive strength of Hardened Concrete: Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Phase-1 in Eruthenpathy panchayath ,Palakkad District . |
M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra |
08.09.2025 | |
| 170 | CM192/25-26 |
Test on Steel Bars:Report of the Tests on Steel Bars(AF Star TMT-Fe 550 D) Supplied by the Assistant Engineer, Irrigation Section, Koottayi. |
Assistant Engineer, Irrigation Section,Koottayi. |
08.09.2025 | |
| 169 | CM191/25-26 |
Test on Steel Bars:Report of the Tests on Steel Bars(AF Star TMT-Fe 550 D- Epoxy coated) Supplied by the Assistant Engineer, Irrigation Section, Koottayi. |
Assistant Engineer, Irrigation Section,Koottayi.
|
08.09.2025 | |
| 168 | CM224/25-26 |
Compressive strength and density of of Hardened Concrete: Construction of ST:Marys Assumption church,Ayyanthole,Thrissur. |
ST:Marys Assumption church,Ayyanthole,Thrissur. |
01.09.2025 | |
| 167 | CM447/24-25 |
Compressive strength of Hardened Concrete: Reconstruction of Pulikkalachira Bridge in Padiyoor Grama Panchayath in Irrinjalakuda LAC in Thrissur District,pile (A2P2) |
Assistant Engineer, PWD Bridges Section,Chalakudy. Thodupuzha | 27.08.2025 | |
| 166 | CM206/25-26 |
Test on Fencing Materials : Installation of Solar Fencing from Kanakamala to Maramkode under Mupliyam Forest Station, Vellikulangara Range, Chalakudy Forest Division. |
Range Forest Officer, Vellikulangara Range | 23.08.2025 | |
| 165 | CM205/25-26 |
Test on Fencing Materials : Installation of Solar Fencing at Pullumudi Veeranchira area under Konnakuzhy Forest Station, Pariyaram Range, Chalakudy Forest Division. |
Range Forest Officer, Pariyaram Range | 23.08.2025 | |
| 164 | CM200/25-26 | Test on Steel Bars: Report of the Tests on Steel Bars Supplied by the Assistant Engineer, Minor Irrigation Section, Thodupuzha | Assistant Engineer, M inor Irrigation Section, Thodupuzha | 18.08.2025 | |
| 163 | CM195/25-26 | Compressive strength of Paving Blocks: NRO Nadavayal | Manager (Engineering), HPCL, Kozhikode | 18.08.2025 | |
|
162 |
CM196/25-26 | Compressive strength of Hardened Concrete: GENERAL-Culvert-Reconstruction of culvert near Chirakkunnu brothers club at ch.0/550 km in Kuttur branch canal.- Irrigation Section, Thrissur | Assistant Engineer, Quality Control Section, Thrissur. | 14.08.2025 | |
| 161 | CM186/25-26 | Compressive strength of Hardened Concrete: Project-Skyline-Vistara,Thrissur. | Tritech Readymix Concrete, Thrissur Building Materials, Mannuthy, Thrissur. | 12.08.2025 | |
| 160 | CM185/25-26 | Compressive strength of Hardened Concrete: Project-Skyline-Vistara,Thrissur. | Tritech Readymix Concrete, Thrissur Building Materials, Mannuthy, Thrissur. | 12.08.2025 | |
| 159 | CM194/25-26 | Compressive strength of Hardened Concrete: General Education Department – Annual plan 2023-24 Construction of school building for Govt.Fisheries LP School , Vekkode, Kodungallur, Thrissur.- Ground Floor Slab | Assistant Engineer, PWD Buildings Section, Kodungallur. | 12.08.2025 | |
| 158 | CM193/25-26 | Compressive strength of Hardened Concrete: Annual plan 2023-24 Construction of school building for Govt.UP School Vellikulangara, Thrissur – General civil works – Roof slab | Assistant Engineer, PWD Buildings Section, Chalakudy. | 12.08.2025 | |
| 157 | CM162/25-26 | Compressive strength of Hardened: General – Thrissur District-Total development plan for Wadakkanchery river phase-1-General Civil Work. – Irrigation Section, Kunnamkulam | Assistant Engineer, Quality Control Section, Thrissur. | 07.08.2025 | |
| 156 | CM175/25-26 | Compressive strength of Hardened: LAC-ADS-(2024-25)Nattika-Construction of retaining wall in Puthenthodu near Pazhuvil St.Antonys Church in Chazhur Grama Panchayath.- Irrigation Section, Enamakkal | Assistant Engineer, Quality Control Section, Thrissur. | 07.08.2025 | |
| 155 | CM110/25-26 | Soundness Test of Cement : Construction of salt water extrusion sluice at IV Kettu in Vatanapilly Panchayath, Thrissur | Assistant Engineer, Minor Irrigation Section, Kodungallur. | 06.08.2025 | |
| 154 | CM174/25-26 | Compressive strength of Hardened: Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District. – M30-6nos (Raft & Haunch 0+345 to +370). | M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra | 06.08.2025 | |
| 153 | CM173/25-26 | Compressive strength of Hardened: Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District. – M35-6nos (P6-P7 Superstructure wall & Tiebeam). | M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra | 06.08.2025 | |
| 152 | CM179/25-26 | Compressive strength of Concrete Core: Construction of Boat Jetty in Thrissur District. | Assistant Engineer, Irrigation Section, Kunnamkulam. | 06.08.2025 | |
| 151 | CM177/25-26 | Test on Steel Bars: Report of the Tests on Steel Bars Supplied by M/s. Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. |
Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. |
31.07.2025 | |
| 150 | CM164/25-26 | Mix Design – Interim Report of the Concrete Mix Design -M30 (ACC Suraksha Silver Range PPC) Carried out for the Assistant Engineer, IPWD Buildings Section, Irinjalakuda. |
Assistant Engineer, IPWD Buildings Section, Irinjalakuda. |
30.07.2025 | |
| 149 | CM176/25-26 | Test on Fencing Materials : Construction of Physical Barrier for Mitigating Man Animal Conflict under HRC Solar Hanging Fencing at Azhuthakadavu area Kalaketty to 116 Erumeli Range, Kooppara Jundapady kettuchira area and Azhuthakkadavu munambu Pezhumkandam-Murikkattukudy- Kurisumala Kozhimala area Ayyappankovil Range. |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd, Kottayam. |
29.07.2025 | |
| 148 | CM170/25-26 | Test on Fencing Materials : Construction of Physical Barrier for Mitigating Man Animal Conflict under HRC Solar hanging Fencing at Kozhiyalakudy in Anakkulam Range, Kurathikudy to Kattukudy in Adimali Range,Parisakkallu to Pazhampallichal in Neryamangalam Range. |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd, Kottayam.
|
29.07.2025 | |
| 147 | CM152/25-26 | Pile Integrity Test :“Renovation of Naduvathithodu at Tanur Municipality in Tanur LAC,Malappuram District,Phase 1-Construction of SWE Vented Cross Bar cum Bridge across Naduvathithodu at Poorapuzha River mouth im Tanur Municipality.”. |
Assistant Engineer, Minor Irrigation Section, Tirur |
28.07.2025 | |
| 146 | CM153/25-26 | Compressive strength of Hardened Concrete: Project:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
28.07.2025 | |
| 145 | CM130/25-26 | Compressive strength of Hardened Concrete: Project:Navera Regalia |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
28.07.2025 | |
| 144 | CM117/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
28.07.2025 | |
| 143 | CM116/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
28.07.2025 | |
| 142 | CM171/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, PWD, Bridges section,Thrissur. | Assistant Engineer, PWD, Bridges section,Thrissur. | 26.07.2025 | |
| 141 | CM133/25-26 | Compressive strength of Hardened Concrete: Uppuzhy Lift Irrigation Scheme in Varandirappilly Panchayath (Phase-I) | Assistant Engineer, Minor Irrigation Section, Kodakara | 26.07.2025 | |
| 140 | CM132/25-26 | Compressive strength of Hardened Concrete: Uppuzhy Lift Irrigation Scheme in Varandirappilly Panchayath (Phase-I) | Assistant Engineer, Minor Irrigation Section, Kodakara | 26.07.2025 | |
| 139 | CM131/25-26 | Compressive strength of Hardened Concrete: Uppuzhy Lift Irrigation Scheme in Varandirappilly Panchayath (Phase-I) | Assistant Engineer, Minor Irrigation Section, Kodakara | 26.07.2025 | CM 131/25-26 |
| 138 | CM100/25-26 | Compressive strength of Hardened Concrete: Reconstruction of Pulikkalachira Bridge in Padiyoor Grama Panchayath in Irinjalakuda LAC in Thrissur Dt.-Pile Cap(A2) | Assistant Engineer, PWD Bridges Section,Chalakudy. | 25.07.2025 | |
| 137 | CM169/25-26 | Compressive strength of Interlock Tiles: Project No.252/25-26 Happy Nagar Bylane road interlocking and Drainage ward 2 | Assistant Engineer, LSGD Section, Nadathara | 23.07.2025 | |
| 136 | CM150/25-26 | Test on Chequered Cement Concrete Paving Tiles: Report of the Test Conducted on Chequered Cement Concrete Paving Tiles Supplied by M/s. Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | 23.07.2025 | |
| 135 | CM42/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, Peechi Project Section, Mannamangalam. | Assistant Engineer, Peechi Project Section, Mannamangalam | 23.07.2025 | |
| 134 | CM163A/25-26 |
Test on Concrete Solid Blocks: Report of the Test Conducted on Concrete Solid Blocks Supplied by Assistant Engineer, PWD Buildings Section, Chalakudy |
Assistant Engineer, PWD Buildings Section, Chalakudy | 21.07.2025 | |
| 133 | CM163/25-26 |
Test on Concrete Solid Blocks: Report of the Test Conducted on Concrete Solid Blocks Supplied by Assistant Engineer, PWD Buildings Section, Irinjalakuda. |
Assistant Engineer, PWD Buildings Section, Irinjalakuda. | 21.07.2025 | |
| 132 | CM138/25-26 |
Compressive strength of SBR Polyumer Modified Cement Mortar Cubes: PSM- Urgent Rectification to aqueduct and side wall at LBMC Ch:3/000 km. |
Assistant Engineer, Head Works Section, Peechi | 21.07.2025 | |
| 131 | CM159/25-26 |
Compressive strength of Hardened Concrete: General- Rectification works-2024-25-PSM-Urgent rectification to Aqueduct and side wall at LBMC 3/000 KM. – Head Works Section, Peechi. |
Assistant Engineer, Quality Control Section, Thrissur. | 14.07.2025 | |
| 130 | CM158/25-26 | Compressive strength of Hardened Concrete: Construction of new Boat Jetty at Thriprayar East Kadavu OL-IA/2634/2022-General civil work.- Irrigation Section, Ollukkkara | Assistant Engineer, Quality Control Section, Thrissur. | 14.07.2025 | |
| 129 | CM157/25-26 |
Compressive strength of Hardened Concrete: General-Manalur LIS-Reconstruction of Sluice at starting point of leading channel in Manalur LIS-General Civil Work. – M.I.Section, Chavakkad |
Assistant Engineer, Quality Control Section, Thrissur. | 14.07.2025 | |
| 128 | CM156/25-26 | Compressive strength of Hardened Concrete: General-Protection works to the right bank of Chalakudy river downstream of Thoduvakadavu in Annamanada Panchayath C-15/2022. – Irrigation Section, Chalakudy | Assistant Engineer, Quality Control Section, Thrissur. | 14.07.2025 | |
| 127 | CM155/25-26 | Compressive strength of Hardened Concrete: General-Construction of new Boat Jetty at Thriprayar East Kadavu OL-IA/2634/2022-General civil work.- Irrigation Section, Ollukkkara | Assistant Engineer, Quality Control Section, Thrissur. | 14.07.2025 | |
| 126 | CM154/25-26 | Compressive strength of Hardened Concrete: General-Construction of new Boat Jetty at Thriprayar East Kadavu OL-IA/2634/2022-General civil work.- Irrigation Section, Ollukkkara | Assistant Engineer, Quality Control Section, Thrissur. | 14.07.2025 | |
| 125 | CM149/25-26 | Test on Concrete Solid Blocks: Report of the Test Conducted on Concrete Solid Blocks for the Construction of Vishram Utsav Supplied by M/s. Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | 04.07.2025 | |
| 124 | CM139/25-26 | Test on Concrete Solid Blocks: Report of the Test Conducted on Concrete Solid Blocks for the Construction of Vishram Utsav Supplied by M/s. Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | 04.07.2025 | |
| 123. | CM13-13A/25-26 | Mix Design Report: Report of the Concrete Mix Design -M25 (Sankar OPC 53 Grade) Carried out for the Assistant Engineer, Irrigation Section, Enamakkal. | Assistant Engineer, Irrigation Section, Enamakkal. | 04.07.2025 | |
| 122 | CM148/25—26 | Test on Fencing Material : Assessing the quality of materials in the solar fencing work at Neriyamangalam Range. | Range Officer, Mullaringadu Range,Idukki. | 02.07.2025 | |
| 121 | CM151/25—26 | Compressive strength of Concrete Solid Blocks: Construction of Excise Complex Building at Chittur | Assistant Engineer, PWD Building Section,Chittur-Thathamangalam. | .07025 | |
| 120 | CM143/25-26 | Compressive strength of Concrete Core: REBUILD KERALA INITIATIVE- Rectification works at Idiyanchira Regulator | Assistant Engineer, Irrigation Section, Enamakkal. | 30.06.2025 | |
| 119 | CM146/25-26 | Compressive strength of Hardened Concrete:General Education Department – Annual plan 2023-24 Construction of school building for Govt.Fisheries LP School ,Vekkode,Kodungallur, Thrissur. | Assistant Engineer, PWD Building Section,Kodungallur. | 30.06.2025 | |
| 118 | CM145/25-26 | Compressive strength of Hardened Concrete:General Education Department – Annual plan 2023-24 Construction of school building for Govt.Fisheries LP School ,Vekkode,Kodungallur, Thrissur. | Assistant Engineer, PWD Buildings Section,Kodungallur. | 24.06.2025 | |
| 117 | CM144/25-26 | Compressive strength of Hardened Concrete: Annual plan 2023-24 Construction of school building for Govt.UP School Vellikulangara,Thrissur – General civil works – Column Concrete | Assistant Engineer, PWD Buildings Section,Chalakudy. | 24.06.2025 | CM 144/25-26 |
| 116 | CM142/25-26 | Test on Steel Bars:Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Phase-1 in Eruthenpathy panchayath ,Palakkad District . | M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra | 23.06.2025 | |
| 115 | CM141/25-26 | Compressive strength of Hardened: Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Phase-1 in Eruthenpathy panchayath ,Palakkad District – Wall & Slab 6 +285 to 6+300. | M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra | 23.06.2025 | |
| 114 | CM140/25-26 | Compressive strength of Hardened: Extension of Moolathara Right Bank Canal from Korayar to Varattayar,Civil works in Eruthenpathy Panchayath, Palakkad District. – P26-P27 Superstructure wall. | M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra | 23.06.2025 | |
| 113 | CM122/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, Quality Control Section, Thrissur. | Assistant Engineer, Quality Control Section, Thrissur. | 20.06.2025 | |
| 112 | CM121/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, Quality Control Section, Thrissur. |
Assistant Engineer, Quality Control Section, Thrissur. |
20.06.2025 | |
| 111 | CM120/25-26 | Test on Steel Bars: Report of the Tests on Steel Bars Supplied by Assistant Engineer, Quality Control Section, Thrissur. |
Assistant Engineer, Quality Control Section, Thrissur. |
20.06.2025 | |
| 110 | CM94/25-26 | Test on Rock Core Samples:Soil Investigation for construction of Thumbathadam weir, Kannur district. |
Deputy Director, Instrumentation Division, KERI, Peechi. |
19.06.2025 | |
| 109 | CM84/25-26 | Test on Rock Core Samples: Soil Investigation for construction of Thumbathadam weir, Kannur district. |
Deputy Director, Instrumentation Division, KERI, Peechi. |
19.06.2025 | |
| 108 | CM108/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 107 | CM92/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 106 | CM91/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 105 | CM90/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 104 | CM82/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 103 | CM81/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 102 | CM80/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 101 | CM69/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 100 | CM68/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 99 | CM56/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 98 | CM55/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 97 | CM54/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 96 | CM53/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 95 | CM41/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 94 | CM40/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 93 | CM28/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 92 | CM27/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 91 | CM26/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 90 | CM16/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 89 | CM15/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 88 | CM14/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 87 | CM05/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 86 | CM04/25-26 | Compressive strength of Hardened Concrete: Project:Navera Taneira |
M/s Navera Builders, 1st Floor, Tharappel Complex, Kolazhy, Thrissur |
16.06.2025 | |
| 85 | CM127/25-26 | Test on Fine Aggregate (P-Sand): Report of the Test Conducted on Fine Aggregate (P-Sand) Supplied by M/s. Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. |
Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. |
16.06.2025 | |
| 84 | CM126/25-26 | Test on Concrete Solid Blocks: Report of the Test Conducted on Concrete Solid Blocks Supplied by M/s. Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. |
Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. |
16.06.2025 | |
| 83 | CM125/25-26 | Compressive strength of Hardened Concrete: Project of Villa at Kaloor. – Ground floor roof slab |
Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. |
13.06.2025 | |
| 82 | CM119/25-26 | Tests on Concrete Paving Blocks: DRIP-Phase II Rehabilitation & Improvement of Basic facilities of Kanhirapuzha Dam-Providing Additional facilities to existing control room , Turfing on D/S of dam, construction of horizontal and vertical chute drain , Providing stilling pool ,Surveying periphery of water spread area , Investigation works for bridge and watch tower –General Civil Works |
Assistant Engineer, Quality Control Section, Palakkad.
|
12.06.2025 | |
| 81 | CM109/25-26 | Test on Fencing Material : Construction of physical Barrier for Mitigating Man Animal Conflict under HRC Solar Hanging Fencing at Jundapady Ambalakadavu in Ayyappankovil Range and around Plakkathadam Tribal Settlement Colony, Erumeli Range. |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd, Kottayam. |
11.06.2025 | |
| 80 | CM71/25-26 | Test on Fencing Materials : Installation of Solar Fencing from Thirumani colony to Mannathippara (29.55 km) under Elanadu Forest Station. |
Range Forest Officer, Machad Range, Wadakkanchery, Thrissur. |
11.06.2025 | |
| 79 | CM83/25-26 | Inspection Report on Construction of Peafowl Museum in Chulannur Peafowl Sanctuary. |
Assistant Wild Life Warden, Peechi-Vazhani Wild Life Sanctuary, Peechi, Thrissur. |
10.06.2025 | |
| 78 | CM102/25-26 | Test on Fencing Materials : Construction of Hanging Solar power fencing in Vazhachal Division in Thrissur (60 km) |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd, Thrissur. |
10.06.2025 | |
| 77 | CM97/25-26 | Tests on Concrete Paving Blocks: Paving Interlock Tiles Dismantled from State High along the sides of Vilangankunnu Road. |
Assistant Executive Engineer, Puzhakkal Block Panchayath. |
10.06.2025 | |
| 76 | CM98/25-26 | Test on Coarse Aggregates : Report of the Tests on Coarse Aggregates supplied by the Assistant Engineer, Quality Control Section, Thrissur. |
Assistant Engineer, Quality Control Section, Thrissur. |
10.06.2025 | CM98/25-26 |
| 75 | CM114/25-26 | Compressive strength of Hardened Concrete: NCC URBAN INFRASTRUCTURE Project –JOY ALUKAS GOLD TOWER, THRISSUR. |
TRITECH Readymix Concrete, Thrissur Building Materials, Mannuthy, Thrissur. |
06.06.2025 | CM 114/25-26 |
| 74 | CM113/25-26 | Compressive strength of Hardened Concrete: NCC URBAN INFRASTRUCTURE Project –JOY ALUKAS GOLD TOWER, THRISSUR. |
TRITECH Readymix Concrete, Thrissur Building Materials, Mannuthy, Thrissur. |
06.06.2025 | CM 113/25-26 |
| 73 | CM96/25-26 | Compressive strength of Hardened Concrete: NCC URBAN INFRASTRUCTURE Project –JOY ALUKAS GOLD TOWER, THRISSUR. |
TRITECH Readymix Concrete, Thrissur Building Materials, Mannuthy, Thrissur. |
06.06.2025 | CM 96/25-26 |
| 72 | CM95/25-26 | Compressive strength of Hardened Concrete: NCC URBAN INFRASTRUCTURE Project –JOY ALUKAS GOLD TOWER, THRISSUR. | TRITECH Readymix Concrete, Thrissur Building Materials, Mannuthy, Thrissur. | 06.06.2025 | CM 95/25-26 |
| 71 | CM118 | Compressive strength of Hardened Concrete: Construction of Coomercial building at Painoor for Manappuram Finance Ltd.-RCC Pile cap. |
Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. |
04.06.2025 | CM 118/25-26 |
| 70 | CM10/25-26 | Test on Rock Core Samples: Investigation for construction of Regulator Cum Bridge across Aralam River at Kalikkayam in Kanichar Panchayath. |
Assistant Engineer, IWR Section 1/1, Palakkad. |
03.06.2025 | CM 10/25-26 |
| 69 | CM115/25-26 | Compressive strength of Hardened Concrete: Reconstruction of Pulikkalachira Bridge in Padiyoor Grama Panchayath in Irinjalakuda LAC in Thrissur Dt.-Abutment wall (A2) |
Assistant Engineer, PWD Bridges Section,Chalakudy. |
02.06.2025 | CM115/25-26 |
| 68 | CM48/25-26 | Compressive strength of Hardened Concrete: Construction of Feeding chal from Adampu Thodu to Thachampilly kulam in Arimpur Panchayath. Roof slab of Pump house no.2.. |
Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. |
02.06.2025 | CM 48/25-26 |
| 67 | CM107/25-26 | Compressive strength of Hardened Concrete: Project AKD GP 121/24-Providing Permanent shutter for various Pulikketta in Anthikad Panchayath. |
Assistant Engineer, LSGD Section, Anthikkad Grama Panchayath. |
31.05.2025 | CM 107/25-26 |
| 66 | CM106/25-26 | Compressive strength of Hardened Concrete: URBAN AGGLOMERATION Project AKD GP 142/23 -Pindanikkulam side protection in ward 14 in Anthikad Panchayath. |
Assistant Engineer, LSGD Section, Anthikkad Grama Panchayath. |
31.05.2025 | CM 106/25-26 |
| 65 | CM105/25-26 | Compressive strength of Hardened Concrete: Anthikad GP-74/24-2023-24- Kuthirakulam side protection in Anthikad Grama Panchayath. |
Assistant Engineer, LSGD Section, Anthikkad Grama Panchayath. |
31.05.2025 | CM 105/25-26 |
| 64 | CM64/25-26 | Test on Fly ash bricks: Report of the Tests on Fly ash bricks Supplied by Assistant Engineer, Quality Control Section, Palakkad |
Assistant Engineer, Quality Control Section, Palakkad |
31.05.2025 | CM64/25-26 |
| 63 | CM75/25-26 | Test on Fencing Materials :Assessing the quality of materials for the work of Installation of Solar Fencing under Evergreen Forest Station, Kalady Range, Ernakulam. |
Range Forest Officer, Kalady Range, Neeleeswaram P.O, Ernakulam. |
30.05.2025 | CM75/25-26 |
| 62 | CM101/25-26 | Test on Fencing Materials :Assessing the quality of materials for the work of construction of Hanging Solar power fencing in Chalakudy Division in Thrissur. |
Project Engineer, Kerala Police Housing and Construction Corporation Ltd, Thrissur. |
29.05.2025 | CM101/25-26 |
| 61 | CM112/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Executive Engineer, Kerala Water Authority, Project Division, Kottayam. | Executive Engineer, Kerala Water Authority, Project Division, Kottayam. | 29.05.2025 | CM112/25-26 |
| 60 | CM111/25-26 | Compressive strength of Hardened Concrete: Construction of new building for Higher Secondary block for Chandra Memorial Govt , Higher Secondary School Kattur,Thrissur-Phase 1. | Assistant Engineer,PWD Building Section No.2 Ayyanthole,Thrissur. | 29.05.2025 | CM 111/25-26 |
| 59 | CM36/25-26 | Mix Design – Report of the Concrete Mix Design -M35 (Dalmia PPC) Carried out for the Assistant Engineer, Irrigation Section, Koottayi. | Assistant Engineer, Irrigation Section, Koottayi. | 27.05.2025 | CM36/25-26 |
| 58 | CM35/25-26 | Mix Design – Report of the Concrete Mix Design -M30 (Dalmia PPC) Carried out for the Assistant Engineer, Irrigation Section, Koottayi. | Assistant Engineer, Irrigation Section, Koottayi. | 27.05.2025 | CM35/25-26 |
| 57 | CM34/25-26 | Mix Design – Report of the Concrete Mix Design -M20 (Dalmia PPC) Carried out for the Assistant Engineer, Irrigation Section, Koottayi. | Assistant Engineer, Irrigation Section, Koottayi. | 27.05.2025 | CM34/25-26 |
| 56 | CM78/25-26 | Compressive strength of Hardened Concrete: Provision of new 6 m wide Foot Over Bridge at 5 stations-GUV,AFK.ALLP.TRVI,KYJ and one 12 m wide FOB at NCJ. | Senior Section Engineer, Works /Gati Shakti Trivandrum. | 27.05.2025 | CM 78/25-26 |
| 55 | CM77/25-26 | Compressive strength of Hardened Concrete: Provision of new 6 m wide Foot Over Bridge at 5 stations-GUV,AFK.ALLP.TRVI,KYJ and one 12 m wide FOB at NCJ. | Senior Section Engineer, Works /Gati Shakti Trivandrum. | 27.05.2025 | CM 77/25-26 |
| 54 | CM76/25-26 | Compressive strength of Hardened Concrete: Provision of new 6 m wide Foot Over Bridge at 5 stations-GUV,AFK.ALLP.TRVI,KYJ and one 12 m wide FOB at NCJ. | Senior Section Engineer, Works /Gati Shakti Trivandrum. | 27.05.2025 | CM 76/25-26 |
| 53 | CM59/25-26 | Compressive strength of Hardened Concrete: 128/25 Miaintenance works of Buildings in Office compound. | Assistant Engineer, LSGD Subdivision, Anthikkad Block Panchayath. | 24.05.2025 | CM 59/25-26 |
| 52 | CM74/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, Minor Irrigation Section, Chavakkad. | Assistant Engineer, Minor Irrigation Section, Chavakkad. | 23.05.2025 | CM74/25-26 |
| 51 | CM104/25-26 | Compressive strength of Hardened Concrete:Construction of Puthur Parallel Bridge in Puthur-Mannamangalam road in Ollur Constituency-Diaphragm A1 side( Trial mix aura mix DC) | Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | 23.05.2025 | CM 104/25-26 |
| 50 | CM103/25-26 | Compressive strength of Hardened Concrete:Construction of Puthur Parallel Bridge in Puthur-Mannamangalam road in Ollur Constituency-Diaphragm A1 side(Trial mix) | Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | 23.05.2025 | CM 103/25-26 |
| 49 | CM89/25-26 | Non Destructive Tests: “Rehabilitation of LIS 2017-18- Thrissur District – Reconstruction of Vynthala No.2 pump house.” | Assistant Engineer, Minor Irrigation Section, Kodakara. | 23.05.2025 | CM 89/25-26 |
| 48 | CM88/25-26 | Non Destructive Tests: “Thottumukham LIS-Phase 3-Pipeline extension-General Civil Work.” | Assistant Engineer, Minor Irrigation Section, Kodakara. | 23.05.2025 | CM 88/25-26 |
| 47 | CM87/25-26 | Non Destructive Tests: “Revamping of Vynthala No.1 LIS – Construction of pump house and Electrification Works.” | Assistant Engineer, Minor Irrigation Section, Kodakara. | 23.05.2025 | CM 87/25-26 |
| 46 | CM99/25-26 | Compressive strength of Hardened Concrete:Construction of Puthur Parallel Bridge in Puthur-Mannamangalam road in Ollur Constituency-Diaphragm A1 side | Assistant Engineer, PWD Bridges Section, Thrissur. | 21.05.2025 | CM 99/25-26 |
| 45 | CM13A/25-26 | Mix Design Report: Report of the Concrete Mix Design -M25 (Sankar OPC 53 Grade) Carried out for the Assistant Engineer, Irrigation Section, Enamakkal. | Assistant Engineer, Irrigation Section, Enamakkal. | 21.05.2025 | CM13A/25-26 |
| 44 | CM23/25-26 | Mix Design Report: Report of the Concrete Mix Design -M25 (ACC PPC ) Carried out for the Assistant Engineer, Peechi Project Section, Mannamangalam. | Assistant Engineer, Peechi Project Section, Mannamangalam. | 21.05.2025 | CM23/25-26 |
| 43 | CM86/25-26 | Compressive strength of Hardened: Construction of VISHRAAM UTSAV-4F Slab. | Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | 19.05.2025 | CM 86/25-26 |
| 42 | CM85/25-26 | Compressive strength of Hardened: Construction of VISHRAAM UTSAV-3F Slab. | Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | 19.05.2025 | CM 85/25-26 |
| 41 | CM73/25-26 | Compressive strength of Hardened: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1″ in Eruthenpathy Panchayath, Palakkad District. – Pedestal P35 & P36 | Project Manager, M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra | 19.05.2025 | CM 73/25-26 |
| 40 | CM72/25-26 | Compressive strength of Hardened: Extension of Moolathara Right Bank Canal from Korayar to Varattayar, Phase-1″ in Eruthenpathy Panchayath, Palakkad District. – Raft & Haunch | Project Manager, M/s PRATHMESH & KK (JV), 81. Tilak Nagar, Aurangabad, Maharashtra | 19.05.2025 | CM 72/25-26 |
| 39 | CM 57/25-26 | Compressive strength of Paver Blocks: LRRP 70/24-25 kuttichira Canal road Nadathara GP. | Assistant Engineer, LSGD Section, Nadathara. | 15.05.2025 | CM 57/25-26 |
| 38 | CM 49/25-26 | Compressive strength of Concrete :Construction of Check Dam cum Bridge at Karichalkadvu at Kattakambal Grama Panchayath. | Assistant Engineer, Minor Irrigation Section, Kunnamkulam. | 14.05.2025 | CM 49/25-26 |
| 37 | CM61/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, Quality Control Section ,Palakkad. | Assistant Engineer, Quality Control Section,Palakkad. | 13.05.2025 | CM 61/25-26 |
| 36 | CM62/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, Quality Control Section ,Palakkad. | Assistant Engineer, Quality Control Section,Palakkad. | 13.05.2025 | CM 62/25-26 |
| 35 | CM63/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, Quality Control Section ,Palakkad. | Assistant Engineer, Quality Control Section,Palakkad. | 13.05.2025 | CM 63/25-26 |
| 34 | CM70/25-26 | Pile Echo Test :“CSIND – Construction of Lock cum bridge in CH: 316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dis | Assistant Engineer, Irrigation Section No.2, Ponnani | 09.05.2025 | CM70/25-26 |
| 33 | CM19/25-26 | Compressive strength of Concrete : General–Construction of Boat Jetty at Eanamavu in Thrissur District. – Irrigation Section, Kunnamkulam. | Assistant Engineer, Quality Control Section, Thrissur | 09.05.2025 | CM 19/25-26 |
| 32 | CM18/25-26 | Compressive strength of Concrete : General–Construction of Boat Jetty at Eanamavu in Thrissur District. – Irrigation Section, Kunnamkulam. | Assistant Engineer, Quality Control Section, Thrissur | 09.05.2025 | CM 18/25-26 |
| 31 | CM60/25-26 | Tests on Coarse & Fine Aggregates (M-Sand): Report of the Tests on Coarse & Fine Aggregates (M-Sand) supplied by Olivia Projects, Poonkunnam, Thrissur. | Olivia Projects, G1, Gayathri Apartments, Poonkunnam, Thrissur. | 09.05.2025 | CM60/25-26 |
| 30 | CM01/25-26 | Mix Design Report: Report of the Concrete Mix Design -M25 (ACC PPC ) Carried out for the Assistant Engineer, PWD Buildings Section No.2 Ayyanthole,Thrissur. | Assistant Engineer,PWD Building Section No.2 Ayyanthole,Thrissur. | 05.05.2025 | CM01/25-26 |
| 29 | CM33/25-26 | Compressive strength of Concrete : GENERAL- Thrissur District- Total development plan for Wadakkanchery river phase-1 – Irrigation Section, Kunnamkulam | Assistant Engineer,Quality Control Section,Thrissur | 03.05.2025 | CM 33/25-26 |
| 28 | CM45/25-26 | Compressive strength of Concrete : Pandankulam- Renovation works to Pandankulam in Chelakkara Grama Panchayath. – Minor Irrigation Section Chelakkara | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | CM 45/25-26 |
| 27 | CM44/25-26 | Compressive strength of Concrete : General–Construction of Boat Jetty at Eanamavu in Thrissur District. – Irrigation Section, Kunnamkulam. | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | CM 44/25-26 |
| 26 | CM32/25-26 | Compressive strength of Concrete :Renovation of Chirayanchalkulam in Annamanad Panchayath Phade II -Minor Irrigation Section Mala. | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | CM 32/25-26 |
| 25 | CM30/25-26 | Compressive strength of Concrete :Renovation of Chirayanchalkulam in Annamanad Panchayath Phade II -Minor Irrigation Section Mala. | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | CM 30/25-26 |
| 24 | CM31/25-26 | Compressive strength of Concrete :Renovation of Changankulangara mahavishnu kshethrakualam in Annamanada gramapanchayath.-Minor Irrigation. | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | CM 31/25-26 |
| 23 | CM52/25-26 | Compressive strength of Concrete :Construction of salt water extrusion sluice in kandekkaduthodu near Padanna at ward 30 of Kodungallur Muncipality -Minor Irrigation Section,Kodungallur. | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | CM 52/25-26_ |
| 22 | CM51/25-26 | Compressive strength of Concrete :Construction of salt water extrusion sluice in kandekkaduthodu near Padanna at ward 30 of Kodungallur Muncipality -Minor Irrigation Section,Kodungallur. | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | CM 51/24-25 |
| 21 | CM17/25-26 | Compressive strength of Concrete :Renovation of Chirayanchal kulam in Annamanada Panchayath-Phase II | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | CM 17/25-26 |
| 20 | CM43/25-26 | Compressive strength of Concrete : RMF–Protecting the left bank of Bharathapuzha at the backside of Ivor madom Temple in Thiruvilwamala Panchayath in Thrissur District-General Civil work- Irrigation Section, Kunnamkulam. | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | CM 43/25-26_ |
| 19 | CM50/25-26 | Compressive strength of Haradened Concrete :Rebuilt Kerala Initiative -Rectification of works at Idiyanchira regulator(civil works)-General civil works, – Irrigation ,Section,Enamakkal. | Assistant Engineer,Quality Control Section,Thrissur. | 03.05.2025 | |
| 18 | CM20/25-26 | Compressive strength of Concrete Core:Construction of Boat Jetty in Thrissur District. | Assistant Engineer,Irrigation Section, Kunnamkulam. | 02.05.205 | |
| 17 | CM47/25-26 | Compressive strength of Paving Blocks:General- DRIP-Phase II Rehabilitation & Improvements of basic facilities of Kanjirapuzha Dam Providing additional facilities to existing control room,Turfing on D/S of Dam ,Construction of horizontal and vertical chute drain,Providing stilling pool,Providing stilling pool,Surveying periphery of water spread area,Investigation works for bridge and watch tower-Appendix 111-Construction of approach road to -500m. | Assistant Engineer, KPIP Section 4/3,Kanjirapuzha-678 591 | 30.04.2025 | |
| 16 | CM46/25-26 | Compressive strength of Hardened Concrete: Construction of checkdam cum bridge at Karichalkadavu in Kattakambal Gramapanchayath. -Minor Irrigation Section,Kunnamkulam. | Assistant Engineer, Quality Control Section ,Thrissur. | 30.04.2025 | CM 46/24-25 |
| 15 | CM38/25-26 | Compressive strength of Hardened Concrete: Construction of checkdam cum bridge at Karichalkadavu in Kattakambal Gramapanchayath. -Minor Irrigation Section,Kunnamkulam. | Assistant Engineer, Quality Control Section ,Thrissur. | 30.04.2025 | CM 38/25-26 |
| 14 | CM24/25-26 | Compressive strength of Hardened Concrete: Construction of checkdam cum bridge at Karichalkadavu in Kattakambal Gramapanchayath. -Minor Irrigation Section,Kunnamkulam. | Assistant Engineer, Quality Control Section ,Thrissur. | 30.04.2025 | |
| 13 | CM39/25-26 | Test on Fencing Materials :Assessing the quality of materials in the materials to be used in Solar Hanging Fencing for 11.9 km from Koshimukku to Palakkunnu under Mannamangalam Forest Station. | Range Forest Station,Pattikkad P O ,Thrissur. | 28.04.2025 | CM 39/25-26 |
| 12 | CM03/25-26 | Test on Steel Bars:Report of the Tests on Steel Bars Supplied by Assistant Engineer, PWD Buildings Section No:2,Ayyanthole,Thrissur. | Assistant Engineer, PWD Building Section No.2,Ayyanthole,Thrissur. | 28.04.2025 | CM 03/25-26 |
| 11 | CM02/25-26 | Test on Concrete Solid Blocks:Report of the Test Conducted on Concrete Solid Blocks Supplied by the Assistant Engineer,PWD Buildings Section No.2,Ayyanthole ,Thrissur. | Assistant Engineer, PWD Building Section No.2,Ayyanthole,Thrissur. | 28.04.2025 | CM 02/25-26 |
| 10 | CM29/25-26 | Test on Steel: Report of the Tests on Steel Bars Supplied by Assistant Engineer, LID & EW Section ,Nadathara Gramapanchayath. | Assistant Engineer, LID & EW Section,Nadathara Grama Panchayath. | 23.04.2025 | CM 29 /25-26 |
| 9 | CM22/25-26 | Tests on ACSR WOLF Conductor: Conducting mechanical tests on ACSR WOLF Conductor. | Assistant Engineer, KSEB Ltd, Line Maintenance Section, Viyyur, Thrissur. | 21.04.2025 | CM 22/25-26 |
| 8 | CM37/25-26 | Compressive strength of Hardened Concrete: Provision of new 6 m wide Foot Over Bridge at 5 stations-GUV,AFK.ALLP.TRVI,KYJ and one 12 m wide FOB at NCJ.. | Senior Section Engineer Works /Gati Shakti Trivandrum. | 21.04.2025 | CM 37/25-26. |
| 7 | CM25/25-26 | Test on Steel: Kadappuram Gramapanchayath – Annnual Plan – Project No.219/23-24 Construction of Vattekkad FWC. | Assistant Engineer, LSGD, Kadappuram Gramapanchayath. | 19.04.2025 | CM 25/25-26 |
| 6 | CM21/25-26 | Sheet pile: Report of the Tests on Z Sheet Pile Supplied by the Assistant Engineer, Irrigation Section No.2, Ponnani.-CSIND – Construction of Lock cum bridge in CH: 316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Disi. | Assistant Engineer, Irrigation Section No.2, Ponnani | 19.04.2025 | CM 21/25-26 |
| 5 | CM12/25-26 | Non Destructive Tests of Concrete: Ultrasonic Pulse Velocity Test & Rebound Hammer Test,Boat Jetty at Palliyath near Thookkupalam in Perallasserry Grama Panchayath ,Kannur District. | Assistant Engineer,Inland Navigation Section ,Pazhayangadi,Kannur. | 16.04.2025 | CM 12/25-26 |
| 4 | CM01/25-26 | Mix Design Interim Report:Interim Report of the Concrete Mix Design -M25 (ACC PPC ) Carried out for the Assistant Engineer, PWD Buildings Section No.2 Ayyanthole,Thrissur. | Assistant Engineer,PWD Building Section No.2 Ayyanthole,Thrissur. | 15.04.2025 | CM 01/25-26 |
| 3 | CM09/25-26 | Compressive strength of Hardened Concrete: Construction of checkdam cum bridge at Karichalkadavu in Kattakambal Gramapanchayath. Deck slab AB4- Minor Irrigation Section Kunnamkulam. | Assistant Engineer, Irrigation Quality Control Section, Thrissur. | 09.04.2025 | CM 09/25-26 |
| 2 | CM08/25-26 | Compressive strength of Hardened Concrete: Construction of checkdam cum bridge at Karichalkadavu in Kattakambal Gramapanchayath. Deck slab AB2– Minor Irrigation Section Kunnamkulam. | Assistant Engineer, Irrigation Quality Control Section, Thrissur. | 09.04.2025 | CM 08/25-26 |
| 1 | CM06/25-26 | Compressive strength of Hardened Concrete: GENERAL-Budget 2021-22 – Improvements to Kidayichira in Velur Gramapanchayath. – Minor Irrigation Section Wadakkanchery. | Assistant Engineer, Irrigation Quality Control Section, Thrissur. | 09.04.2025 | CM 06/25-26 |